La Pavoni P180 User Manual

P180
®
Cod. 2850019 - Rev. 00 - Marzo 2009
TECHNICAL FEATURES
Weight: 43 Kg
Voltage supply: 230 Vac. 50 Hz or 120 Vac. 60Hz on request
Absorbed power: 1,7 KW
Selections: 9 selections.with 2 sugar sekections
Payment systems options:
12VAC or 24VAC coin acceptors
Executive / MDB (optional kit)
Pag. 2
Pag. 31
GRINDER
You can adjust the quantity of ground coffee through a screw (2); the more you unscrew it, the more the quantity increases.
If you want to adjust the grinding degree, first you have to push the catch (6), then you have to screw clockwise the grind-stone holder (1) for a finer grinding, while counterclockwise for a thicker one.
Before starting the grinder, make sure the catch is again in one of the grind-stone holder holes.
The grinding adjustment result is not immediate but you need 2/3 espresso cycles before the real grinding degree is done. After that you can adjust again if you need it.
Pag. 30 Pag. 3
INSTALLATION
Before installing the machine, read carefully the manual. The installation site must be level and dry.
ELECTRIC CONNECTION
Before connecting the machine to an electric plug, please follow these precau­tions:
o The main supply must be suitable for the machine power requirements
(1600W).
o Check that the power supply voltage is the same as the one shown in the
rating label.
o Check that the main socket is correctly earthed. o If the power supply cable is to be replaced, use only original cables.
The manufacturer will not accept responsibility for any damage claiming if these precautions are not complied with.
The machine is provided with a general lighted switch, located on the back panel, and with a security push button on the chassis that will cut off the power to the electronic board when you open the door. If you want to restore the power when the door is open, take out the push button.
All the machine electric devices work with a 24 VDC voltage, except for boiler heating element and the transformer that work with 230 or 115 VAC.
LEGEND
F WATER FILTER VA ONE-WAY VALVE D LIMESTONE FILTER (OPTIONAL) CV FLOWMETER P PUMP V VALVOLA NON RITORNO C BOILER EV1 TEA ELECTROVALVE EV2 MILK & CHOCOLATE ELECTROVALVE EV3 NOT AVAILABLE EVE ESPRESSO ELECTROVALVE
GE ESPRESSO BREWER M1 TEA MIXING GROUP M2 MILK & CHOCOLATE MIXING GROUP S WASTE
U1 TEA OUTLET U2 MILK & CHOCOLATE OUTLET U3 NOT AVAILABLE UC ESPRESSO OUTLET
Pag. 4
Pag. 29
HYDRAULIC DIAGRAM
HYDRAULIC CONNECTION
IMPORTANT: THE MANUFACTURER RECOMMENDS THE INSTALLATION OF A DESCALING FILTER, THEREFORE HE WILL NOT ACCEPT RESPONSI­BILITY FOR ANY DAMAGE CAUSED BY SCALE.
The machine can be installed as follows:
Table top installation:
Connect the mains pipe to the in-let electrovalve. Check the pressure by the manometer, if it is over 1 bar, adjust it with the inside reducer.
Cabinet installation: Place the machine on the cabinet, insert the pipe with the filter, the one-way valve and the float into the 15lt tank and the grey pipe into the 5 lt waste tank.
In order to discharge the coffee pucks into a bag, fix it up to the cabinet conveyer with the special hook and insert the chute under the espresso brewer. Finally screw the machine on the cabinet.
PAYMENT SYSTEM CONNECTION
12V PARALLEL connect to keyboard connector COIN12V (see picture
at page 7).
24V PARALLEL connect to keyboard connector COIN24V (see picture
at page 7).
EXECUTIVE / MDB connect to the relative cables (optional)
After the payment system connection, you must set the kind of payment system in programming (see at page 15).
Pag. 28
Pag. 5
Loading...
+ 11 hidden pages