LSC Lighting Redback Wallmount Installation Guide

Wallmount Dimmer Installation Guide
Site/Job Name ..........................................................................................................................
Commissioning Date ................................................................................................................
Engineer/Technician ................................................................................................................
LIGHTING SYSTEMS
www.lsclighting.com
INPUT WIRING TERMINATION
E
INSTALLATION CHECKLIST
£
Chassis correctly mounted with both top and bottom fasteners installed 4 places
£
Top and Bottom Ventilation holes are clear and free from debris
£
Rack Spacing and layout complies with installation guide diagram.
£
Wall structure is within guidelines for the mounting of electrical equipment
CONTROL INTERFACE CHECKLIST
These checks should be performed before power is applied to the rack.
¨
DMX cable is RS485 compliant or shielded CAT5 cable
¨
Remote wall plate cabling is 8 wire CAT5 type if applicable
¨
DMX cable correctly terminated if applicable
¨
All wall plates correctly wired and installed
¨
DMX termination switch is set correctly within Rack
REDBACK RACK WIRING CHECKLIST
These checks should be performed before power is applied to the rack.
¨
Mains input wiring is correctly terminated
¨
All mounting/termination screws are tight
¨
Neutral per load, no floating neutrals or Earths in the system
¨
Check Phase to Earth impedance
¨
Check Phase to Phase impedance
¨
Check Phase Neutral impedance =1.5K +/- 200 ohm
-
-. () . ( )
›100K ohm
›=2.8K ohm
. ( )
392.0 mm 6CH
659.0 mm 12CH
1015.0 mm 24CH
Mounting Holes
to suit M6 or
¼ inch Fasteners
4 Places
150.0 mm
Min
200mm
N L3 L2 L1
RJ45 REDPLATE (UNDERSIDE)
Pin3 DMX PLUS Pin2 DMX MINUS Pin1 COM
RJ45 REDPLATE (UNDERSIDE)
Pin1 COM
Pin2 DMX MINUS
Pin3 DMX PLUS
POWER UP CHECKLIST
The following checks are performed with power applied to the rack.
¨
Measure Neutral to Earth Voltage 15V
N-E =.........................V
¨
Measure Neutral to Line L1 L2 and L3 voltage
L1-N =.........................V
L2-N =.........................V
L3-N =.........................V
¨
Measure Phase to Phase L1-L2 L2-L3 L3-L1 voltages
L1-L2 =.........................V
L2-L3 =.........................V
L3-L1 =.........................V
¨
Test Output circuits for any fault condition
¨
All cover plates in place and conduit air gaps sealed
WARNING! - DO NOT MEGGER TEST ANY WIRED CONNECTIONS TO THE RACK
Redwall install guide V1.1 Document# RBW-T02U-A1
,
()
‹=
,,
166.0 mm
Min
300mm
FLOOR