   J-1800 COMPRESSOR REPLACEMENT  
Installation Instructions 
Piping: 
Some repiping of refrigerant tubing is required. As you are viewing the ice machine from the front, the r eplacement 
compressor is mounted with the suction, discharge, and process ports facing the right side. With the existing tubing, 
reposition the discharge and process tube to the ports provided on the new compressor.  With the suction tube provided 
with the compressor, insert unswedged end into the suction port, line up to the existing suction line, mark the line, and cut 
to fit. Note:  reducer bushings are provided for suction and process ports. 
Wiring: 
The existing compressor and crankcase heater wire leads must be replaced with the wire leads provided. These wires are 
longer and connect to the same terminals (refer to wiri ng diagram). Note: new run capacitor must 
phase compressor. 
Manitowoc Ice, Inc.
2110 South 26 Street, P.O. Box 1720, Manitowoc, WI 54221-1720 USA                                                   
8011043                                                                                     
Telephone 920-682-0161, Fax - Sales: 920-683-7589, Service/Parts: 920-683-7585, Other: 920-683-7879                        
08/12/97 
 be installed on single