-- BSP-44-22 --
(4 PANELS, 2 CENTERS, 2 WINGS OVER HANG)
Installation Instructions
Call Jaypro Sports Equipment at 1-800-243-0533
during regular business hours for technical support.
www.jaypro.com
Page 1 of 10
JAYPRO SPORTS
(4 PANELS, 2 CENTERS, 2 WINGS OVER HANG)
BSP-44-22 PARTS LIST
ITEM # QTY DESCRIPTION
1 5 UPRIGHT FOR PERMANENT BASEBALL BACKSTOP
2 5 1-5/8” DOME CAP
3 2 1-5/8” O.D. x 112” LONG PIPE
4 16 1-5/8” O.D. x 113-1/2” LONG PIPE
5 2 1-5/8” O.D. x 82-1/2” LONG PIPE
6 5 2-1/2" DOME CAP
7 135 5/16” WASHER
8 135 5/16”-18 HEX NUT
9 135 5/16”-18 x 1-1/4” CARRIAGE BOLT
10 10 6' x 9'-8” CHAIN LINK PANEL
11 2 OVER HANG CHAIN LINK PANEL
12 2 60” LONG UPPER SIDE FRAME SUPPORT
13 5 69” LONG LOWER FRAME SUPPORT
14 3 69” LONG UPPER FRAME SUPPORT
15 32 BAND TENSION (SMALL)
16 48 BAND TENSION 2-1/2” ID
17 24 3/16” THICK BAR TENSION
18 21 BRACE BAND (SMALL)
19 34 BRACE BAND 2-1/2” ID
20 40 RAIL ENDS 1-5/8” ID
21 156 RAIL TIE
Page 2 of 10
JAYPRO SPORTS
BASEBALL 4 PANEL; BSP-44-22
INSTALLATION INSTRUCTIONS FOR
PERMANENT BASEBALL BACKSTOPS
IMPORTANT NOTICE:
1) INSPECT FOR DAMAGE. REPORT ALL DAMAGES TO TRUCKING
COMPANY.
2) BEFORE EACH USE CHECK EQUIPMENT FOR PROPER CONNECTING
HARDWARE AND STRUCTURAL INTEGRITY. REPLACE DAMAGED OR
MISSING HARDWARE IMMEDIATELY.
3) USE OF THIS EQUIPMENT OTHER THAN INTENDED, MAY BE HAZARDOUS.
4) ALTERATION OR MODIFICATION OF THIS EQUIPMENT MAY BE
HAZARDOUS AND RESULT IN INJURY. FOR REPAIR OR REPLACEMENT,
CONTACT YOUR DEALER OR JAYPRO SPORTS.
NOTE: FOR BEST RESULTS, THIS UNIT SHOULD BE INSTALLED BY A LOCAL
CONTRACTOR WHO IS FAMILIAR WITH LOCAL CONDITIONS AND BUILDING CODES.
Footing:
1. Check local building codes before starting the footing, as building codes may vary. Local
building codes should be adhered to if requirements are greater than those outlined here.
2. Space footing 10 ft on center as shown below.
Footing Layout
3. Dig a hole 18 inches square or round to a depth of 36 inches, pour a 6 inch footing and allow
curing or placing upright on two 6 inch concrete blocks.
4. Position and square the 180” long upright onto the footing base. Pour the reminder of the footing.
Allow the concrete to fully cure, per the manufacturer’s instructions, before attaching the pipe
fittings.