Metro PBH3060C User Manual

Page 1
GRID ACCESSORIES
MONITOR SHELF
GRID SHELF
HANGING FILE HOLDER
CATALOG/FILE HOLDER
11" BIN HOLDER
22" BIN HOLDER
OVERHEAD LIGHTGRID ACCESSORIES
TILT-ADJUSTING SCREW - USE HEX WRENCH
BULBS NOT INCLUDED
MONITOR SHELF (END VIEW)
SUPPORT
BRACE (2)
Attach Bin Holders by first sliding top corner tabs up behind a horizontal Grid rod, then press Bin Holder against the Grid and slide down until the Bottom corner tabs are behind the next horizontal Grid rod down.
GRID
(END VIEW)
TO
FRONT
HANGING FILE HOLDER
(END VIEW)
GRID SHELF (END VIEW)
CATALOG/FILE HOLDER
(END VIEW)
USE TWO TIE WRAPS TO SECURE CORD TO POST
ESD BENCHTOP
1. Drill 3/16" dia. hole through benchtop near one of the rear corners.
2. Assemble grounding wire as shown.
3. To ensure ESD properties, tighten nut securely and connect other end of bench grounding wire to facility ground. Due to normal shrinkage and expansion of laminates, it may be necessary to retighten this connection. Periodically check for continuity to ground.
NOTE: Benchtop is conductive only if its edge banding is black.
First attach Light Supports to rear Posts on plastic sleeves positioned at the top grooves. Then attach Light to Supports as shown above by assembling the clamps around the Supports, with the bolt dropping down through the middle of the Support. Secure and tighten with threaded plastic Knob as shown.
GROUNDING INSTRUCTIONS
#10 X 1 3/4" PAN HEAD SCREW
#10 STAR WASHER ­MAKE SURE IT DIGS INTO SURFACE!
GROUNDING WIRE
BLACK EDGE
FLAT WASHERS
KEP NUT
WB
S
ORK ENCH
Assembly Instructions
MODEL NO. DESCRIPTION
PBL3060L PBL3060LP PBL3072L PBL3072LP PBL3060C PBL3060CP PBL3072C PBL3072CP PBH3060L PBH3060LP PBH3072L PBH3072LP PBH3060C PBH3060CP PBH3072C PBH3072CP
Low Profile Low Profile with Power Low Profile Low Profile with Power Low Profile Low Profile with Power Low Profile Low Profile with Power High Profile High Profile with Power High Profile High Profile with Power High Profile High Profile with Power High Profile High Profile with Power
InterMetro Industries Corporation North Washington Street Wilkes-Barre, PA 18705 (717) 825-2741
Revision C
L01-194 9/2008
Page 2
I. EXPLODED VIEW - PARTS AND ACCESSORIES GUIDE
8
2
3
4
9
A
D
E
F
WEIGHT CAPACITIES
Work Surfaces -
1000 lbs. (453 kg) evenly distributed weight
PBA-1260CQ Cantilever Shelf -
100 lbs. (45 kg) evenly distributed weight
PBA-GSD Grid Shelf -
50 lbs. (23 kg) evenly distributed weight
PBA-MS Monitor Shelf -
50 lbs. (23 kg) evenly distributed weight
Maximum Load on Grid -
250 lbs. (113 kg) total
ELECTRICAL SPECIFICATIONS
Light (PBA-LA60)
-ULListed.
- Accepts two 48" (122 cm) 32W fluorescent bulbs (not included)
- Light Level: 70 foot candles (752 lux) when measured at a distance of 39" (99 cm) from light to work surface in a parallel position utilizing two 48" (122 cm) 32W cool white fluorescent bulbs.
- 7 ft. cord
Power Strip (PBA-60PQ)
- 6 outlets
- 115V, 15A, 60 Hz continuous service
- Includes illuminated ON/OFF switch
- Protected by 15A circuit breaker
- 9 ft. cord
MAIN COMPONENTS
KEY
DESCRIPTION
Front Post
1. Rear Post (slotted) - Low Profile
2. Rear Post (slotted) - High Profile
3. Plastic Split-Sleeves
4. Footrest Frame
5. Top Frame
6. Adjustable Foot Assembly
7. Bench Top
8. Top Brace (Rear Stringer)
9. Power Strip with Brackets
10. Ledge (60" long only)
11. Aluminum Split-Sleeves
12.
7
High
Profile
Workbench
2
­2 6 1 1 4 1 1
­1 4
5
Do Not
X
Use Bottom Groove
LEVELING FOOT PAD
QUANTITY
High Profile Workbench
with Power
2
­2 6 1 1 4 1 1 1 1 4
1
37" 36" 35" 34" 33" 32" 31"
Low
Profile
Workbench
2 2
­4 1 1 4 1
-
­1 4
6
C
11
Low Profile Workbench with Power
2 2
­4 1 1 4 1
­1 1 4
12
GRID ACCESSORIES
G
L
I
H
K
J
B
10
M
AVAILABLE ACCESSORIES
KEY MODEL # DESCRIPTION
PBA-LA60
A.
PBA-1260CQ
B.
PBA-BBCQ
C.
PBA-SD6D
D.
PBA-AD6D
­PBA-SD12D
­PBA-AD12D
E.
PBA-GPCQ
F.
PBA-MS
G.
PBA-CHD
H.
PBA-GSD
I.
PBA-1BH
J.
PBA-2BH
K.
PBA-PFH
L.
PBA-60PQ
M.
*Note:For Drawer with Lock, add 'L' to end of Model Number.
Light Fixture Cantilever Shelf Bin Rail 6" Starter Drawer* 6" Add-on Drawer* 12" Starter Drawer* 12" Add-on Drawer* Grid Panel Monitor Shelf Catalog/File Holder Grid Shelf 11" Bin Holder 22" Bin Holder Hanging File Folder Power Strip
Page 3
II. BASIC WORKBENCH ASSEMBLY
1
SMALLER END TOWARD TOP
To attach components: Begin by snapping a 2-piece plastic sleeve together around each post at the groove indicated in the instructions that follow. Be sure the smaller end of the sleeve (and the ridge inside the sleeve) is toward the top of the post. Note: for attaching the top frame, use the aluminum split sleeves provided.
After placing the aluminum split sleeves on
3
the posts as shown, attach the top frame. Be sure to orient the top frame correctly
the front member that is welded directly to the collars is positioned toward the front of the bench.
hammer with a block of wood to protect the finish. Then secure in place by tapping the "C" rings into place.
FRONT OF TOP FRAME
KEYHOLE- SHAPED HOLES
Split Sleeves on
Seat the frame firmly using a
KEYHOLE- SHAPED HOLES
Set ALUMINUM
TOP Groove
on front Post
Set
Split
so that
ROUND HOLES
ALUMINUM
Sleeves on
the same
Groove
as on the
Front Posts
2
HIGH PROFILE
FRONT POST
LOW PROFILE
BACK DOWN
NOTE BLACK RIMS AT BOTTOMS OF BLUE POSTS
FRONT POST
1. Thread jam nuts half way onto the 4 Foot Pads as shown, then screw leveling feet into foot posts - tighten jam nuts later.
2. Choose the approximate bench height you want and place the small split sleeves on the appropriate grooves on the 4 Foot Posts as shown at right (same groove on all 4).
3. Insert the completed Foot Assemblies into the bottom ends of the blue bench posts.
Locate the 2 front (unslotted) and 2 rear (slotted) Posts and the Footrest Frame. First lay carpet or similar material down on floor to protect finish. Attach plastic sleeves at the first or second groove near the bottom of each Post. Assemble the 4 Posts and the Footrest Frame as shown above, with the unit on its back, by sliding the Posts up into the collars on the Footrest Frame.
fully so the slots are facing exactly front and rear.
shown above or with the long footrest tube closer to the back of the bench. Put 4 Adjustable Foot Assemblies together as shown above and install in the bottom ends of the 4 Posts. Set the bench upright and seat the Footrest Frame collars firmly down onto the plastic sleeves, using a hammer and block of wood or rubber mallet (to protect finish). Should you ever desire to readjust bench height, carefully lay Workbench down on its back , grip foot posts firmly with vice-grip pliers, then tap against pliers with hammer or mallet until Foot Assembly comes back out of Post. Then move split sleeves to different groove locations and proceed as above.
4
Set Benchtop in place on the Top Frame and ensure that it is centered left-to-right and all the way back against the Rear Posts. Attach it with the screws provided as shown.
FOOTREST FRAME
REAR POST - NOTE SLOTS FACING UP.
FOOT PAD
JAM NUT
X
SMALL SPLIT SLEEVE
ADJUSTABLE FEET
4. After Workbench is upright in desired
Do Not
X
Use Bottom Groove
location, rotate Foot Pad for fine
LEVELING FOOT PAD
adjustment, then tighten jam nut.
Rotate Rear Posts care-
Note that the Footrest can be attached either as
37" 36" 35" 34" 33" 32" 31"
Set
Plastic
Split
Sleeves
on
first or
Snap on "C" Rings.
High Profile only - attach Top Brace on
5
second
Groove
plastic sleeves set on the third groove down from the top of each Rear Post.
TOP BRACE
HIGH PROFILE ONLY
END VIEW
H-FRAME IN PLACE
OPTION: ATTACH DRAWER ASSEMBLY
Attach Starter Drawer Assembly as shown at left. First insert the
ROUND HOLES
KEYHOLES
SHOULDER RIVETS
REAR
two straight pins on the back of the drawer assembly into two ROUND HOLES in the back of the top frame (under the benchtop). Note that drawer can be attached under the top at several positions left-to­right. Next, insert the shoulder rivets on the top front of the drawer assembly into two KEYHOLES in the front of the top frame. Be sure the rivets drop down into the narrow parts of the key holes and lock in place.
Optional Add-on Drawer attaches to sides of Starter Drawer Assembly with screws as shown below.
Page 4
III. GRID AND ACCESSORIES
1
2
Install qwikSLOT clipsinthe4th& 5th slots below the top brace.
qwikSlot Clip
Install qwikSLOT clipsinthe6th& 7th slots above the top frame.
Hang grid on 2nd hori­zontal wire from the top and the 3rd horizontal wire from the bottom.
Snap QuikSlot Clips into the slots on the backs of the Rear Posts as shown at left. Hang Grid on QuikSlot Clips, then secure to the Top Brace and the back of the Top Frame as shown at right.
FOR SAFETY'S SAKE, BE SURE TO CORRECTLY INSTALL THE TOP AND BOTTOM BRACKETS
TOP GRID SUPPORT BRACKET
To Front
4
Hang the bottom bracket over the bottom of the grid at the center.
3
ADJUSTABLE SHELF BRACKET
SLOTTED REAR POST
BIN BAR END VIEW
First attach 2 brackets to rear posts as shown...
BENCHTOP
BACK OF TOP FRAME
...then attach Bin Bar to brackets with screws provided.
GRID
Drive screw (with washer) through Bracket, through center hole on back of Top Frame.
Rotate Tab Up to Lock in place.
CANTILEVER SHELF (END VIEW)
CANTILEVER SHELF
To attach cantilever shelf brackets, follow the 3 steps above, first hooking the top tab of each shelf bracket into the appropriate slot in the Rear Post, and then swinging the other tabs into the slots below. Be sure to seat the shelf bracket firmly into place - tap down lightly with a rubber mallet or hammer and wood block next to the Post if necessary. Then position wire shelf on top of brackets, centered left-to-right. Attach through the double wires to brackets with screws as shown above.
Attach Shelf to Brackets through the double wires.
OUTLET BAR
LEDGE
CANTILEVER SHELF
OUTLET BAR
END VIEW
BIN BAR
First attach 2 brackets to rear posts as shown...
...then attach Outlet Bar between brackets with screws provided.
LEDGE
To install the ledge, remove the backer from the mounting tape on the bottom and apply to rear edge of top as shown at left. If you have a
72" top, center the ledge left to right.
Loading...