K00042 STACKING KIT
Installation Instructions
The K00042 stacking kit is used for stacking a G-0600 ice
machine on an E-1100 ice machine. The bin must be leveled
before proceeding.
Installing the E-1100 Ice Machine
1. See service manual for uncrating and inspection of ice
machine.
2. Remove top cover and side panels from ice machine.
3. Set ice machine carefully and squarely on bin.
4. Position top cover from kit on right-hand side of ice
machine. Position left-hand top cover. Attach water
shield to right-hand top cover on flange with one #8 x
1/2” long sheet metal screw from kit (see Illustration 1).
5. Apply foam tape from the kit, as shown in Illustration 1.
Installing the G-0600 Ice Machine
1. See service manual for uncrating and inspection of ice
machine.
2. Remove top cover and side panels from ice machine.
3. Set G-0600 on top of E-1100 with backs of both
machines being flush.
4. Remove screw from rear panel of G-0600 and screw from
E-1100 in area of electrical hook-up (rear panel). Apply
rear-locking plate using existing screws that were
removed. With offset rear locking plate fastened, the left
and right side of the G-0600 should be sitting on the E1100 top covers, as shown in Illustration 2.
5. Before applying RTV sealant in designated areas to insure
against leaks or water hang-up, as shown (Illustration 2),
remove the water pump, water curtain, and water trough.
After sealing the seams with RTV, replace the water
pump, etc.
Manitowoc Ice, Inc.
2110 South 26 Street, P.O. Box 1720, Manitowoc, WI 54221-1720 USA 8002033
Telephone 920-682-0161, Fax - Sales: 920-683-7589, Service/Parts: 920-683-7585, Other: 920-683-7879 Rev. 05/16/01
Installing the Ice Chute
1. Attach bottom mounting bracket from kit to the front base
channel of the E-1100 using two #10-24 x 5/8” long sheet
metal screws provided (see Illustration 2 and 3).
2. Remove angle “A” from upper G-0600 (see Illustration
2).
3. Attach top mounting bracket from kit to top rail of E-
1100 using existing screw.
4.
Reattach angle “A” to G-0600.
5.
From the upper ice machine, carefully bring the ice chute
down in place until the weld studs located on the ice
chute go through the slotted holes in the bottom mounting
bracket. Secure with four wing nuts provided in the kit.
6.
Check for free movement of the water curtains on both
the G-0600 and E-1100 ice machines (styrene covers over
evaporators).
7. Reattach all panels of both ice machines.
8. Proceed to ice machine service manuals for electrical and
water hook-ups and start-up procedure.
Parts List
Qty. Description Part No.
1 #8 x 1/2” lg. Sheet Metal Screw ...... 5121531
2 #10 -24 x 5/8” lg. Sheet Metal
Screw ............................................... 5202053
4 #8-32 Wing Nut .............................. 5489021
1 Top Mounting Bracket .................... 6625414
1 Bottom Mounting Bracket ............... 6606514
1 Water Shield .................................... 6625114
1 Top Cover ....................................... 6852514
1 LH Top Cover ................................. 6625314
1 Ice Chute ......................................... 6625214
1 Rear Locking Plate .......................... 6242914