CHIMNEY COVER EXTENSIONS
Model Number: CHMEX8836 CHMEX8036 CHMEX8136
INSTALLATION
GUIDE
TABLE OF CONTENTS
Installation...............................................................1-2
Part No. 8110P265-60 ©2006 Maytag Appliances Sales Co. Litho U.S.A. Rev. 09/06
INSTALLATION
INSTALLATION
CHMEX8836 Chimney Cover Extension
for JXT8836 Hood
1. Mount wall bracket (supplied
with rangehood).
1
35 7/8"–70 1/4"
2. Screw lower portion of extension
onto rangehood and screw upper
portion onto wall bracket.
108” min - 148” max
Package contains:
2 - Duct covers
1 - Bag of mounting screws
CHMEX8036 Chimney Cover Extension
for JXT8030, JXT8036, JXT8042 Hoods
1. Mount wall bracket (supplied
with rangehood).
2. Screw lower portion of extension
onto rangehood and screw upper
portion onto wall bracket.
108” min - 147” max, 9’ - 12’
Package contains:
2 - Duct covers
1 - Bag of mounting screws
35 3/8"
37 7/8"–74 1/4"
37 3/8"
CHMEX8136 Chimney Cover Extension
for JXT8136, JXT8142 Hood
1. Mount ceiling plate (supplied
with rangehood).
2. Replace support arms (supplied
with rangehood) with new extension
support arms and install as shown in
hood installation instructions.
116” min - 132” max, 9.5’ - 11’
Package contains:
2 - Duct covers
4 - Support arms
2 - “U” brackets
1 - Bag of mounting screws
47" – 59”
46"
INSTALLATION
EXTENSION KIT INSTALLATION FOR CHMEX8136
Add Blockings
2
Dimensions of
Extension Arms 46”
Front
Support U Bracket
Front
Rear
Extension Arms with
Tabs position
Fasten Ceiling Plate
Fasten Support Fram
Mounting the Range Hood
1. Add and secure blockings (minimum 2x4 studs)
onto ceiling joist.
2. Center, mark and fasten Ceiling Plate onto ceiling
where hood is to be hung. Make sure front of
bracket is facing as shown on diagram.
3. Determine height of hood, measure and attach four
extension arms onto blower unit with screws provided;
use predrilled holes on blower unit and support arms.
Make sure tabs on top of the arms are facing out for the
front, and sideways for the rear, as shown on diagram.
Attach support “U” bracket.
4. Slide telescopic duct covers onto the top of the
blower unit.
5. Attach duct work to the ceiling and position the electrical.
6. Lift blower unit and fasten to Ceiling Plate (lock tabs on
support frame into slots on CeilingPlate); secure support
frame to Ceiling Plate with screws provided.
7. Connect duct work and electrical to the blower unit.
(slide duct covers up to gain access to the top of the
blower unit).