
 K00014 STACKING KIT 
                         Installation Instructions
1. The K00014 stacking kit is used for stacking a G-
0400 or G-0600 on an E-0200, E-0400, G-0400, or 
G-0600 ice machine. 
: Bin must be level before proceeding to Step 
Note
2. 
2. Installation of Ice Machines: 
A. See service manual for uncrating and inspection 
of both ice machines. 
B. Remove top cover from lower ice machine. 
C. Set ice machine carefully and squarely on bin. 
D. Remove backing paper from 1” square of 
double-sided tape and place tape in center of 
shim. Remove the remaining backing paper and 
match slot in shim to hole in ice machine frame, 
as shown in Fig. 1. Press in place. Repeat for 
opposite side. 
E. Set top ice machine carefully and squarely on 
bottom ice machine. 
F. Remove front and side panels from both ice 
machines. 
G. Bolt two ice machines together with 1/4-20 x 
5/8” long bolt, lockwasher, and nut provided in 
kit, one each side. 
H. Remove angle A (Fig. 1) and set aside. 
Manitowoc Ice, Inc.                                                                              
2110 South 26 Street, P.O. Box 1720, Manitowoc, WI 54221-1720 USA                                                                     
Telephone 920-682-0161, Fax - Sales: 920-683-7589, Service/Parts: 920-683-7585, Other: 920-683-7879                       8001243 
Web Site - www.manitowocice.com                                                                           Rev. 01/13/00            
3. Installation of Water Shield: 
1. Remove the water pump, float valve-bracket 
assembly, and sump trough from top ice 
machine. 
2. Locate the water shield above the electrical box 
of the lower ice machine, as shown in 
Illustration 2. It will be secured using the 
existing screw in the lower right-hand corner of 
the top ice machine, as shown in Illustration 2. 
3. Reinstall the sump trough, float valve-bracket 
assembly, and water pump 
4. Installation of Ice Chute: 
A. Remove ice chute from kit and set bottom 
mounting brackets over angle B (Fig. 1). 
B. Put angle A in slots of top mounting brackets 
and secure in place. 
C. Check for free movement of both water curtains. 
D. Proceed to ice machine service manual for 
electrical and water hook-up and start-up 
procedure. 
E. Reattach front and side panels. 
F. Add four sheet metal screws to side panels, two 
on each side of lower ice machine, where the 
lower and upper ice machines butt.