Legrand CCWB User Manual

INST-CCWB-001
® electrical systems conform to and should
Typical CCWB Series Wall Box
INSTALLATION INSTRUCTIONS
Products Covered:
Wall Box Cat. No.: CCWB
Wiremold/Walker be properly grounded in compliance with requirements of the current National Electrical Code or codes administered by local authorities.
IMPORTANT: Please read all instructions before beginning.
CAUTION: Do not operate resurfacing equipment over surface of covers. This may result in damage to the surface finish of the product.
CAUTION: Box has no after set adjustment.
Step 1 Build and position wall box frame in accordance with wall plans or blueprint.
Note: Wall box frame size will depend on wall box dimensions. Please consult factory for correct dimensions.
Step 2 Install wall box into wall box frame and secure using #10 wood screws.
Step 3 Remove electrical and data panels.(If supplied with Box) Remove knockouts where required. Attach conduit for power and data cables using UL Listed components. All openings and unused knockouts must be closed or sealed off during final installation with UL Listed components. Re-install electrical and data panels.
Step 4 Install cover assembly over wall covering using spacer/latch plate and supplied hardware.
Loading...