Manitowoc Ice K00017 User Manual

K00017 STACKING KIT
Installation Instructions
1. The K00017 stacking kit is used for stacking an E-0400
on an E-0600 ice machine. The bin must be leveled before proceeding. NOTE: THIS STACKING KIT IS ALSO USED, WHEN STACKING G-0600 ON G-0800 ICE MACHINES.
A. See service manual for uncrating and inspection of
ice machine.
B. Remove top cover from ice machine (NOTE: do not
put screws back in.). C. Set ice machine carefully and squarely on bin. D. Position shim angle, provided in kit, on right side, as
shown in Illustration 1. E. Add foam tape, as shown in Illustration 1. F. With four screws, install top cover from kit on left
side of ice machine (NOTE: flange goes over side
panel.). G. Remove right-hand side panel.
3. INSTALLATION OF E-0400 ICE MACHINE: A. See service manual for uncrating and inspection of
ice machine.
B. Remove right-hand side panel and bottom four
screws on left-hand side panel.
C. Set E-0400 ice machine on E-0600 ice machine with
right-hand sides in line (NOTE: flange on top cover
should be inside left-hand side panel.). D. Install four screws in bottom left-hand side panel. E. Bolt right-hand sides of ice machines together with
1/4-20 x 5/8” long bolt, lock washer, and nut,
provided in kit. F. Reattach right-hand side panels.
Manitowoc Ice, Inc.
2110 South 26 Street, P.O. Box 1720, Manitowoc, WI 54221-1720 USA Telephone 920-682-0161, Fax - Sales: 920-683-7589, Service/Parts: 920-683-7585, Other: 920-683-7879 8001403 Web Site - www.manitowocice.com Rev. 05/11/01
4. INSTALLATION OF WATER SHIELD: A. Remove angle “A”, the water pump, float valve
bracket assembly, and sump trough from top ice machine.
B. Remove existing sheet metal screw at lower right
corner of bulkhead below siphon tube. Locate water shield above the lower machine’s electrical box. Use existing screw to fasten flange of shield to bulkhead. Apply RTV sealant to the top edges of flange to provide a watertight seal.
C. Reinstall the sump trough, float valve bracket
assembly, and water pump.
5. INSTALLATION OF ICE CHUTE: A. Remove the ice chute from kit and set bottom
mounting brackets over angle “B” on E-0600 ice machine (Illustration 3).
B. Put angle “A” in slots of top mounting brackets and
secure in place. C. Check for free movement of water curtains. D. Proceed to ice machine service manuals for electrical
and water hook-up and start-up procedure.
Loading...