LR Baggs Five.O. Ukulele Pickup User Manual

FIVE.O
UKUL EL E SYS TE M
Installation Manual
S TE P 1. S TRAPJ AC K/ PR EAMP INST AL LATION
Drilling the strapjack hole
Drill a clean ½” hole in the tail-block for the strapjack. Remove wood shavings & dust from inside the uke.
Installing the strapjack
Remove the strap ring, retaining nut and one washer from the end of the jack. There should still be one star locking
tail-block
washer, one  at washer and a nut remaining on the jack. Bring the jack down through the soundhole into the body and insert it into the pre-drilled hole in the tail block. Using the internal nut (be sure to include the  at and star wash­ers), set the proper depth that will allow the entire smaller threaded section to protrude from the instrument (see  g-
 g. 1
ure 1).
With the jack in place, lay the remaining washer over the threads and attach the external retaining nut until it’s tight. Finish by attaching the strap ring (it should cover the retaining nut and washer).
STE P 2. P IC KU P IN STA LL ATIO N
Drilling the hole
Drill a hole at the far edge of either end of the saddle slot. The diameter should be the same size as the
saddle slot and no less than 3/32”. To avoid kinking and damaging the pickup, slightly round the top edge of the hole with an exacto blade or small  le.
Installing the pickup
To make installing the pickup easier, we have included a green mono lament line for pulling the pickup through the hole. There is a loop tied on one end to keep the line from falling into the instrument. Slip the side without the loop down through the hole in the saddle slot and feed it up through the soundhole. Thread the line through the hole in the guide at the end of the pickup and tie a knot to secure it (see  gure 2).
 g. 2
After the wire and line are connected, pull up on the line above the bridge and guide the pickup into the saddle slot. Using sharp cutters, remove the guide from the pickup just beyond the tapered section leaving a small portion of the soldered braid intact (approximately 1/16” long) (see  gure 3 on next page). Finally, lay the pickup down in the saddle slot.
STEP 3. FIN IS HI NG T HE I NSTA LL ATIO N
Preparing the saddle
You will need to compensate for the thickness of
Carefully trim here with sharp cutter.
the pickup by removing approximately .030” from the overall height of the saddle. NOTE: The  t of the saddle is the single most important factor for the installation. The bottom of the saddle should be perfectly  at. The ideal saddle  t is loose
 g. 3
enough to remove with your  ngertips, but will not fall out by itself.
Battery placement
Place the battery in an easily accessible spot with the velcro pad included. Be sure to clean the area thoroughly before installing.
Volume wheel placement
Find a suitable location near the top inner edge of the soundhole for the volume pot. Clean the area, peel off the backing from the adhesive and put the pot into place.
Secure all wires with the wire clips provided and re-string the uke. You are done.
PACKA GE CON TE NT S
One (1) Undersaddle pickup and endpin preamp with attached volume control and battery connector One (1) Green monolament line for pickup installation Two (2) CR2032 3V lithium coin cell battery Three (3) Self-stick wire clips One (1) Manual
OVERV IEW A ND C AU TI ON S
This product must be installed by a professional luthier to qualify for warranty coverage. Technical assistance will not be provided for home or hobbyist installations.
REgiS TER ThiS pRodUcT
online at www.lrbaggs.com
Loading...