1
© by NECTA VENDING SOLUTIONS SpA 09-2003 228 00
TABLE OF CONTENTS
INTRODUCTION PAGE 2
IDENTIFICATION OF THE VENDING MACHINE PAGE 2
IN THE EVENT OF FAILURES PAGE 2
TRANSPORT AND STORAGE PAGE 2
USING THE VENDING MACHINE PAGE 3
POSITIONING THE VENDING MACHINE PAGE 3
WARNING FOR INSTALLATION PAGE 3
PRECAUTIONS IN USING THE MACHINE PAGE 3
WARNING FOR SCRAPPING PAGE 3
TECHNICAL SPECIFICATIONS PAGE 4
POWER CONSUMPTION PAGE 5
ACCESSORIES PAGE 5
INSTALLATION PAGE 5
UNPACKING THE VENDING MACHINE PAGE 5
CONNECTION TO THE POWER SUPPLY PAGE 6
CONNECTION TO THE WATER MAINS PAGE 6
CONTROLS AND INFORMATION PAGE 7
NOISE LEVEL PAGE 7
DOOR SWITCH PAGE 8
INITIALISING PAGE 8
FILLING THE WATER SYSTEM PAGE 8
INSERTING THE LABELS PAGE 8
MAINTENANCE AND DISINFECTION PAGE 9
SANITISING THE MIXERS AND
FOODSTUFF CIRCUITS PAGE 9
WASHING THE MIXERS PAGE 10
LOADING PAGE 10
LOADING COFFEE PAGE 10
LOADING INSTANT PRODUCTS PAGE 10
CLEANING THE WATER SUPPLY TANK PAGE 10
CLEANING THE WASTE TRAYS PAGE 10
WEEKLY CLEANING OF COFFEE UNIT PAGE 11
SUSPENDING FROM USE PAGE 11
INSTALLING THE PAYMENT SYSTEM PAGE 11
COFFEE UNIT OPERATION PAGE 12
COFFEE DISPENSING CYCLE PAGE 12
CHECKING AND ADJUSTING
THE MACHINE SETTINGS PAGE 12
STANDARD SETTINGS PAGE 13
ADJUSTING THE BREWING
CHAMBER VOLUME PAGE 13
ADJUSTING THE GRADE OF GRINDING PAGE 13
ADJUSTING THE COFFEE DOSE PAGE 13
OPERATING MODES PAGE 14
NORMAL OPERATING MODE PAGE 14
MAINTENANCE MODE PAGE 14
FILLING THE CHANGE TUBES PAGE 15
AUTOTEST PAGE 15
EMPTYING THE AIR-BREAK PAGE 15
DISPLAYING THE STATISTICS PAGE 15
PRINTING THE STATISTICS PAGE 16
RESETTING THE STATISTICS PAGE 16
GENERAL COUNTER PAGE 16
PROGRAMMING PAGE 16
DISPLAYING THE EXISTING FAILURES PAGE 17
PROGRAMMING THE WATER AND
POWDER DOSES PAGE 18
PROGRAMMING THE PRICES PAGE 18
PROGRAMMING THE PRICES AND
THE PUSH-BUTTON STATUS PAGE 18
PROGRAMMING THE BASIC COIN
AND THE DECIMAL POINT PAGE 18
PAYMENT SYSTEMS PAGE 18
PROGRAMMING THE VALIDATOR PAGE 19
PROGRAMMING THE MDB DATA PAGE 19
INITIALISING PAGE 20
SETTING THE MACHINE CODE PAGE 20
MACHINE CONFIGURATION PAGE 20
FAST CYCLES PAGE 21
SELECTION COUNTER PAGE 21
SETTING THE PROMOTIONAL MESSAGE PAGE 21
LANGUAGE SELECTION PAGE 21
WHIPPING TIME PAGE 21
PROGRAMMING ACCESS PASSWORD PAGE 21
SPECIAL SALES PAGE 21
SETTING THE CLOCK PAGE 21
AUTOMATIC WASH PAGE 21
SETTING THE TIME BAND PAGE 21
SETTING THE TIME BAND PRICES PAGE 21
CONSECUTIVE SELECTIONS PAGE 22
TEMPERATURE SETTING PAGE 22
DISPLAY PRE-SELECTIONS PAGE 22
DIRECT FUNCTIONS PAGE 22
INSTALLATION PAGE 22
RESETTING THE FAILURES PAGE 22
MAINTENANCE PAGE 22
INTRODUCTION PAGE 22
BREWER UNIT MAINTENANCE PAGE 23
REGENERATION OF THE SOFTENER UNIT PAGE 23
ANNUAL SANITISING PAGE 24
PRINTED BOARD FUNCTIONS
AND INDICATOR LAMPS PAGE 24
CONTROL BOARD PAGE 24
PUSH-BUTTON BOARD PAGE 25
HYDRAULIC SYSTEMS PAGE 26
MAINTENANCE MENU PAGE 27
PROGRAMMING MENU PAGE 31
WIRING DIAGRAMS PAGE 38