Installation & Maintenance Data
Electrical S ubbase Installation
An electrical subbase is optional for all 208V and 230V units. The standard subbase is available with 3” (76 mm) or 4” (102 mm) heights. The subbase contains leveling legs for adjustment of up to 1” (25 mm) additional height. All subbases are factory supplied.
IM 421-5
Group: PT AC Part No.: 106018551 Date: May 2000
Installation
Install the subbase as follows:
1. If the maximum depth subbase is required, discard the side extension pieces.
2.
If more than the minimum depth is required, determine the
depth of the side extension pieces desired and break at the proper score line. Insert the extension pieces into the front assembly and secure with two short black screws at each side.
3. Insert leveling bolts into subbase bottom flange. Four (4) bolts are required if side extensions are used.
Standard electrical subbase
3" x 5" (76 to 127mm) Opening for Electrical and/or Drain Rough-In
Knockouts for
Optional Fuse &
Disconnect Switch
Electrical Junction Box for Main Power Connection
Receptacle (Req’d on 265V Units)
Plug/Cord Cover (Req’d on 265V Units)
5
⁄8"
(16mm)
4. Place the subbase on the floor and align its center line with the center line of the wall opening. Do not fasten the subbase to the floor. For the Suite II, attach the subbase to the wall sleeve using the clips provided with the subbase. For the type EA, secure the subbase to the wall sleeve by aligning the wall sleeve clearance holes with the subbase engagement holes; secure with the screws provided.
5. The wiring should be roughed in and the conduit connected to the subbase junction box. Complete the installation by wiring the receptacle to the incoming power supply. For 265V units, bolt plug/cord cover to subbase. Covers for the type EA and Suite II are of different design, but mount in the same manner .
7
⁄8"
(22mm)
3"
21⁄2"
(63.5mm)
5"
(127mm)
Leveling Screw (4 Places)
Front Elevation (Three Front Panels in Place)
17"
(432mm)
C
L
Electrical Knockouts
Plan
411⁄2"
(1054mm)
12"
(305mm)
0" (0mm) to 93⁄8"
(238mm)
43⁄8" (111mm)
11⁄2" (38mm)
3" (76mm) or 4" (102mm)
0" (0mm) to
1" (25mm)
Exploded view of standard electrical subbase
TELESCOPING
SIDE EXTENSIONS
REMOVABLE JUNCTION BOX COVER
T-CLIPS
1 INCH ADJUSTABLE
AAF–McQuay Incorporated 4900 Technology Park Boulevard, Auburn, New York 13021-9030 USA (315) 253-2771
Printed on recycled paper containing at least 10% post-consumer recycled material.
LEVELING LEGS
©2000 AAF–McQuay Incorporated IM 421-5 (Rev. 5/00)
OPTIONAL, FACTOR Y INST ALLED FUSED DISCONNECT & RECEPT ACLE
PLUG/CORD COVER (REQ’D FOR 265V)
Loading...