Metro Starsys Workcenters Back Filler Kit User Manual

WORKCENTERS
INSTALLATION
INSTRUCTIONS
1. Use the filler plate (Qty.2) as a template to position unit relative to the wall.
2. Level base unit, attach to wall, and secure countertops following the steps outlined in the Starsys WorkCenters Installation Manual. (Shipped in each base unit)
3. Align and mount the back extrusion (Qty. 2) to wall - this may require trimming the extrusion. (Mounting hardware not included)
4. Locate back edge of filler plate within the groove of the wall-mounted extrusion.
5. Align holes in filler plate with back extrusion groove as shown, fasten in place with screws provided. (Qty. 6)
Note: Filler plates can be trimmed, punched, or drilled to accommodate utilities as needed.
Part No. INST-BFLR30
Date: 10/09/01
Loading...