International Comfort Products N9MSE0261408, N9MSE0401410, N9MSE0401712, N9MSE0601410, N9MSE0601714 Installation Manual

...
INSTALLATION INSTRUCTIONS
SingleStage, PSC Blower Motor
35” Tall, High Efficiency Condensing Gas Furnace
N9MSE (A Series)
These instructions must be read and understood completely before attempting installation.
Safety Labeling and Signal Words
DANGER, WARNING, CAUTION, and NOTE
hazard seriousness. The signal word DANGER is only used on product labels to signify an immediate hazard. The signal words WARNING, CAUTION, and NOTE will be used on product labels and throughout this manual and other manual that may apply to the product.
DANGER Immediate hazards which will result in severe personal injury or death.
WARNING Hazards or unsafe practices which could result in severe personal injury or death.
CAUTION − Hazards or unsafe practices which may result in minor personal injury or product or property damage.
NOTE − Used to highlight suggestions which will result in enhanced installation, reliability, or operation.
TABLE OF CONTENTS
SAFETY CONSIDERATIONS 3..............................
INTRODUCTION 4.........................................
CODES AND STANDARDS 4................................
ELECTROSTATIC DISCHARGE PRECAUTIONS PROCEDURE 5
DIMENSIONS 6...........................................
LOCATION 7..............................................
LOCATION RELATIVE TO COOLING EQUIPMENT 9...........
AIR FOR COMBUSTION AND VENTILATION 9................
CONDENSATE TRAP 12.....................................
INSTALLATION 20..........................................
UPFLOW INSTALLATION 20.................................
DOWNFLOW INSTALLATION 21..............................
HORIZONTAL INSTALLATION 23.............................
FILTER ARRANGEMENT 25.................................
AIR DUCTS 28.............................................
GAS PIPING 28.............................................
ELECTRICAL CONNECTIONS 30.............................
JBOX INSTALLATION 32...................................
VENTING 35...............................................
SPECIAL VENTING REQUIREMENTS
FOR INSTALLATIONS IN CANADA 35........................
DIRECT VENT / 2PIPE SYSTEM 40..........................
VENTILATED COMBUSTION AIR 40..........................
TERMINATION REQUIREMENTS FOR THE
PROVINCES OF ALBERTA AND SASKATCHEWAN 40.........
Signal Words in Manuals
The signal word WARNING is used throughout this manual in the following manner:
!
WARNING
The signal word CAUTION is used throughout this manual in the following manner:
!
CAUTION
Signal Words on Product Labeling
Signal words are used in combination with colors and/or pictures or product labels.
Safetyalert symbol
When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury.
INSTALLING THE VENT TERMINATION 50....................
MAXIMUM EQUIVALENT VENT LENGTH - FEET / METERS 54.. MAXIMUM ALLOWABLE EXPOSED VENT LENGTH TABLES 56.
Use of the AHRI Certified TM Mark indicates a manufacturer’s participation in the program. For verification of certification for individual products, go to www.ahridirectory.org .
INSTALLER: Affix these instructions on or adjacent to the furnace.
CONSUMER: Retain these instructions for future reference.
Portions of the text and tables are reprinted from NFPA 54 /ANSI Z223.1, with permission of National Fire Protection Association, Quincy, MA 02269 and American Gas Association, Washington, DC 20001. This reprinted material is not the complete and official position of the NFPA or ANSI, on the referenced subject, which is represented only by the standard in its entirety.
Printed in U.S.A. 440 01 4105 00 10/22/2015
Required Notice for Massachusetts Installations
Important
The Commonwealth of Massachusetts requires compliance with regulation 248 CMR as follows:
5.08: Modifications to NFPA54, Chapter 10
2) Revise 10.8.3 by adding the following additional requirements:
(a) For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential
purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:
1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery backup is installed on the floor level where the gas equipment is to be installed. in addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified license professionals for the installation of hard wired carbon monoxide detectors.
a. In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon
monoxide detector with alarm and battery backup may be installed on the next adjacent floor level.
b. In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of
thirty (30) days to comply with the above requirement; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.
2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
3. SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than onehalf (1/2) inch in size, “GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.
4. INSPECTION. The state of local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR
5.08(2)(a) 1 through 4.
(b) EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a) 1 through 4:
1. The equipment listed in Chapter 10 entitled “Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and
2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building or structure used in whole or in part for residential purposes.
(c) MANUFACTURER REQUIREMENTS − GAS EQUIPMENT VENTING SYSTEM PROVIDED. When the manufacturer of Product Approved side wall
horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:
1. Detailed instructions for the installation of the venting system design or the venting system components; and
2. A complete parts list for the venting system design or venting system.
(d) MANUFACTURER REQUIREMENTS − GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED. When the manufacturer of a Product Approved side
wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems”, the following requirements shall be satisfied by the manufacturer:
1. The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and
2. The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.
(e) A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists
for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.
For questions regarding these requirements, please contact the Commonwealth of Massachusetts Board of State Examiners of Plumbers and Gas
Fitters, 239 Causeway Street, Boston, MA 02114. 617−727−9952
2 440 01 4105 00
Specifications are subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Safety Considerations
!
FIRE, EXPLOSION, ELECTRICAL SHOCK, AND CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in dangerous operation, personal injury, death, or property damage.
Improper installation, adjustment, alteration, service, maintenance, or use can cause carbon monoxide poisoning, explosion, fire, electrical shock, or other conditions which may cause personal injury or property damage. Consult a qualified service agency, local gas supplier, or your distributor or branch for information or assistance. The qualified service agency must use only factoryauthorized and listed kits or accessories when modifying this product.
!
FIRE HAZARD
Failure to follow this warning could result in personal injury, death, or property damage.
Solvent cements and primers are combustible. Keep away from heat, sparks and open flame. Use only in wellventilated areas. Avoid breathing in vapor or allowing contact with skin or eyes.
!
FURNACE RELIABILITY HAZARD
Failure to follow this caution may result in unit component damage.
Application of this furnace should be indoors with special attention given to vent sizing and material, gas input rate, air temperature rise, unit leveling, and unit sizing.
Improper installation, adjustment, alteration, service, maintenance, or use can cause explosion, fire, electrical shock, or other conditions which may cause personal injury or property damage. Consult a qualified service agency, local gas supplier, or your distributor or branch for information or assistance. The qualified installer or agency must use only factory−authorized and listed kits or accessories when modifying this product. Refer to the individual instructions packaged with the kits or accessories when installing.
Installing and servicing heating equipment can be hazardous due to gas and electrical components. Only trained and
qualified personnel should install, repair, or service heating equipment. Untrained personnel can perform basic
maintenance functions such as cleaning and replacing air filters. All other operations must be performed by trained service personnel. When working on heating equipment, observe precautions in literature, on tags, and on labels attached to or shipped with furnace and other safety precautions that may apply.
These instructions cover minimum requirements and conform to existing national standards and safety codes. In some instances, these instructions exceed certain local codes and ordinances, especially those that may not have kept up with
WARNING
WARNING
CAUTION
changing residential construction practices. We require these instructions as a minimum for a safe installation.
Follow all safety codes. Wear safety glasses, protective clothing, and work gloves. Have a fire extinguisher available. Read these instructions thoroughly and follow all warnings or cautions included in literature and attached to the unit.
!
CAUTION
CUT HAZARD
Failure to follow this caution may result in personal injury.
Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing, safety glasses and gloves when handling parts, and servicing furnaces.
This is the safetyalert symbol . When you see this symbol on the furnace and in instructions or manuals, be alert to the
potential for personal injury. Understand the signal words DANGER, WARNING, and
CAUTION. These words are used with the safetyalert symbol. DANGER identifies the most serious hazards which will result
in severe personal injury or death. WARNING signifies a hazard which could result in personal injury or death. CAUTION is used to identify hazards which may result in minor personal injury or product and property damage. NOTE and NOTICE are used to highlight suggestions which will result in enhanced installation, reliability, or operation.
1. Use only with type of gas approved for this furnace. Refer to the furnace rating plate.
2. Install this furnace only in a location and position as specified in the “Location” section of these instructions.
3. Provide adequate combustion and ventilation air to the furnace space as specified in “Air for Combustion and Ventilation” section.
4. Combustion products must be discharged outdoors. Connect this furnace to an approved vent system only, as specified in the “Venting” section of these instructions.
5. Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections, as specified in the “Gas Piping” section.
6. Always install furnace to operate within the furnace’s intended temperature−rise range with a duct system which has an external static pressure within the allowable range, as specified in the “Start−Up, Adjustments, and Safety Check” section. See furnace rating plate.
7. When a furnace is installed so that supply ducts carry air circulated by the furnace to areas outside the space containing the furnace, the return air shall also be handled by duct(s) sealed to the furnace casing and terminating outside the space containing the furnace. See “Air Ducts” section.
8. A gas−fired furnace for installation in a residential garage must be installed as specified in the warning box in the “Location” section. (See Figure 4)
9. The furnace may be used for construction heat provided that the furnace installation and operation complies with the first CAUTION in the LOCATION section on page 7 of these instructions.
10. These Multipoise GasFired Furnaces are CSA designcertified for use with natural and propane gases (see furnace rating plate) and for installation in alcoves, attics, basements, closets, utility rooms, crawlspaces, and garages. The furnace is factoryshipped for use with natural gas. A CSA (A.G.A. and C.G.A.) listed
440 01 4105 00 3
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
accessory gas conversion kit is required to convert furnace for use with propane gas.
11. See Table 1 for required clearances to combustible
construction.
12. Maintain a 1in. (25 mm) clearance from combustible materials to supply air ductwork for a distance of 36in. (914 mm) horizontally from the furnace. See NFPA 90B or local code for further requirements.
Table 1
POSITION
Minimum Clearances to
Combustible Materials for All Units
CLEARANCE
In(mm)
REAR 0
FRONT (Combustion air openings in
furnace and in structure)
1 (25)
Recommended for service *24 (610)
All Sides of Supply Plenum *1 (25)
Sides 0
Vent 0
Top of Furnace 1 (25)
* Consult local building codes
13. These furnaces SHALL NOT be installed directly on carpeting, combustible tile, or any other combustible material other than wood flooring. In downflow installations, factory accessory floor base MUST be used when installed on combustible materials and wood flooring. Special base is not required when this furnace is installed on manufacturer’s Coil Assembly or when Coil Box is used. See Table 1 for clearance to combustible construction information.
This furnace is designed for minimum continuous return−air temperature of 60°F (15°C) db or intermittent operation down to 55°F (15°C) db such as when used with a night setback thermostat. Returnair temperature must not exceed 80°F (27°C) db. Failure to follow these returnair temperature limits may affect reliability of heat exchangers, motors, and controls (See Figure 1) The furnace should be sized to provide 100 percent of the design heating load requirement plus any margin that occurs because of furnace model size capacity increments. None of the furnace model sizes can be used if the heating load is 12,000 BTU or lower. Use Air Conditioning Contractors of America (Manual J and S); American Society of Heating, Refrigerating, and AirConditioning Engineers; or other approved engineering method to calculate heating load estimates and select the furnace. Excessive oversizing of the furnace may cause the furnace and/or vent to fail prematurely, customer discomfort and/or vent freezing. Failure to follow these guidelines is considered faulty installation and/or misapplication of the furnace; and resulting failure, damage, or repairs may impact warranty coverage. For accessory installation details, refer to the applicable instruction literature.
NOTE: Remove all shipping materials, parts assemblies and literature before operating the furnace.
Figure 1
Freeze Protection and Return Air Temperature
SUPPLY AIR
MAX 80°F/27°C
NOTICE
IMPORTANT INSTALLATION AND START−UP PROCEDURES
Failure to follow this procedure may result in a nuisance smoke or odor complaint.
The manifold pressure, gas rate by meter clocking, temperature rise and operation must be checked after installation. Minor smoke and odor may be present temporarily after startup from the manufacturing process. Some occupants are more sensitive to this minor smoke and odor. It is recommended that doors and windows be open during the first heat cycle.
Introduction
The 4way multipoise Category IV condensing furnace is CSA design certified as: A directvent (2pipe) furnace of 40,000 BTUH through 140,000 BTUH models using outside air for combustion. The 26,000 BTUH model can use the same 2pipe venting system using outside air for combustion, but is not considered direct vent. A nondirect vent (1pipe) furnace for all models using indoor air for combustion or from a well ventilated attic or crawl space, where permitted by local code. (See Figure 3) The furnace is factoryshipped for use with natural gas. The furnace can be converted in the field for use with propane gas when a factorysupplied conversion kit is used. Refer to the furnace rating plate for conversion kit information.
These furnaces are not approved for installation in recreational vehicles or outdoors. Single-stage furnaces (40k through 120k) are approved for installation in manufactured housing/mobile homes with manufacturer approved accessory. The conversion kit is required for use with both natural and propane gas. The furnace must also be installed on a factorysupplied accessory combustible floor base or evaporator coil casing.
MIN 60°F/16°C
32° F/0° C MINIMUM INSTALLED AMBIENT OR FREEZE PROTECTION REQUIRED
SEE SPECIFICATION SHEETS FOR ACCESSORY CONDENSATE TRAP HEATER AND CONDENSATE LINE PROTECTION
A150637
Codes and Standards
Follow all national and local codes and standards in addition to these instructions. The installation must comply
with regulations of the serving gas supplier, local building, heating, plumbing, and other codes. In absence of local codes, the installation must comply with the national codes listed below and all authorities having jurisdiction.
In the United States and Canada, follow all codes and standards for the following:
4 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Safety
US: Current edition of National Fuel Gas Code
(NFGC) NFPA 54/ANSI Z223.1 and the Installation Standards, Warm Air Heating and Air Conditioning Systems ANSI/NFPA 90B
A manufactured (Mobile) home installation must
conform with the Manufactured Home Construction and Safety Standard, Title 24 CFR, Part 3280, or when this standard is not applicable, the Standard for Manufactured Home Installation (Manufactured Home Sites, Communities, and Set-Ups),ANSI/NCS A225.1, and/or CAN/CSA-Z240, MH Series Mobile Homes
CANADA: Current edition of National Standard of
Canada, Natural Gas and Propane Installation Code (NSCNGPIC) CAN/CSA B149.1
General Installation
US: NFGC and the NFPA 90B. For copies, contact the
National Fire Protection Association Inc., Batterymarch Park, Quincy, MA 02269; or for only the NFGC contact the American Gas Association, 400 N. Capitol, N.W., Washington DC 20001.
CANADA: NSCNGPIC. For a copy, contact Standard
Sales, CSA International, 178 Rexdale Boulevard, Etobicoke (Toronto), Ontario, M9W 1R3, Canada.
Combustion and Ventilation Air
US: Current edition of Section 9.3 of the
NFPA54/ANSI Z223.1, Air for Combustion and Ventilation
CANADA: Current edition of Part 8 of the CAN/CSA
B149.1, Venting Systems and Air Supply for Appliances
Duct Systems
US and CANADA: Current edition of Air Conditioning
Contractors Association (ACCA) Manual D, Sheet Metal and Air Conditioning Contractors National Association (SMACNA), or American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) 2005 Fundamentals Handbook Chapter 35.
Acoustical Lining and Fibrous Glass Duct
US and CANADA: Current edition of SMACNA, NFPA
90B as tested by UL Standard 181 for Class I Rigid Air Ducts
Gas Piping and Gas Pipe Pressure Testing
U.S.A.: Current edition of NFPA 54/ANSI Z223.1,
NFGC; Chapters 5, 6, 7, and 8 and national plumbing codes.
CANADA: Current edition of CAN/CSAB149.1, Parts
4, 5, 6 and 9.
In the state of Massachusetts:
This product must be installed by a licensed plumber or
gas fitter.
When flexible connectors are used, the maximum
length shall not exceed 36in. (914 mm).
When lever type gas shutoffs are used they shall be
T−handle type.
The use of copper tubing for gas piping is not
approved by the state of Massachusetts.
Electrical Connections
U.S.A.: National Electrical Code (NEC) NFPA 70
CANADA: Canadian Electrical Code CSA C22.1
Condensate Drain Connection
US: Current edition of National Standard Plumbing Code, Section 8.7.
Canada: Current edition of National Plumbing Code of Canada.
Electrostatic Discharge (ESD) Precautions Procedure
!
FURNACE RELIABILITY HAZARD
Failure to follow this caution may result in unit component damage.
Electrostatic discharge can affect electronic components. Take precautions during furnace installation and servicing to protect the furnace electronic control. Precautions will prevent electrostatic discharges from personnel and hand tools which are held during the procedure. These precautions will help to avoid exposing the control to electrostatic discharge by putting the furnace, the control, and the person at the same electrostatic potential.
1. Disconnect all power to the furnace. Multiple disconnects may be required. DO NOT TOUCH THE CONTROL OR ANY WIRE CONNECTED TO THE CONTROL PRIOR TO DISCHARGING YOUR BODY’S ELECTROSTATIC CHARGE TO GROUND.
2. Firmly touch the clean, unpainted, metal surface of the furnace chassis which is close to the control. Tools held in a person’s hand during grounding will be satisfactorily discharged.
3. After touching the chassis, you may proceed to service the control or connecting wires as long as you do nothing to recharge your body with static electricity (for example; DO NOT move or shuffle your feet, do not touch ungrounded objects, etc.).
4. If you touch ungrounded objects (and recharge your body with static electricity), firmly touch a clean, unpainted metal surface of the furnace again before touching control or wires.
5. Use this procedure for installed and uninstalled (ungrounded) furnaces.
6. Before removing a new control from its container, discharge your body’s electrostatic charge to ground to protect the control from damage. If the control is to be installed in a furnace, follow items 1 through 4 before bringing the control or yourself in contact with the furnace. Put all used and new controls into containers before touching ungrounded objects.
7. An ESD service kit (available from commercial sources) may also be used to prevent ESD damage.
Accessories
See Specification Sheets for a list of accessories for this product.
CAUTION
440 01 4105 00 5
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 2 Dimensions
SD50604 Rev F
N9MSE
FURNACE SIZE
A B C D
CABINET
WIDTH
OUTLET WIDTH
BOTTOM
INLET WIDTH
AIR INTAKE
0261408 143/16 (361) 121/2 (319) 129/16 (322) 71/8 (181) 118 (54)
0401410 143/16 (361) 121/2 (319) 129/16 (322) 71/8 (181) 123 (55)
0401712 171/2 (445) 157/8 (403) 16 (406) 83/4 (222) 134 (61)
0601410 143/16 (361) 121/2 (319) 129/16 (322) 71/8 (181) 127 (57)
0601714 171/2 (445) 157/8 (403) 16 (406) 83/4 (222) 144 (65)
0801716 171/2 (445) 157/8 (403) 16 (406) 83/4 (222) 154 (69)
0802120 21 (533) 193/8 (492) 191/2 (495) 101/2 (267) 162 (73)
1002114 21 (533) 193/8 (492) 191/2 (495) 101/2 (267) 169 (76)
1002120 21 (533) 193/8 (492) 191/2 (495) 101/2 (267) 169 (76)
1202420 241/2 (622) 227/8 (581) 23 (584) 121/4 (311) 186 (84)
1402420 241/2 (622) 227/8 (581) 23 (584) 121/4 (311) 190 (86)
SHIP WT.
LB (KG)
6 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Location
!
PERSONAL INJURY AND/OR PROPERTY DAMAGE HAZARD
Improper use or installation of this furnace may result in premature furnace component failure. This gas furnace may be used for heating buildings under construction provided that:
The furnace is permanently installed with all electrical wiring, piping, venting and ducting installed according to these installation instructions. A return air duct is provided, sealed to the furnace casing, and terminated outside the space containing the furnace. This prevents a negative pressure condition as created by the circulating air blower, causing a flame rollout and/or drawing combustion products into the structure.
The furnace is controlled by a thermostat. It may not be “hot wired” to provide heat continuously to the structure without thermostatic control.
Clean outside air is provided for combustion. This is to minimize the corrosive effects of adhesives, sealers and other construction materials. It also prevents the entrainment of drywall dust into combustion air, which can cause fouling and plugging of furnace components.
The temperature of the return air to the furnace is maintained between 55°F (13°C) and 80°F (27°C), with no evening setback or shutdown. The use of the furnace while the structure is under construction is deemed to be
CAUTION
Table 2
QUANTITY
1
1 Air Intake Pipe Flange 1 Vent Pipe Flange 2 Pipe Flange Gaskets
10 Sharp Tip Screws (Vent and Inlet Flanges)
1 Vent Pipe Coupling 2 Vent Pipe Coupling Clamps 1 Pressure Switch Tube 1 Rubber Drain Elbow 4 Drain Elbow Clamps 1 1/2”CPVC to 3/4” PVC Pipe Adapter 1 Gas Line Grommet 1 Gas Line Knockout Plug 1 Junction Box Cover 1 Junction Box Base 1 Green Ground Screw 3 Blunt Tip Screws (Junction Box) 1 Thermostat Wire Grommet
Provided separately in furnace
1 Drain Extension Tube − “Z” Pipe
NOTE: Only used on 40K BTUH furnaces from 0 to 2000 ft. (0 to 610m) above sea level for total equivalent vent lengths under 10 ft.
Loose Parts Bag Contents (shipped in blower compartment)
DESCRIPTION See NOTE (Provided in Loose Parts Bag)
Outlet Choke Plate (used with 40k BTUH fur­naces, only)
intermittent operation per our installation instructions.
The air temperature rise is within the rated rise range on the furnace rating plate, and the gas input rate has been set to the nameplate value.
The filters used to clean the circulating air during the construction process must be either changed or thoroughly cleaned prior to occupancy.
The furnace, ductwork and filters are cleaned as necessary to remove drywall dust and construction debris from all HVAC system components after construction is completed.
Verify proper furnace operating conditions including ignition, gas input rate, air temperature rise, and venting according to these installation instructions.
!
CARBON MONOXIDE POISONING / COMPONENT DAMAGE HAZARD
Failure to follow this warning could result in personal in­jury or death and unit component damage.
Corrosive or contaminated air may cause failure of parts containing flue gas, which could leak into the living space. Air for combustion must not be contaminated by halogen compounds, which include fluoride, chloride, bromide, and iodide. These elements can corrode heat exchangers and shorten furnace life. Air contaminants are found in aerosol sprays, detergents, bleaches, clean­ing solvents, salts, air fresheners, and other household
WARNING
products. Do not install furnace in a corrosive or contam-
General
These furnaces are shipped with materials to assist in proper furnace installation. These materials are shipped in the main blower compartment.
See Table 2 for loose parts bag contents. This furnace must:
be installed so the electrical components are protected from water.
not be installed directly on any combustible material other than wood flooring (refer to SAFETY CONSIDERATIONS).
be located close to the chimney or vent and attached to an air distribution system. Refer to Air Ducts section.
be provided ample space for servicing and cleaning. Always comply with minimum fire protection clearances shown in Table 1 or on the furnace clearance to combustible construction label.
440 01 4105 00 7
Specifications subject to change without notice.
inated atmosphere. Make sure all combustion and circu­lating air requirements are met, in addition to all local codes and ordinances.
The following types of furnace installations may require OUTDOOR AIR for combustion due to chemical exposures:
Commercial buildings
Buildings with indoor pools
Laundry rooms
Hobby or craft rooms, and
Chemical storage areas
If air is exposed to the following substances, it should not be used for combustion air, and outdoor air may be required for combustion:
Permanent wave solutions
Chlorinated waxes and cleaners
Chlorine based swimming pool chemicals
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Water softening chemicals
Deicing salts or chemicals
Carbon tetrachloride
Halogen type refrigerants
Cleaning solvents (such as perchloroethylene)
Printing inks, paint removers, varnishes, etc.
Hydrochloric acid
Cements and glues
Figure 3 Multipoise Orientations
THE BLOWER IS LOCATED
TO THE RIGHT OF THE
BURNER SECTION, AND
CONDITIONED AIR IS
DISCHARGED TO THE LEFT.
THE BLOWER IS
LOCATED ABOVE THE
BURNER SECTION, AND
CONDITIONED AIR IS
DISCHARGED DOWNWARD.
Antistatic fabric softeners for clothes dryers
Masonry acid washing materials
All fuelburning equipment must be supplied with air for fuel combustion. Sufficient air must be provided to avoid negative pressure in the equipment room or space. A positive seal must be made between the furnace cabinet and the returnair duct to prevent pulling air from the burner area.
THE BLOWER IS
LOCATED BELOW THE
BURNER SECTION, AND
CONDITIONED AIR IS
DISCHARGED UPWARD.
THE BLOWER IS
LOCATED TO THE LEFT
OF THE BURNER SECTION,
AND CONDITIONED AIR IS
DISCHARGED TO THE RIGHT.
L12F010
!
WARNING
FIRE, INJURY OR DEATH HAZARD
Failure to follow this warning could result in personal injury, death and/or property damage.
When the furnace is installed in a residential garage, the burners and ignition sources must be located at least 18in. (457 mm) above the floor. The furnace must be located or protected to avoid damage by vehicles. When the furnace is installed in a public garage, airplane hangar, or other building having a hazardous atmosphere, the furnace must be installed in accordance with the current edition of NFPA 54/ANSI Z223.1 or CAN/CSA B149.1. (See Figure 4)
Figure 4 Installation in a Garage
!
WARNING
FIRE HAZARD
Failure to follow this warning could result in personal injury, death and/or property damage.
Do not install the furnace on its back or hang furnace with control compartment facing downward. Safety control operation will be adversely affected. Never connect re­turnair ducts to the back of the furnace. (See Figure 5)
Figure 5 Prohibit Installations
BACK POSITIONED DOWNWARD
BACK POSITIONED UPWARD
AIR RETURN CUT IN BACK
A93044
8 440 01 4105 00
Specifications subject to change without notice.
L12F011
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Location Relative to Cooling Equipment
The cooling coil must be installed parallel with, or on the downstream side of the unit to avoid condensation in the heat exchangers. When installed parallel with the furnace, dampers or other flow control must prevent chilled air from entering the furnace. If the dampers are manually operated, they must be equipped with means to prevent operation of either unit unless the damper is in the full−heat or full−cool position.
Air for Combustion and Ventilation
Introduction
Direct Vent (2−pipe) Applications
When the furnace is installed as a direct vent (2-pipe) furnace, no special provisions for air for combustion are required. However, other gas appliances installed in the space with the furnace may require outside air for combustion. Follow the guidelines below to insure that other gas appliances have sufficient air for combustion.
NonDirect Vent (1−pipe) Applications
When the furnace is installed as a non-direct vent (1-pipe) furnace, it will be necessary to insure there is adequate air for combustion. Other gas appliances installed with the furnace may also require air for combustion and ventilation in addition to the amount of combustion air and ventilation air required for the furnace. Follow the guidelines below to insure that the furnace and other gas appliances have sufficient air for combustion.
Ventilated Combustion Air Applications
When the furnace is installed using the ventilated combustion air option, the attic or crawlspace must freely communicate with the outdoor to provide sufficient air for combustion. The combustion air pipe cannot be terminated in attics or crawlspaces that use ventilation fans designed to operate during the heating season. If ventilation fans are present in these areas, the combustion air pipe must terminate outdoors as a Direct Vent/ 2-Pipe system.
All air for combustion is piped directly to the furnace from a space that is well ventilated with outdoor air (such as an attic, crawlspace, or equipment closet) and the space is well isolated from the living space or garage. In addition, other gas appliances installed in the space with the furnace may require outside air for combustion. Follow the guidelines below to insure that the roof or crawlspace walls have sufficient free area to provide sufficient air for combustion and ventilation for the furnaces. The guidelines below can be used to insure that other gas appliances have sufficient air for combustion.
Provisions for adequate combustion, ventilation, and dilution air must be provided in accordance with:
U.S. Installations: Current edition of Section 9.3 of the NFPA 54/ANSI Z223.1, Air for Combustion and Ventilation and applicable provisions of the local building codes.
Canadian Installations: Current edition of Part 8 of CAN/CSAB149.1, Venting Systems and Air Supply for Appliances and all authorities having jurisdiction.
!
CAUTION
FURNACE CORROSION HAZARD
Failure to follow this caution may result in furnace damage.
Air for combustion must not be contaminated by halogen compounds, which include fluoride, chloride, bromide, and iodide. These elements can corrode heat exchangers and shorten furnace life. Air contaminants are found in aerosol sprays, detergents, bleaches, cleaning solvents, salts, air fresheners, and other household products.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
The operation of exhaust fans, kitchen ventilation fans, clothes dryers, attic exhaust fans or fireplaces could create a NEGATIVE PRESSURE CONDITION at the furnace. Makeup air MUST be provided for the ventilation devices, in addition to that required by the furnace. Refer to the Carbon Monoxide Poisoning Hazard warning in the venting section of these instructions to determine if an adequate amount of makeup air is available.
The requirements for combustion and ventilation air depend upon whether or not the furnace is located in a space having a volume of at least 50 cubic feet per 1,000 Btuh (4.8 cubic meters per kW) input rating for all gas appliances installed in the space.
Spaces having less than 50 cubic feet per 1,000 Btuh (4.8
cubic meters per kW) require the OUTDOOR COMBUSTION AIR METHOD.
Spaces having at least 50 cubic feet per 1,000 Btuh (4.8
cubic meters per kW) may use the INDOOR
COMBUSTION AIR, STANDARD or KNOWN AIR INFILTRATION METHOD.
Outdoor Combustion Air Method
1. Provide the space with sufficient air for proper combustion, ventilation, and dilution of flue gases using permanent horizontal or vertical duct(s) or opening(s) directly communicating with the outdoors or spaces that freely communicate with the outdoors.
2. Figure 6 illustrates how to provide TWO OUTDOOR OPENINGS, one inlet and one outlet combustion and ventilation air openings to the outdoors.
a. One opening MUST commence within 12-in.
(300 mm) of the ceiling and the second opening MUST commence within 12-in. (300 mm) of the floor.
b. Size openings and ducts per Figure 6 and Table 3. c. TWO HORIZONTAL DUCTS require 1 square inch
(25.4 square mm) of free area per 2,000 Btuh (1,100
2
mm
/kW) of combined input for all gas appliances in
the space per Figure 6 and Table 3.
d. TWO OPENINGS OR VERTICAL DUCTS require 1
square inch (25.4 square mm)of free area per 4,000 Btuh (550 mm appliances in the space per Figure 6 and Table 3.
2
/kW) for combined input of all gas
440 01 4105 00 9
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
3. ONE OUTDOOR OPENING requires: a. 1 sq. in. (25.4 square mm)of free area per 3,000 Btuh
(734 mm2/kW) for combined input of all gas appliances in the space per Table 3 and
b. Not less than the sum of the areas of all vent
connectors in the space.
The opening shall commence within 12-in. (300 mm) of the ceiling. Appliances in the space shall have clearances of at least 1-in. (25 mm) from the sides and back and 6-in. (150 mm) from the front. The opening shall directly communicate with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces (crawl or attic) that freely communicate with the outdoors.
Indoor Combustion Air
NFPA & AGA
Standard and Known-Air-Infiltration Rate Methods
Indoor combustion air is permitted for combustion, ventilation,
and dilution, if the Standard or Known-Air-Infiltration Rate Method is used.
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
Many homes require air to be supplied from outdoors for furnace combustion, ventilation, and dilution of flue gases.
The furnace combustion air supply must be provided in accordance with this instruction manual.
The Standard Method:
1. The space has no less volume than 50 cubic feet per
1,000 Btuh (4.8 cubic meters per kW) of the maximum input ratings for all gas appliances installed in the space and
2. The air infiltration rate is not known to be less than 0.40
air changes per hour (ACH).
The Known Air Infiltration Rate Method shall be used, if the infiltration rate is known to be:
1. Less than 0.40 ACH and
2. Equal to or greater than 0.10 ACH
Infiltration rates greater than 0.60 ACH shall not be used. The minimum required volume of the space varies with the number of ACH and shall be determined per Table 4 or Equations 1 and 2. Determine the minimum required volume for each appliance in the space and add the volumes together to get the total minimum required volume for the space.
Table 4 Minimum Space Volumes were determined by using the following equations from the Current edition of National Fuel Gas Code ANSI Z223.1/NFPA 54, 9.3.2.2:
1. For other than fan-assisted appliances, such as a
draft hood-equipped water heater
2. For fan-assisted appliances such as this furnace:
If:
WARNING
A04002
A04003
Iother=combined input of all other than fan-assisted appliances in Btuh/hr
Ifan=combined input of all fan-assisted appliances in Btuh/hr ACH = air changes per hour (ACH shall not exceed 0.60.) The following requirements apply to the Standard Method and
to the Known Air Infiltration Rate Method.
1. Adjoining rooms can be considered part of a space if: a. There are no closable doors between rooms. b. Combining spaces on same floor level. Each opening
shall have free area of at least 1-in. (2,000 mm appliances in the space, but not less than 100-in. (0.06 m2). One opening shall commence within 12−in. (300 mm) of the ceiling and the second opening shall commence within 12-in. (300 mm) of the floor. The minimum dimension of air openings shall be at least 3-in. (80 mm). (See Figure 7)
c. Combining space on different floor levels. The
volumes of spaces on different floor levels shall be considered as communicating spaces if connected by one or more permanent openings in doors or floors having free area of at least 2−in. (4,400 mm gas appliances.
2. An attic or crawlspace may be considered a space that
freely communicates with the outdoors provided there are adequate permanent ventilation openings directly to outdoors having free area of at least 1-in. total input rating for all gas appliances in the space.
3. In spaces that use the Indoor Combustion Air Method,
infiltration should be adequate to provide air for combustion, permanent ventilation and dilution of flue gases. However, in buildings with unusually tight construction, additional air MUST be provided using the methods described in the Outdoor Combustion Air Method section.
4. Unusually tight construction is defined as Construction
with:
a. Walls and ceilings exposed to the outdoors have a
continuous, sealed vapor barrier. Openings are gasketed or sealed and
b. Doors and openable windows are weatherstripped
and
c. Other openings are caulked or sealed. These include
joints around window and door frames, between sole plates and floors, between wall-ceiling joints, between wall panels, at penetrations for plumbing, electrical and gas lines, etc.
2
/kW) of the total input rating of all gas
2
/kW) of total input rating of all
2
/1,000 Btuh
2
/1,000 Btuh
2
/4,000 Btuh of
2
Combination of Indoor and Outdoor Air
1. Indoor openings shall comply with the Indoor
Combustion Air Method below and,
2. Outdoor openings shall be located as required in the
Outdoor Combustion Air Method mentioned previously and,
3. Outdoor openings shall be sized as follows: a. Calculate the Ratio of all Indoor Space volume
divided by required volume for Indoor Combustion Air Method.
b. Outdoor opening size reduction Factor is one minus
the Ratio in a. above.
c. Minimum size of Outdoor openings shall be the size
required in Outdoor Combustion Air Method above multiplied by reduction Factor in b. above. The minimum dimension of air openings shall be not less than 3-in. (80 mm).
10 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Table 3 Minimum Free Area Required for Each Combustion Air Opening or Duct to Outdoors
TWO OPENINGS OR
VERTICAL DUCTS
(1 SQ. IN./4,000 BTUH)
(550 SQ. MM/KW)
Free Area of Open-
ing and Duct
Sq. In (mm)
Round Duct
In. (mm)
FURNACE
INPUT
(BTUH)
TWO HORIZONTAL DUCTS
(1 SQ. IN./2,000 BTUH)
(1,100 SQ. MM/KW)
Free Area of
Opening and Duct
Sq. In (Sq. mm)
Round
In. (mm)
Duct
Dia
SINGLE DUCT OR OPENING
(1 SQ. IN./3,000 BTUH)
(734 SQ. MM/KW)
Free Area of Open-
ing and Duct
Sq. In (Sq. mm)
Round
Duct
In. (mm)
Dia
26,000 13 (8388) 4 (102) 9 (5806) 4 (102) 7 (4516) 3 (76)
40,000 20 (12904) 5 (127) 14 (8696) 5 (127) 10 (6452) 4 (102) 60,000 30 (19355) 6 (152) 20 (13043) 5 (127) 15 (9678) 5 (127)
80,000 40 (25807) 7 (178) 27 (17391) 6 (152) 20 (12904) 5 (127) 100,000 50 (32258) 8 (203) 34 (21739) 7 (178) 25 (16130) 6 (152) 120,000 60 (38709) 9 (229) 40 (26087) 7 (178) 30 (19355) 6 (152) 140,000 70 (45161) 10 (254) 47 (30435) 8 (203) 35 (22581) 7 (178)
EXAMPLE: Determining Free Area
FURNACE WATER HEATER TOTAL INPUT
100,000 + 30,000 = (130,000 divided by 4,000) = 32.5 Sq. In. for each two Vertical Ducts or Openings
60,000 + 40,000 = (100,000 divided by 3,000) = 33.3 Sq. In. for each Single Duct or Opening 80,000 + 30,000 = (110,000 divided by 2,000) = 55.0 Sq. In. for each two Horizontal Ducts
Table 4 Minimum Space Volumes for 100% Combustion, Ventilation and Dilution Air from Outdoors
OTHER THAN FAN-ASSISTED TOTAL
(1,000’S BTUH GAS INPUT RATE)
ACH
0.60
0.50
0.40
0.30
0.20
0.10
30 40 50 26 40 60 80 100 120 140
Space Volume Ft
1,050 (29.7)
1,260 (35.6)
1,575 (44.5)
2,100 (59.4)
3,150 (89.1)
6,300
(178.0)
1,400 (39.6)
1,680 (47.5)
2,100 (59.4)
2,800 (79.2)
4,200
(118.9)
8,400
(237.8)
1,750
(49.5)
2,100 (59.4)
2,625 (74.3)
3,500 (99.1)
5,250
(148.6) 10,500
(297.3)
910
(25.8)
1092
(30.9)
1365
(38.7)
1820
(51.5)
2730
(77.3)
5460
(154.6)
1,400 (39.6)
1,680 (47.5)
2,100 (59.4)
2,800 (79.2)
4,200
(118.9)
8,400
(237.8)
0.00 NP NP NP NP NP NP NP NP NP NP
NP = Not Permitted
Figure 6
Air for Combustion, Ventilation, and Dilution for Outdoors
Figure 7
FAN-ASSISTED TOTAL
(1,000’S BTUH GAS INPUT RATE)
3
3
(M
)
1,500
(42.5)
1,800
(51.0)
2,250
(63.7)
3,000
(84.9)
4,500
(127.3)
9,000
(254.6)
2,000 (56.6)
2,400 (67.9)
3,000 (84.9)
4,000
(113.2)
6,000
(169.8) 12,000
(339.5)
2,500 (70.8)
3,000 (84.9)
3,750
(106.1)
5,000
(141.5)
7,500
(212.2) 15,000
(424.4)
Air for Combustion, Ventilation, and Dilution from Indoors
3,000
(84.9)
3,600
(101.9)
4,500
(127.3)
6,000
(169.8)
9,000
(254.6) 18,000
(509.2)
Dia.
3,500 (99.1)
4,200
(118.9)
5,250
(148.6)
7,000
(198.1) 10,500
(297.1) 21,000
(594.1)
*Minimum dimensions of 3‐in. (76mm)
NOTE: Use any of the following combinations of openings:
A & B, C & D, D & E, F & G
440 01 4105 00 11
L12F012
Specifications subject to change without notice.
* Minimum opening size is 100 sq in. (64516 sq. mm) with
minimum dimensions of 3‐in. (76mm)
Minimum of 3‐in. (76mm) when type‐B1 vent is used.
L12F013
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
CONDENSATE TRAP
Condensate Trap Upflow Orientation
When the furnace is installed in the upflow position, it is not necessary to relocate the condensate trap or associated tubing. Refer to Figure 8 for upflow condensate trap information. Refer to Condensate Drain section for information how to install the condensate drain.
Condensate Trap Downflow Orientation
When the furnace is installed in the downflow position, the condensate trap will be initially located at the upper left corner
Figure 8 Upflow Trap Configuration
Condensate Trap
Relief Port
Collector Box
Plugs
of the collector box, as received from the factory. See the top image in Figure 9. When the furnace is installed in the downflow orientation, the condensate trap must be relocated for proper condensate drainage. See the bottom image in
Figure 9.
To Relocate the Condensate Trap:
Orient the furnace in the downflow position.Figure 9 shows the condensate trap and tubing before and
after relocation. Refer to Figure 9 to begin the trap conversion.
Refer to Condensate Drain section for information how to install
the condensate drain.
Vent Pipe Clamp
Vent Elbow Clamp
Vent Elbow
Collector Box
Plug
Condensate Trap
Relief Port
Pressure Switch
Port
UPFLOW TRAP CONFIGURATION
1 & 2 Stage Units
Representative drawing only, some models may vary in appearance.
Condensate Trap
Figure 9 Unconverted Factory Configuration as viewed in the Downflow Orientation
Remove pressure switch tube from front pressure switch and discard. A new tube is shipped in the loose parts
Remove relief tube from relief port on condensate trap.
Remove the screw that secures the trap to the collector box and remove trap.
bag.
Remove tube from relief port.
Outlet
A11307
Loosen clamp on inlet to vent elbow.
Representative drawing only, some models may vary in appearance.
12 440 01 4105 00
Specifications subject to change without notice.
Remove middle and bottom plugs. DO NOT DISCARD.
A11587LA
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Downflow Trap Configuration
Connect the new pressure switch tube from Loose Parts bag to port on front pressure switch.
Install the two plugs previously removed on the open ports of the collector box.
Route tube through inducer standoffs to adjust position of the tube.
Trim excess tube. Connect pressure switch tube to port on collector box.
Connect relief tube to port on collector box.
Rotate elbow to desired position and tighten clamp to 15 lb.in.
Slide tube in standoffs
4
to adjust length.
Representative drawing only, some models may vary in appearance.
Condensate Trap Horizontal Orientation
When the furnace is installed in the horizontal right position, the condensate trap will be initially located at the bottom of the collector box, as received from the factory. See the top image in Figure 10. When the furnace is installed in the horizontal left position, the condensate trap will be initially located at the top of the collector box, as received from the factory. See the top image in Figure 11. In both cases the trap must be repositioned on the collector box for proper condensate drainage. See bottom images in Figure 10 and Figure 11.
A field−supplied, accessory Horizontal Installation Kit (trap grommet) is required for all direct−vent horizontal installations (only). The kit contains a rubber casing grommet designed to seal between the furnace casing and the condensate trap. (See
Figure 16)
NOTICE
The field-supplied, accessory horizontal drain trap grommet is ONLY REQUIRED FOR DIRECT VENT APPLICATIONS. It is NOT required for applications using single-pipe or ventilated combustion air venting.
Attach condensate trap with screw to collector box.
Connect relief tube to
5
relief port on condensate trap.
Align condensate trap over middle and bottom ports of collector box.
A11587LB
NOTICE
The condensate trap extends below the side of the casing in the horizontal position. A minimum of 2-in. (51 mm) of clearance is required between the casing side and the furnace platform for the trap to extend out of the casing in the horizontal position. Allow at least 1/4-in. per foot (20mm per meter) of slope down and away from the furnace in horizontal sections of drain line.
To Relocate the Condensate Trap:
Remove the knockout in the casing for the condensate trap.Install the grommet in the casing when required for directvent
horizontal applications.
Orient the furnace in the desired position.Allow for 2 in. (51 mm) of clearance underneath the furnace for
the condensate trap and drain line.
Figure 10 shows the condensate trap and tubing before and
after relocation in the horizontal right position.
Figure 11 shows the condensate trap and tubing before and
after relocation in the horizontal left position.
Refer to the appropriate figure to begin the trap conversion.Refer to Condensate Drain section for information how to install
the condensate drain.
440 01 4105 00 13
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 10 Unconverted Factory Configuration as viewed in the Horizontal Right Orientation
Remove plug from collector box. DO NOT DISCARD.
Horizontal Right Trap Configuration (CONTINUED)
NOTE: Remove knockout in casing before reinstalling the condensate trap.
Attach condensate trap with screw to collector box.
If alternate vent position is required, loosen clamp on inlet of vent elbow.
Remove the screw that secures the trap to the collector box and remove trap.
Representative drawing only, some models may vary in appearance.
Slide relief tube in standoffs to adjust length.
A11573LA
Vent elbow shown in alternate orientation. Tighten clamp on inlet to vent elbow 15 lb.in.
Install plug on open port of collector box
Representative drawing only, some models may vary in appearance.
14 440 01 4105 00
Specifications subject to change without notice.
Align trap over middle and righthand port on collector box.
A11573LB
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 11 Unconverted Factory Configuration as viewed in the Horizontal Left Orientation
Remove the screw that secures the condensate trap to the collector box
If alternate vent position
5
is required, loosen clamp on vent elbow inlet.
Remove relief tube from port on collector box.
Representative drawing only, some models may vary in appearance.
and remove trap.
Remove relief tube from relief port on condensate trap.
Remove middle and right
6
plug from collector box. DO NOT DISCARD.
Remove front pressure switch tube and discard. A new tube is shipped in the Loose Parts bag.
A11574LA
Horizontal Left Trap Configuration (CONTINUED)
NOTE: Remove knockout in casing before reinstalling the condensate trap.
Rotate elbow to
9
desired position and torque clamp on inlet 15 lb.in.
Install two plugs previously removed in open ports on collector box.
Connect relief tube to port on collector box.
Slide relief tube in standoffs to adjust length.
Attach condensate trap with screw to collector box.
Align trap over middle and righthand port on collector box.
Representative drawing only, some models may vary in appearance.
Connect the new pressure switch
7
tube from Loose Parts bag to port on front pressure switch.
Route pressure switch tube underneath relief tube and
8
connect to port on collector box.
Connect relief tube to relief port on condensate trap.
A11574LB
440 01 4105 00 15
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Condensate Drain Connection
!
FROZEN AND BURST WATER PIPE HAZARD
Failure to protect against the risk of freezing may result in property damage.
Special precautions MUST be made if installing furnace in an area which may drop below freezing. This can cause improper operation or damage to equipment. If furnace environment has the potential of freezing, the drain trap and drain line must be protected. The use of accessory drain trap heaters, electric heat tape and/or RV antifreeze is required for these installations.
!
PROPERY DAMAGE HAZARD
Failure to follow this caution may result in burst water pipes and/or property damage.
If a condensate pump is installed, a plugged condensate drain or a failed pump may cause the furnace to shut down. Do not leave the home unattended during freezing weather without turning off water supply and draining water pipes or otherwise protecting against the risk of frozen pipes.
DO NOT trap the drain line in any other location than at the condensate drain trap supplied with the furnace. If possible, DO NOT route the drain line where it may freeze. The drain line must terminate at an inside drain to prevent freezing of the condensate and possible property damage.
Special precautions MUST be made if installing furnace in an area which may drop below 32°F (0°C). This can cause improper operation or damage to the equipment. If the furnace environment has the potential of freezing, the drain trap and drain line must be protected. In areas where the temperature may be below 32°F (0°C), a Condensate Freeze Protection kit is required. The kit includes a condensate trap with heat pad and replaces the factoryinstalled condensate trap. Refer to the accessory section of the Specification Sheets for current kit number. A selfregulating, shielded and waterproof heat tape rated at 3 to 6 watt per foot (10 to 20 watt per meter) at 115 volt, 40° F (4° C) may be used to provide freeze protection of the remaining condensate drain line. Wrap the drain trap and the drain line with the heat tape and secure with appropriate plastic ties. Follow the heat tape manufacturer’s recommendations. Prime the trap before furnace operation.
The condensate drain line must be supported and/or secured per local codes. Supports and clamps should be spaced to prevent the drain line from sagging or being dislocated from the furnace or termination point. In the absence of local codes, consult the current edition of the National Standard Plumbing Code, in the US or current edition of the National Plumbing Code of Canada in Canada.
Upflow/Downflow Orientation
In the Upflow or Downflow orientation, the condensate trap is inside the furnace casing. The condensate drain must be routed from the trap through the furnace casing. The condensate drain can be routed through the left or right side of the casing. (The left or right side is as you are viewing/facing the furnace from the front.)
An indoor coil condensate drain or humidifier drain can be connected to the external furnace condensate drain provided:
a. The drains are not hard piped together, and
CAUTION
CAUTION
b. There is an air gap at the point where the two drain
lines meet or
c. All condensate piping is at least 1/2 in. PVC and
there is a relief tee at the top of condensate drain piping as shown below:
NOTE: On narrower casings, it may be easier to remove the condensate trap, connect the drain line components and re-install the condensate trap. Read the steps thoroughly to familiarize yourself with the required steps.
For Right Side Condensate Drain:
1. Remove the 7/8in. knockout from the right side of the
casing. (See Figure 12 for suggested knockout removal technique.)
2. Remove the preformed rubber drain elbow and two spring clamps from the loose parts bag.
3. Slide a spring clamp 1 in. (25 mm) down the plain end (the end without the formed grommet) of the drain elbow.
4. From inside the casing, insert the formed grommet end of the elbow through the 7/8in. knockout in the casing.
5. Pull the grommet through the casing from the outside until it is seated in the knockout
6. Attach the plain end of the drain elbow to the outlet stub on the drain trap. Secure the drain elbow to the trap with the spring clamp.
The remaining drain line can be constructed from field supplied 1/2in. CPVC or 3/4−in. PVC pipe in compliance with local building codes. A factory−supplied 1/2−in. CPVC to 3/4−in PVC adapter is supplied in the loose parts bag for use as required.
7. Install the adapter or connect the 1/2in. CPVC pipe by sliding a spring clamp over the open end of the grommet on the outside of the furnace casing.
8. Open the spring clamp and insert the long end of the adapter of the 1/2−in. CPVC pipe into the outlet stub on the drain elbow.
9. Connect additional condensate piping to a codeapproved drain, or to a condensate pump approved for use with acidic furnace condensate and compatible with mineral and vegetable oils, such as canola oil.
Allow at least 1/4−in. per foot (20 mm per meter) of slope down and away from the furnace in horizontal sections of drain line.
Figure 12 Knockout Removal
L12F019
!
CUT HAZARD
Failure to follow this caution may result in personal injury. Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing, safety glasses and gloves when handling parts, and servicing furnaces.
CAUTION
16 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
TIPS FROM CONTRACTORS: Contractors have found that
temporarily removing the inducer assembly in upflow applications while performing the steps below, makes upflow leftside drain connections easier.
For Left Side Condensate Drain Connection:
1. For left side condensate drainage, the drain line is routed from the condensate trap, behind the inducer (upflow) or gas valve (downflow) and out through the left side of the furnace casing. A pre-formed 1/2−in. CPVC “Z” pipe is provided with the furnace. The “Z“ pipe is long enough to extend across the casing for drain connections.
2. Locate the “Z” pipe. Remove the pre-formed drain elbow and four spring clamps from the loose parts bag.
3. The “Z” pipe is connected to the condensate trap and the outside of the furnace by modifying the formed rubber
drain elbow as shown in Figure 15.
4. Remove the formed grommet from the rubber drain elbow by cutting the elbow along the vertical line located about 1 3/8in. (35 mm) away from the formed grommet. See Figure 12. DO NOT DISCARD THE FORMED GROMMET OR THE RUBBER ELBOW. Both of these pieces will be used.
Assemble and route the drain line to the opposite side of the furnace as detailed below:
5. Remove the knockout from the left side of the casing. (See Figure 12 for suggested knockout removal technique.)
!
CUT HAZARD
Failure to follow this caution may result in personal injury. Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing, safety glasses and gloves when handling parts, and servicing furnaces.
6. From the outside of the casing, insert the angled end of the ”Z” pipe through drain hole in the left side of the casing and behind the inducer or gas valve. Allow the ”Z” pipe to temporarily rest on the blower shelf (upflow) or burner box (downflow). (NOTE: When the inducer housing has been removed to ease installation in upflow applications, this step is not needed.)
7. After inserting the “Z” pipe through the casing, slide a spring clamp over each end of the “Z” pipe.
8. From inside the casing, insert the short end of the formed grommet cut from the rubber drain elbow through the 7/8in. drain knockout in the casing.
9. Pull the grommet through the casing from the outside until it is seated in the knockout.
10. Align the ”Z” pipe with the long end of the grommet inside the furnace and insert slightly. The angled end of the tube at the other side of the casing should be facing the front of the furnace.
11. Slide a spring clamp over the end of the remaining rubber drain elbow.
12. Attach the drain elbow to the angled end of ”Z” pipe and the drain trap outlet stub. Adjust the length of ”Z” pipe inserted into the grommet at the opposite side of the furnace as necessary for proper fit and positioning. In both upflow and downflow orientations, the ”Z” pipe should NOT be resting on any sheet metal parts.
13. Secure the rubber elbow to the drain trap and the ”Z” pipe with spring clamps.
14. Secure the grommet to the ”Z” pipe with the spring clamp The remaining drain line can be constructed from field supplied 1/2in. CPVC or 3/4in. PVC pipe, in compliance with local building codes. A factory−supplied
440 01 4105 00 17
CAUTION
Specifications subject to change without notice.
1/2in. CPVC to 3/4−in. PVC adapter is supplied in the loose parts bag for use as required.
15. Install the adapter or connect the 1/2in. CPVC pipe by sliding a spring clamp over the open end of the grommet on the outside the furnace casing.
16. Open the spring clamp and insert the long end of the adapter or the 1/2−in. CPVC pipe into the outlet stub on the drain elbow.
17. Connect additional condensate piping to a codeapproved drain, or to a condensate pump approved for use with acidic furnace condensate and compatible with mineral and vegetable oils, such as canola oil.
Allow at least 1/4-in. per foot (20 mm per meter) of slope down and away from the furnace in horizontal sections of drain line.
NOTICE
The field-supplied, accessory horizontal drain trap grommet is ONLY REQUIRED FOR DIRECT VENT APPLICATIONS. It is NOT required for applications using single-pipe or ventilated combustion air venting.
TIPS FROM CONTRACTORS: When installing the furnace horizontally, use the entire drain elbow (that is, do NOT cut as shown in Figure 15) to connect the trap to the drain line. This helps to prevent bumps and shocks to the drain line from damaging the furnace drain trap. Avoid misalignment of the drain pipe which may cause kinks in the elbow.
Horizontal Orientation
1. The condensate trap outlet extends 2in. (51 mm) below the furnace casing. Leave enough clearance between the furnace and the furnace platform for the trap.
2. To allow for servicing the trap, the condensate drain elbow in the loose parts bag can be used to make a coupler to allow for future service of the condensate trap and drain line.
3. Remove the knockout for the condensate trap in the side of the casing.
4. Install the drain trap grommet in the casing, if required for directvent applications. If necessary, remove the trap, install the grommet and re−install the trap.
5. Remove the preformed rubber drain elbow and two spring clamps from the loose parts bag.
6. Connect the full or modified elbow and/or grommet to the outlet of the condensate trap with one spring clamp. Avoid misalignment of the drain pipe which may cause kinks in the elbow or grommet.
7. The remaining drain line can be constructed from field supplied 1/2in. CPVC or 3/4in. PVC pipe, in compliance with local building codes. A factory−supplied 1/2in. CPVC to 3/4−in. PVC adapter is supplied in the loose parts bag for use as required.
8. Install the adapter or connect the 1/2in. CPVC pipe by sliding a spring clamp over the open end of the elbow or grommet on the outside the furnace casing.
9. Open the spring clamp and insert the long end of the adapter or the 1/2−in. CPVC pipe into the outlet stub on the drain elbow.
10. Connect additional condensate piping to a codeapproved drain, or to a condensate pump approved for use with acidic furnace condensate and compatible with mineral and vegetable oils, such as canola oil.
Allow at least 1/4-in. per foot (20 mm per meter) of slope down and away from the furnace in horizontal sections of drain line.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 13
AIRFLOW
OF
DIRECTION
Example of Field Drain Attachment (NOT ALLOWED)
Evaporator Coil
+
Condensing
Furnace
+
Blower
-
-
Evaporator Coil
+
+
+
< +
< +
-
-
-
+
+
-
+
+
Condensing
+
-
Furnace
+
Blower
-
AIRFLOW
OF
DIRECTION
-
+ = Positive pressure < + = Pressure lower than areas with +
ï = Negative pressure
Evaporator Coil
+
+
Condensing
+
-
Furnace
+
Blower
-
AIRFLOW
OF
DIRECTION
-
+ = Positive pressure < + = Pressure lower than areas with +
ï = Negative pressure
+ = Positive pressure < + = Pressure lower than areas with +
+
+
ï = Negative pressure
+
Blower creates positive pressure.
Positive pressure extends into coil
+
condensate drain (no trap).
< +
Furnace condensate does not flow consistently when drain is at positive
+
pressure.
+
+
+
+
+
+
+
3/4” PVC
3/4
+
+
+
+
3/4
+
+
3/4
1/2” CPVC or larger*
+
3/4” PVC
3/4
< +
+
< +
+
3/4
+
+
+
+
3/4
+
+
++
+
+
3/4
+
+
3/4
+
+
3/4
+
+
+
+
3/4
+
+
++
3/4
1/2” CPVC or larger*
3/4
< +
< +
-
-
-
+
< +
< +
-
-
-
3/4” PVC
3/4” PVC
A150261
A150262
A150263
Figure 14 Example of Field Drain Attachment
Open standpipe for coil or humidifier drain
Air gap here
TEE (1/2” CPVC to 3/4” PVC adapter from loose parts bag.)
To open drain
L14F024
Evaporator Coil
3/4” PVC
+
AIRFLOW
OF
+
DIRECTION
-
+ = Positive pressure < + = Pressure lower than areas with +
ï = Negative pressure
AIRFLOW
OF
DIRECTION
+
+
Condensing
Furnace
+
+
Blower
-
-
Evaporator Coil
+
+
Condensing
Furnace
+
+
+
+
3/4
+
+
+
3/4” PVC
3/4
+
Open standpipe Air gap required when
+
another drain is connected
+
to furnace drain.
3/4
TEE
< +
3/4
(1/2” CPVC to 3/4” PVC adapter from loose parts bag.)
< +
< +
-
-
3/4
-
L14F025
Open standpipe (Optional when coil drain is
+
3/4
+
+
3/4
3/4
not connected to furnace drain.)
3/4” PVC
1/2” CPVC or larger*
3/4” PVC
3/4
+
< +
< + < +
+
+
-
Blower
-
-
+ = Positive pressure < + = Pressure lower than areas with +
ï = Negative pressure
-
3/4
-
-
L14F026
18 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Example of Field Drain Attachment cont.
Evaporator Coil
3/4
3/4
3/4
< +
3/4
Open standpipe (Optional when coil drain is not connected to furnace drain.)
3/4” PVC
TEE (1/2” CPVC to 3/4” PVC adapter from loose parts bag.)
+
+
Condensing
AIRFLOW
OF
DIRECTION
Furnace
+
+
+
+
3/4” PVC
3/4
+
< +
< +
+
-
Blower
-
-
-
-
+ = Positive pressure < + = Pressure lower than areas with +
ï = Negative pressure
-
Figure 15 Modify Rubber Drain Elbow
Cut line for left side condensate drain. Do not discard parts after cutting.
3/4
L14F027
Figure 17 Drain Trap Connection and Routing
Attach elbow to condensate trap
Cut formed end off
Formed end of grommet
Connect short end of “Z” pipe to modified drain elbow
Factory supplied 1/2in. CPVC to 3/4in. PVC adapter
TRAP, DRAIN ELBOW WITH DISCHARGE PIPE
Formed end of grommet Open spring clamp. Insert 1/2in. to 3/4in. CPVC to PVC adapter or 1/2−in. CPVC pipe
condensate drain elbow
Modified drain elbow connect to condensate trap and “Z” pipe
s
13/8 in (35 mm)
L11F089
Figure 16 Horizontal Drain Trap Grommet
Remove knockout. Install grommet before relocating condensate trap.
A11348
LEFT SIDE DRAIN ROUTED BEHIND INDUCER
NOTE: Remove Inducer Housing for easier access, if desired.
L12F015
Figure 18 Formed Rubber Drain Grommet
INSTALL CLAMPS ON DRAIN ELBOW ATTACH DRAIN ELBOW TO CONDENSATE DRAIN TRAP
PULL DRAIN STUB THROUGH CASING
OPEN SPRING CLAMP
INSERT FACTORY−SUPPLIED 1/2−IN. CPVC TO 3/4IN. PVC ADAPTER OR 1/2IN. CPVC PIPE
*CLAMP MAY BE LOCATED ON OUTSIDE OF DRAIN ELBOW
L12F022
440 01 4105 00 19
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
INSTALLATION
NOTICE
This furnace is certified to leak 2% or less of nominal air con­ditioning CFM delivered when pressurized to 1-inch water column (250 Pa) with all present air inlets (including bottom closure in upflow and horizontal applications), air outlets, and plumbing and electrical ports sealed.
UPFLOW INSTALLATION
NOTE: The furnace must be pitched as shown in Figure 19 for
proper condensate drainage.
Figure 19 Furnace Pitch Requirements
LEVEL 0-IN. (0 MM) TO 1/2-IN. (13 MM) MAX
MIN 1/4-IN. (6 MM) TO 1/2-IN. (13 MM) MAX
UPFLOW OR DOWNFLOW
Supply Air Connections
For a furnace not equipped with a cooling coil, the outlet duct shall be provided with a removable access panel. This opening shall be accessible when the furnace is installed and shall be of such a size that the heat exchanger can be viewed for possible openings using light assistance or a probe can be inserted for sampling the air stream. The cover attachment shall prevent leaks.
Connect supplyair duct to flanges on furnace supply−air outlet. Bend flange upward to 90 with wide duct pliers. (See Figure 23) The supplyair duct must be connected to ONLY the furnace supply−outlet−air duct flanges or air conditioning coil casing (when used). DO NOT cut main furnace casing side to attach supply air duct, humidifier, or other accessories. All supply−side accessories MUST be connected to duct external to furnace main casing.
Return Air Connections
HORIZONTAL
A11237
when bottom return air is used. To remove bottom closure panel, perform the following:
1. Tilt or raise furnace and remove four (4) screws holding
bottom plate. (See Figure 20)
2. Remove bottom plate.
3. Remove bottom closure panel.
4. Reinstall bottom plate and screws.
Figure 20 Removing Bottom Closure Panel
BOTTOM PLATE
L11F004
Side Return Air Inlet
These furnaces are shipped with bottom closure panel installed in bottom return−air opening. This panel MUST be in place when only side return air is used.
NOTE: Side return−air openings can be used in UPFLOW and most HORIZONTAL configurations. Do not use side return−air openings in DOWNFLOW configuration. (See Figure 28,
Figure 29 and Figure 30)
Leveling Legs (If Desired)
In upflow position with side return inlet(s), leveling legs may be used. (See Figure 21) Install fieldsupplied, 5/16 x 11/2in. (8 x 38 mm) (max) corrosionresistant machine bolts, washers and nuts.
Figure 21 Leveling Legs
!
WARNING
FIRE HAZARD
A failure to follow this warning could cause personal injury, death and/or property damage.
Never connect returnair ducts to the back of the furnace. Follow instructions below.
The returnair duct must be connected to bottom, sides (left or right), or a combination of bottom and side(s) of main furnace casing. Bypass humidifier may be attached into unused return air side of the furnace casing. (See Figure 28, Figure 29 and
Figure 30)
Bottom Return Air Inlet
These furnaces are shipped with bottom closure panel installed in bottom return−air opening. Remove and discard this panel
20 440 01 4105 00
Specifications subject to change without notice.
A89014
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
NOTE: Bottom closure must be used when leveling legs are
used. It may be necessary to remove and reinstall bottom closure panel to install leveling legs. To remove bottom closure panel, see Step 1 in Bottom Return Air Inlet section.
To install leveling legs:
1. Position furnace on its back. Locate and drill a hole in each bottom corner of furnace.
2. For each leg, install nut on bolt and then install bolt with nut in hole. (Install flat washer if desired.)
3. Install another nut on other side of furnace base. (Install flat washer if desired.)
4. Adjust outside nut to provide desired height, and tighten inside nut to secure arrangement.
5. Reinstall bottom closure panel if removed.
DOWNFLOW INSTALLATION
NOTE: The furnace must be pitched as shown in Figure 19 for
proper condensate drainage.
Supply Air Connections
NOTE: For downflow applications, this furnace is approved for
use on combustible flooring when any one of the following two accessories are used (see specification sheets for list of approved accessories):
Special Base NAHA01101SB
Cased Coil Assembly EAM4X, END4X, ENW4X,
EAD4X
1. Determine application being installed from Table 5.
2. Construct hole in floor per Table 5 and Figure 22.
3. Construct plenum to dimensions specified in Table 5 and Figure 22.
4. Install as shown in Figure 24. If Coil Assembly Part is used, install as shown in Figure 25 .
Figure 22
Floor and Plenum Opening Dimensions
NOTE: It is recommended that the perforated supplyair duct
flanges be completely removed from furnace when installing the furnace on a factorysupplied cased coil or coil box. To remove the supplyair duct flange, use wide duct pliers or hand seamers to bend flange back and forth until it breaks off. Be careful of sharp edges. (See Figure 23)
!
CAUTION
CUT HAZARD
Failure to follow this caution may result in personal injury. Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing, safety glasses and gloves when handling parts, and servicing furnaces.
Connect supplyair duct to supplyair outlet on furnace. Bend flange inward past 90 with wide duct pliers (See Table 1 Figure 23) The supplyair duct must be connected to ONLY the furnace supply outlet or air conditioning coil casing (when used). When installed on combustible material, supplyair duct must be connected to ONLY the factoryapproved accessory subbase, or a factory−approved air conditioning coil casing. DO NOT cut main furnace casing to attach supply side air duct, humidifier, or other accessories. All supplyside accessories MUST be connected to duct external to furnace casing.
Return Air Connections
!
FIRE HAZARD
A failure to follow this warning could cause personal injury, death and/or property damage.
Never connect returnair ducts to the back of the furnace. Follow instructions below.
The returnair duct must be connected to returnair opening (bottom inlet) as shown in Figure 28. DO NOT cut into casing sides (left or right). Bypass humidifier connections should be made at ductwork or coil casing sides exterior to furnace. (See
Figure 28)
WARNING
A96283
440 01 4105 00 21
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 23 Duct Flanges
UPFLOW DOWNFLOW HORIZONTAL
PERFORATED DISCHARGE DUCT FLANGE
90°
90°
120°
MIN
Table 5 Opening Dimensions in. (mm)
FURNACE
CASING WIDTH
IN. (mm)
14–3/16
(360)
17–1/2
(445)
21
(533)
241/2
(622)
Upflow Applications on Combustible or Noncombustible Flooring
Downflow Applications on Noncombustible Flooring
Downflow applications on combustible flooring (subbase required)
Downflow Applications on Combustible Flooring with Coil Assembly or
Upflow Applications on Combustible or Noncombustible Flooring
Downflow Applications on Noncombustible Flooring
Downflow applications on combustible flooring (subbase required)
Downflow Applications on Combustible Flooring with Coil Assembly or coil
Upflow Applications on Combustible or Noncombustible Flooring
Downflow Applications on Noncombustible Flooring
Downflow applications on combustible flooring
Downflow Applications on Combustible Flooring with Coil Assembly or coil
Upflow Applications on Combustible or Noncombustible Flooring
Downflow Applications on Noncombustible Flooring
Downflow applications on Combustible flooring
Downflow Applications on Combustible Flooring with Coil Assembly or
APPLICATION
(subbase not required)
(subbase not required)
coil box (subbase not required)
(subbase not required)
(subbase not required)
box (subbase not required)
(subbase not required)
(subbase not required)
(subbase required)
box (subbase not required)
(subbase not required)
(subbase not required)
(subbase required)
coil box (subbase not required)
YES
YES
NO
120°
MIN
YES
YES
NO
120°
MIN
YES
YES
NO
A10493
PLENUM OPENING FLOOR OPENING
A B C D
12−11/16
(322)
129/16
(319)
1113/16
(284)
125/16
(319)
16
(406)
157/8
(403)
151/8
(384)
151/2
(394)
191/2
(495)
193/8
(492)
185/8
(473)
19
(483)
23
(584)
227/8
(581)
221/8
(562)
221/2
(572)
215/8
(549)
19
(483)
19
(483)
19
(483)
215/8
(549)
19
(483)
19
(483)
19
(483)
215/8
(549)
19
(483)
19
(483)
19
(483)
211/8
(537)
19
(483)
19
(483)
19
(483)
135/16
(338)
133/16
(335)
137/16
(341)
135/16
(338)
165/8
(422)
161/2
(419)
163/4
(425)
161/2
(419)
201/8
(511)
20
(508)
201/4
(514)
20
(508)
235/8
(600)
231/2
(597)
233/4
(603)
231/2
(597)
221/4
(565)
195/8
(498)
205/8
(600)
20
(508)
221/4
(565)
195/8
(498)
205/8
(600)
20
(508)
221/4
(565)
195/8
(498)
205/8
(600)
20
(508)
221/4
(565)
195/8
(498)
205/8
(600)
20
(508)
22 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 24
Figure 25
Furnace, Plenum, and Subbase Installed on a Combustible Floor
A96285
Furnace, Plenum, and Coil Assembly on a Combustible Floor
EAM4X, END4X, ENW4X
L11F104
Bottom Return Air Inlet
These furnaces are shipped with bottom closure panel installed in bottom return−air opening. Remove and discard this panel when bottom return air is used. To remove bottom closure panel, perform the following:
1. Tilt or raise furnace and remove four (4) screws holding bottom plate. (See Figure 20)
2. Remove bottom plate.
3. Remove bottom closure panel.
4. Reinstall bottom plate and screws.
HORIZONTAL INSTALLATION
NOTE: The furnace must be pitched forward as shown in Figure 19 for proper condensate drainage.
!
FIRE, EXPLOSION, AND CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury, death, or property damage.
Do not install the furnace on its back or hang furnace with control compartment facing downward. Safety control operation will be adversely affected. Never connect returnair ducts to the back of the furnace.
!
MINOR PROPERTY HAZARD
Failure to follow this caution may result in minor property damage.
Local codes may require a drain pan under entire furnace and condensate trap when a condensing furnace is used in an attic application or over a finished ceiling.
The furnace can be installed horizontally in an attic or crawlspace on either the lefthand (LH) or righthand (RH) side. The furnace can be hung from floor joists, rafters or trusses or installed on a noncombustible platform, blocks, bricks or pad.
Suspended Furnace Support
The furnace may be supported under the entire length of the furnace with threaded rod and angle iron. (See Figure 26) Secure angle iron to bottom of furnace as shown.
Platform Furnace Support
Construct working platform at location where all required furnace clearances are met. (See Table 1 and Figure 27) For furnaces with 1in. (25 mm) clearance requirement on side, set furnace on non−combustible blocks, bricks or angle iron. For crawlspace installations, if the furnace is not suspended from the floor joists, the ground underneath furnace must be level and the furnace set on blocks or bricks.
RollOut Protection
Provide a minimum 12−in. x 22−in. (305 x 559 mm) piece of sheet metal for flame rollout protection in front of burner area for furnaces closer than 12in. (305 mm) above the combustible deck or suspended furnaces closer than 12−in. (305mm) to joists. The sheet metal MUST extend underneath the furnace casing by 1−in. (25mm) with the door removed. The bottom closure panel may be used for flame roll−out protection when bottom of furnace is used for return air connection. See Figure 27 for proper orientation of roll−out shield.
WARNING
CAUTION
440 01 4105 00 23
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 26 Suspended Furnace Installation
COMBUSTION AIR PIPE (SEE VENTING SECTION)
2in. (51 mm)
ROLLOUT PROTECTION REQUIRED Install 12” x 22” (305 x 559 mm) sheet metal in front of burner compartment area.
The sheet metal MUST extend above the furnace casing by 1in. (25mm) with the door removed.
A11155
NOTE: Local codes may require a drain pan and condensate trap when a condensing furnace is installed over a finished
ceiling.
Figure 27 Working Platform for Attic Installation
COMBUSTION AIR PIPE (SEE VENTING SECTION)
2in. (51 mm)
ROLLOUT PROTECTION REQUIRED Install 12” x 22” (305 x 559 mm) sheet metal in front of burner compartment area.
The sheet metal MUST extend under­neath the furnace casing by 1in. (25mm) with the door removed.
The bottom closure panel may be used for flame rollout protection when bottom of furnace is used for return air connec­tion.
L14F019
NOTE: Local codes may require a drain pan and condensate trap when a condensing furnace is installed over a finished
ceiling.
24 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Supply Air Connections
For a furnace not equipped with a cooling coil, the outlet duct shall be provided with a removable access panel. This opening shall be accessible when the furnace is installed and shall be of such a size that the heat exchanger can be viewed for possible openings using light assistance or a probe can be inserted for sampling the air stream. The cover attachment shall prevent leaks. Connect supplyair duct to flanges on furnace supply−air outlet. Bend flange upward to 90 with wide duct pliers. (See Figure 23) The supplyair duct must be connected to ONLY the furnace supply−outlet−air duct flanges or air conditioning coil casing (when used). DO NOT cut main furnace casing side to attach supply air duct, humidifier, or other accessories. All supply−side accessories MUST be connected to duct external to furnace main casing.
Return Air Connections
The returnair duct may be connected to bottom of the furnace. The side of casing that faces downward may also be used for return air connection. A combination of the bottom and downward facing side may also be used. The upward facing side of the casing cannot be used as a return air connection. Bypass humidifier may be attached into unused return air side of the furnace casing. (See Figure 30)
Bottom Return Air Inlet
These furnaces are shipped with bottom closure panel installed in bottom return−air opening. Remove and discard this panel when bottom return air is used. To remove bottom closure panel, perform the following:
1. Tilt or raise furnace and remove four (4) screws holding bottom plate. (See Figure 20)
2. Remove bottom plate.
3. Remove bottom closure panel.
4. Reinstall bottom plate and screws.
Side Return Air Inlet
These furnaces are shipped with bottom closure panel installed in bottom return−air opening. This panel MUST be in place when side return air inlet(s) are used without a bottom return air inlet. Not all horizontal furnaces are approved for side return air connections (See Figure 30)
Filter Arrangement
!
FIRE, CARBON MONOXIDE AND POISONING HAZARD
Failure to follow this warning could result in personal injury, or death.
Never operate a furnace without a filter or filtration device installed. Never operate a furnace with filter or filtration device access doors removed.
Furnaces shipped without a filter rack:
There are no provisions for an internal filter in these furnaces. An external filter rack is required and is purchased separately. A field supplied accessory air cleaner may also be used in place of the filter rack. For upflow applications, the filter can be installed on either side of the furnace, the bottom of the furnace or any combination of side and bottom of the furnace. (See Figure 29, Figure 32, and Figure 31) For downflow applications, the filter rack (or field supplied accessory air cleaner) must only be connected to the bottom opening on the furnace (See Figure 28 and Figure 31 and
Table 9).
WARNING
For horizontal applications, the filter rack (or field supplied accessory air cleaner) can be connected to the bottom opening on the furnace. For side return use in the horizontal position, refer to Figure 30. If both side and bottom openings are used in Figure 30, each opening used will require a filter. A filter rack or any field supplied accessory air cleaner can also be installed in the common return duct prior to entering the return air opening in any orientation.
See Table 6 for recommended filter size details.
Table 6 Filter Size Information in. (mm)
FURNACE
CASING
WIDTH
14-3/16
(360)
17-1/2
(445)
21 (533)
24-1/2
(622)
* Recommended to maintain air filter face velocity. See Product Data for part number.
Refer to the instructions supplied with the Filter Rack or accessory air filter for additional assembly and installation options.
SIDE RETURN
16 x 25 x 3/4
(406 x 635 x 19)
16 x 25 x 3/4
(406 x 635 x 19)
16 x 25 x 3/4
(406 x 635 x 19)
16 x 25 x 3/4
(406 x 635 x 19)
FILTER SIZE
14 x 25 x 3/4
(356 x 635 x 19)
16 x 25 x 3/4
(406 x 635 x 19)
20 x 25 x 3/4
(508 x 635 x 19)
24 x 25 x 3/4
(610 x 635 x 19)
BOTTOM
RETURN
FILTER
TYPE
Washable*
Washable*
Washable*
Washable*
Filter and Return Duct Sizing
Pressure drop must be taken into account when sizing filters, filter racks, IAQ devices, and associated system ductwork. See Table 7 for a comparison of Pressure Drop (initial/clean resistance to airflow) versus Airflow for a variety of filter media types and sizes. These are representative numbers. Consult the filter or IAQ device manufacturers’ specification sheet for performance data for a particular filter media or IAQ device.
Design the filter and associated ductwork for the best match of pressure drop versus filter size. Best practice usually chooses filter systems with pressure drops under 0.2 in. w.c. (50 Pa), with the best blower electrical efficiency and system airflow performance occurring with filter pressure drops under 0.1 in wg (25 Pa).
Due to the relatively high pressure drops of 1-in (25 mm) thick after-market filter media, it is recommended that the filtration system be designed for at least 2-in (51 mm) thick media.
TIPS FROM CONTRACTORS: Install a media cabinet capable
of incorporating a 4-in (102 mm) thick media filter. This allows room for future upgrades to other IAQ devices.
NOTICE
Design the duct system FIRST to determine how much pressure drop may be allowed in the filter system. See the AIR DUCTS section. Excessive filter pressure drop often compromises system airflow and duct perform­ance, causes inadequate airflow to the furthest ends of the duct system, as well as causes excess noise and higher than anticipated electrical consumption.
Provide duct transitions, as required, to smoothly transition airflow from the return duct system to the filter (or IAQ device) to the furnace when the dimensions of the ductwork or furnace return air opening do not match the required filter or IAQ device dimensions. See the instructions supplied with factory-accessory duct adapters.
440 01 4105 00 25
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Table 7 Filter Media Pressure Drop (Clean) Versus Airflow - in. w.c. (Pa)
Factory-Accy
14 x 25 Filter
Washable
CFM L/s (1-in. / 2.5 cm) (1-in. / 2.5 cm) (2-in. / 5 cm) (1-in. / 2.5 cm) (2-in. / 5 cm)
600 (283) 0.04 (12) 0.07 (17) 0.10 (26) 0.24 (60) 0.16 (40)
800 (378) 0.06 (15) 0.10 (25) 0.15 (39) 0.34 (85) 0.23 (59) 1000 (472) 0.07 (18) 0.13 (34) 0.21 (52) - - 0.32 (81) 1200 (566) 0.08 (20) 0.17 (43) 0.27 (68) - - - -
Representative After-Market Filter Media*
Fiberglass* Pleated*
Representative After-Market Filter Media*
Fiberglass* Pleated*
16x 25 Filter
Factory-Accy
Washable
CFM L/s (1-in. / 2.5 cm) (1-in. / 2.5 cm) (2-in. / 5 cm) (1-in. / 2.5 cm) (2-in. / 5 cm)
600 (283) 0.04 (10) 0.06 (15) 0.09 (22) 0.20 (51) 0.13 (34)
800 (378) 0.05 (13) 0.08 (21) 0.13 (32) 0.29 (72) 0.20 (49) 1000 (472) 0.06 (16) 0.11 (28) 0.17 (43) - - 0.27 (67) 1200 (566) 0.07 (18) 0.14 (36) 0.22 (56) - - - ­1400 (661) 0.08 (21) 0.18 (45) 0.28 (70) - - - ­1600 (755) 0.09 (23) 0.21 (54) - - - - - ­1800 (850) 0.10 (25) 0.26 (64) - - - - - -
Representative After-Market Filter Media*
Fiberglass* Pleated*
20 x 25 Filter
Factory-Accy
Washable
CFM (L/s) (1-in. / 2.5 cm) (1-in. / 2.5 cm) (2-in. / 5 cm) (1-in. / 2.5 cm) (2-in. / 5 cm)
800 (378) 0.04 (11) 0.06 (16) 0.09 (24) 0.22 (55) 0.15 (37) 1000 (472) 0.05 (13) 0.08 (21) 0.13 (32) 0.29 (72) 0.20 (49) 1200 (566) 0.06 (15) 0.11 (27) 0.16 (41) - - 0.25 (63) 1400 (661) 0.07 (17) 0.13 (33) 0.20 (51) - - 0.31 (79) 1600 (755) 0.08 (19) 0.16 (40) 0.24 (61) - - - ­1800 (850) 0.08 (21) 0.18 (47) 0.29 (73) - - - ­2000 (944) 0.09 (23) 0.21 (54) - - - - - ­2200 (1038) 0.09 (24) 0.25 (62) - - - - - -
Representative After-Market Filter Media*
Fiberglass* Pleated*
25 x 25 Filter
Factory-Accy
Washable
CFM L/s (1-in. / 2.5 cm) (1-in. / 2.5 cm) (2-in. / 5 cm) (1-in. / 2.5 cm) (2-in. / 5 cm)
800 (378) 0.03 (9) 0.05 (12) 0.07 (18) 0.17 (43) 0.11 (28) 1000 (472) 0.04 (11) 0.06 (16) 0.09 (24) 0.22 (55) 0.15 (37) 1200 (566) 0.05 (13) 0.08 (20) 0.12 (31) 0.27 (68) 0.18 (47) 1400 (661) 0.06 (15) 0.10 (24) 0.15 (38) - - 0.23 (58) 1600 (755) 0.06 (16) 0.11 (29) 0.18 (45) - - 0.28 (69) 1800 (850) 0.07 (18) 0.13 (34) 0.21 (53) - - - ­2000 (944) 0.08 (19) 0.16 (39) 0.24 (61) - - - ­2200 (1038) 0.08 (21) 0.18 (45) 0.28 (70) - - - -
* Representative estimates from filter manufacturer data sheets.
See manufacturers’ specifications for pressure drop versus airflow data for specific filter media.
If the filter size that you are looking for is not contained in Table 7, refer to Table 8 for a comparison of Pressure Drop (initial/clean resistance to airflow) versus Face Velocity for a variety of filter media types.
The following equations relate Face Velocity (FPM), Filter Area and Airflow (CFM):
Filter Face Velocity = Airflow / Filter Area Minimum Filter Area = Rated System Airflow / Maximum Filter Face Velocity
Table 8 Filter Media Pressure Drop (Clean) Versus Velocity - in. w.c. (Pa)
Face Velocity FactoryAccy
Washable
Fiberglass* Pleated*
FPM (m/s) (1in. / 2.5 cm) (1in. / 2.5 cm) (2in. / 5 cm) (1in. / 2.5 cm) (2in. / 5 cm)
200 (1) 0.04 (10) 0.05 (13) 0.08 (20) 0.18 (47) 0.12 (31)
300 (1.5) 0.05 (14) 0.09 (22) 0.13 (34) 0.30 (75) 0.21 (52)
400 (2) 0.07 (17) 0.13 (32) 0.20 (50) 0.31 (78)
500 (2.5) 0.08 (21) 0.18 (44) 0.27 (69)
600 (3) 0.09 (23) 0.23
700 (3.6) 0.10 (26) 0.29
* Representative estimates from filter manufacturer data sheets.
See manufacturers’ specifications for pressure drop versus airflow data for specific filter media.
26 440 01 4105 00
Specifications subject to change without notice.
Representative AfterMarket Filter Media*
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 28
Figure 29
Downflow Return Air Configurations and Restrictions
L10F033
Upflow Return Air Configurations and Restrictions
External Filter Cabinet Configurations
Figure 31 Accessory Bottom Filter Rack
L10F031
B
A
L10F032
Figure 30
HORIZONTAL TOP RETURN NOT PERMITTED FOR ANY MODEL
SIDE RETURN AIR NOT PERMITTED FOR 2000 CFM AND ABOVE OF AIR FLOW
Horizontal Return Air Configurations and Restrictions
L10F034
A
225/16
(566.4)
287/16
(722.2)
23/16
(55.5)
Table 9 Dimensional Drawing in. (mm)
KIT NO.
NAHB00501FF
NAHB00601FF
NAHB00701FF
NAHB00801FF
FURNACE
WIDTH
143/16
(360.4) 171/2
(444.5)
21
(533.4) 241/2
(622.3)
A B
113/8
(289)
145/8
(371.5) 181/8
(460.4) 215/8
(549.3)
141/4
(362)
175/8
(447.7)
211/8
(536.6)
245/8
(625.5)
440 01 4105 00 27
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
)
)
Figure 32 Accessory Side Filter Rack
FURNACE
FILTER FRAME
17 ⅛” (43.5 cm)
1 ¼” (3 cm)
(TYP.)
1
/
4”
1
(3 cm)
DOOR
FILTER
” (1 cm)
TABS
25 ⅛” (64 cm)
23 ” (59 cm)
OPENING
TABS
½” (1.3 cm)
14 ½” (37 cm)
OPENING
L10F027
¾
(2 cm)
16 ⅛” (41 cm
2 ⅜” (6 cm
Systems Design Guidelines reference tables available from your local distributor. The duct system should be sized to handle the required system design CFM at the design external static pressure. The furnace airflow rates are provided in the Service and Technical Support Manual. When a furnace is installed so that the supply ducts carry air circulated by the furnace to areas outside the space containing the furnace, the return air shall also be handled by duct(s) sealed to the furnace casing and terminating outside the space containing the furnace.
Secure ductwork with proper fasteners for type of ductwork used. Seal supply and returnduct connections to furnace with code approved tape or duct sealer.
NOTE: Flexible connections should be used between ductwork and furnace to prevent transmission of vibration.
Ductwork passing through unconditioned space should be insulated to enhance system performance. When air conditioning is used, a vapor barrier is recommended.
Maintain a 1in. (25 mm) clearance from combustible materials to supply air ductwork for a distance of 36in. (914 mm) horizontally from the furnace. See NFPA 90B or local code for further requirements.
Return Duct Sizing
Refer to the Filter Selection and Duct Sizing section for information on the proper selection of filter sizes and the associated ductwork and duct transitions. Improperly designed filtering systems and return ductwork are the most common causes of airflow and/or noise complaints in HVAC systems.
Ductwork Acoustical Treatment
NOTE: Metal duct systems that do not have a 90 degree elbow
and 10 ft. (3 M) of main duct to the first branch takeoff may require internal acoustical lining. As an alternative, fibrous ductwork may be used if constructed and installed in accordance with the latest edition of SMACNA construction standard on fibrous glass ducts. Both acoustical lining and fibrous ductwork shall comply with NFPA 90B as tested by UL Standard 181 for Class 1 Rigid air ducts.
NOTE: For horizontal applications, the top most flange may be bent past 90 to allow the evaporator coil to hang on the flange temporarily while the remaining attachment and sealing of the coil are performed.
GAS PIPING
Air Ducts
L12F023
!
FIRE OR EXPLOSION HAZARD
WARNING
Failure to follow this warning could result in personal
NOTICE
Many states, provinces and localities are considering or have implemented standards and/or restrictions on duct sizing practices, ductwork leakage, and/or duct­work thermal, airflow and electrical efficiencies. CON­SULT LOCAL CODE OFFICIALS for ductwork design
injury, death, and/or property damage. Never purge a gas line into a combustion chamber.
Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections. A fire or explosion may result causing property damage, personal injury or loss of life.
and performance requirements in your area.
General Requirements
The duct system should be designed and sized according to accepted national standards such as those published by: Air Conditioning Contractors Association (ACCA Manual D), Sheet Metal and Air Conditioning Contractors National Association (SMACNA) or American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE) or consult The Air
28 440 01 4105 00
Specifications subject to change without notice.
FIRE OR EXPLOSION HAZARD
Failure to follow this warning could result in personal injury, death, and/or property damage.
Use proper length of pipe to avoid stress on gas con­trol manifold and a gas leak.
!
WARNING
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
!
WARNING
FIRE OR EXPLOSION HAZARD
Failure to follow this warning could result in personal injury, death, and/or property damage.
Gas valve inlet and/or inlet pipe must remain capped until gas supply line is permanently installed to protect the valve from moisture and debris. Also, install a sedi­ment trap in the gas supply piping at the inlet to the gas valve.
Gas piping must be installed in accordance with national and local codes. Refer to current edition of NFGC in the U.S.A. Refer to current edition of CAN/CSA B149.1 in Canada.
Installations must be made in accordance with all authorities having jurisdiction. If possible, the gas supply line should be a separate line running directly from meter to furnace.
NOTE: Use a back−up wrench on the inlet of the gas valve when connecting the gas line to the gas valve.
NOTICE
In the state of Massachusetts:
1. Gas supply connections MUST be performed by a li­censed plumber or gas fitter.
2. When flexible connectors are used, the maximum length shall not exceed 36−in. (915 mm).
3. When lever handle type manual equipment shutoff valves are used, they shall be T−handle valves.
4. The use of copper tubing for gas piping is NOT ap­proved by the state of Massachusetts.
Table 10 Maximum Capacity of Pipe
NOMINAL
IRON PIPE
SIZE
IN. (MM)
1/2 (13)
3/4 (19)
1 ( 25)
1‐1/4 (32)
1‐1/2 (39)
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14-in. w.c.) or less and a pressure drop of 0.5-in. w.c. (based on a 0.60 specific gravity gas). Ref: Table 10
above, and current edition of 6.2 of NFPA54/ANSI Z223.1.
An accessible manual equipment shutoff valve MUST be installed external to furnace casing and within 6 ft. (1.8 M) of furnace.
Install a sediment trap in riser leading to furnace as shown in Figure 33. Connect a capped nipple into lower end of tee. Capped nipple should extend below level of furnace gas controls. Place a ground joint union between furnace gas control valve and exterior manual equipment gas shutoff valve.
INTERNAL
DIA.
IN. (MM)
0.622 (158) 175 120 97 82 73
0.824 (20.9) 360 250 200 170 151
1.049 (26.6) 680 465 375 320 285
1.380 (35.0) 1400 950 770 660 580
1.610 (40.9) 2100 1460 1180 990 900
LENGTH OF PIPE FT (M)
10
(3.0)20(6.0)30(9.1)40(12.1)50(15.2)
Figure 33 Typical Gas Pipe Arrangement
Refer to Table 10 for recommended gas pipe sizing. Risers must be used to connect to furnace and to meter. Support all gas piping with appropriate straps, hangers, etc. Use a minimum of one hanger every 6 ft. (1.8 M). Joint compound (pipe dope) should be applied sparingly and only to male threads of joints. Pipe dope must be resistant to the action of propane gas.
!
WARNING
FIRE OR EXPLOSION HAZARD
A failure to follow this warning could result in personal in­jury, death, and/or property damage.
If local codes allow the use of a flexible gas appliance connector, always use a new listed connector. Do not use a connector which has previously served another gas ap­pliance. Black iron pipe shall be installed at the furnace gas control valve and extend a minimum of 2in. (51 mm) outside the furnace.
!
CAUTION
FURNACE DAMAGE HAZARD
Failure to follow this caution may result in furnace dam­age.
Connect gas pipe to furnace using a backup wrench to avoid damaging gas controls and burner misalignment.
L10F030
A 1/8−in. (3 mm) NPT plugged tapping, accessible for test gauge connection, MUST be installed immediately upstream of gas supply connection to furnace and downstream of manual equipment shutoff valve.
Piping should be pressure and leak tested in accordance with the current addition of the NFGC in the United States, local, and national plumbing and gas codes before the furnace has been connected. Refer to current edition of NSCNGPIC in Canada. After all connections have been made, purge lines and check for leakage at furnace prior to operating furnace.
NOTE: The furnace gas control valve inlet pressure tap connection is suitable to use as test gauge connection providing test pressure DOES NOT exceed maximum 0.5 psig (14in. w.c.) stated on gas control valve. (See Figure 34)
440 01 4105 00 29
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 34 Gas Valve Single Stage
ON/OFF Switch
1/2” NPT Inlet
1/8” NPT Inlet Pressure Tap
Regulator Seal Cap
Regulator Adjustment Regulator Seal Cap under Cap
1/8” NPT Manifold Pressure Tap
1/2” NPT Outlet
A11153
Low Capacity 26,000 BTUH Gas Valve
Regulator Seal Cap
Regulator Adjustment
Regulator Seal Cap
Under Cap
½” NPT Outlet
ON/OFF Switch
White Label
1.5” W.C.
If pressure exceeds 0.5 psig (14in. w.c.), gas supply pipe must be disconnected from furnace and capped before and during supply pipe pressure test. If test pressure is equal to or less than 0.5 psig (14in. w.c.), turn off electric shutoff switch located on furnace gas control valve and accessible manual equipment shutoff valve before and during supply pipe pressure test. After all connections have been made, purge lines and check for leakage at furnace prior to operating furnace.
The gas supply pressure shall be within the maximum and minimum inlet supply pressures marked on the rating plate with the furnace burners ON and OFF.
Some installations require gas entry on right side of furnace (as viewed in upflow). (See Figure 35)
” NPT Inlet Pressure Tap
Black Text
Green Label
Black Text
White Rodgers MODEL 36J60ï515 24V 50/60HZ .280 AMPS MAX. PRESS ½ PSI REG, 1.5” W.C.
½” NPT Inlet
A150631
Gas Pipe Grommet
For direct vent (2-pipe) applications, the knockout for the gas pipe must be sealed to prevent air leakage. Remove the knockout, install the grommet in the knockout, then insert the gas pipe. The grommet is included in the loose parts bag. (See
Figure 35)
Figure 35 Gas Entry
Left Side Gas Entry. Gas Pipe Grommet Required For Direct Vent Applications.
Gas Pipe Grommet Required For Direct Vent Applications
ELECTRICAL CONNECTIONS
!
ELECTRICAL SHOCK, FIRE OR EXPLOSION HAZARD
Failure to follow safety warnings could result in dangerous operation, serious injury, death or property damage. Improper servicing could result in dangerous operation, serious injury, death or property damage.
Before servicing, disconnect all electrical
power to furnace.
When servicing controls, label all wires prior
to disconnecting. Reconnect wires correctly.
Verify proper operation after servicing.
!
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death.
Blower door switch opens 115v power to control. No component operation can occur. Do not bypass or close switch with blower door removed.
See Figure 36 for field wiring diagram showing typical field 115 v wiring. Check all factory and field electrical connections for tightness.
Fieldsupplied wiring shall conform with the limitations of 63°F (33°C) rise.
!
ELECTRICAL SHOCK AND FIRE HAZARD
Failure to follow this warning could result in personal injury, death, or property damage.
The cabinet MUST have an uninterrupted or unbroken ground according to NEC NFPA 702011 or local codes to minimize personal injury if an electrical fault should occur. In Canada, refer to Canadian Electrical Code CSA C22.1. This may consist of electrical wire, conduit approved for electrical ground or a listed, grounded power cord (where permitted by local code) when installed in accordance with existing electrical codes. Refer to the power cord manufacturer’s ratings for proper wire gauge.
Do not use gas piping as an electrical ground.
WARNING
WARNING
WARNING
30 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Code CSA C22.1 and any local codes or ordinances that might
!
CAUTION
apply.
FURNACE MAY NOT OPERATE HAZARD
Failure to follow this caution may result in intermittent furnace operation.
Furnace control must be grounded for proper operation or else control will lock out. Control must remain grounded through green/yellow wire routed to gas valve and manifold bracket screw.
!
FIRE HAZARD
Failure to follow this warning could result in personal injury, death, or property damage.
Do not connect aluminum wire between disconnect switch and furnace. Use only copper wire.
WARNING
115−V Wiring
Furnace must have a 115-v power supply properly connected and grounded.
NOTE: Proper polarity must be maintained for 115-v wiring. If polarity is incorrect, control status indicator light flashes rapidly and furnace does NOT operate.
Verify that the voltage, frequency, and phase correspond to that specified on unit rating plate. Also, check to be sure that service provided by utility is sufficient to handle load imposed by this equipment. Refer to rating plate or Table 11 for equipment electrical specifications.
U.S.A. Installations: Make all electrical connections in accordance with the current edition of the National Electrical Code (NEC) NFPA 70 and any local codes or ordinances that might apply.
Canadian Installations: Make all electrical connections in accordance with the current edition of the Canadian Electrical
Figure 36 Heating and Cooling Application Single Stage Wiring Diagram
FIVE WIRE
THREE-WIRE
HEATING-ONLY
BLOWER DOOR SWITCH
BLK
WHT
115-V FIELD-
SUPPLIED
DISCONNECT
BLK
WHT
GND
AUXILIARY J-BOX
GND
FURNACE
NOTE 2
C O N
T R O
L
24-V
TERMINAL
BLOCK
WCR GY
W
R
G
COM
Y
NOTE 1
NOTES: Connect Y-terminal in furnace as shown for proper blower operation.
1.
2.
Some thermostats require a "C" terminal connection as shown.
3.
If any of the original wire, as supplied, must be replaced, use same type or equivalent wire.
SWITCH
COPPER
WIRE ONLY
ALUMINUM
Use a separate, fused branch electrical circuit with a properly sized fuse or circuit breaker for this furnace. See Table 11 for wire size and fuse specifications. A readily accessible means of electrical disconnect must be located within sight of the furnace.
FIELD 24-V WIRING FIELD 115-, 208/230-, 460-V WIRING FACTORY 24-V WIRING FACTORY 115-V WIRING
THERMOSTAT TERMINALS
CONDENSING UNIT
TWO WIRE
FIELD-SUPPLIED DISCONNECT
WIRE
GND
208/230- OR 460-V THREE PHASE
208/230-V SINGLE PHASE
A11146
A11387
440 01 4105 00 31
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
JBox Installation
!
FIRE OR ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury, death, or property damage.
If fieldsupplied manual disconnect switch is to be mounted on furnace casing side, select a location where a drill or fastener cannot damage electrical or gas components.
The J-Box is used when field line voltage electrical connections are made to the furnace wiring harness inside the furnace casing. The J-Box is not required if a field-supplied electrical box is attached to the outside of the furnace casing and the box is grounded to the green ground wire of the main wiring harness and the earth ground of the field electrical supply. The JBox cover, mounting bracket and screws are shipped in the loose parts bag included with the furnace. The J−Box can be mounted on the left or right side of the casing, as viewed from the upflow position. (See Figure 37)
Figure 37 Optional JBox Locations
Representative drawing only, some models may vary in appearance.
WARNING
OPTIONAL JBOX LOCATIONS
L12F024
Figure 38 JBox Bracket Installation
JBOX MOUNTING SCREWS
JBOX MOUNTING BRACKET
GROUND SCREW
JBOX COVER
L12F025
Remove the JBox cover and mounting bracket from the loose parts bag. Select a 7/8in. (22 mm) knock-out on the desired side of the casing. Remove the knock-out from the casing. Drill two 1/8in. (3 mm) pilot holes in the casing dimples by the desired 7/8−in. (22 mm) knock-out.
Align the JBox mounting bracket against the inside of the casing and secure the mounting bracket with the screws. (See
Figure 38)
Electrical Box on Furnace Casing Side
NOTE: Check that duct on side of furnace will not interfere with
installed electrical box.
1. Fasten a field-supplied external electrical box to the outside of the casing by driving two field-supplied screws from inside electrical box into casing. (See Figure 39)
2. Route field power wiring into external electrical box.
3. Pull furnace power wires through 1/2-in. (12 mm) diameter hole in JBox. If necessary, loosen power wires from strainrelief wire-tie on furnace wiring harness.
4. Connect any code required external disconnect(s) to field power wiring.
5. Route external field power wires through holes in electrical box and casing.
6. Connect field ground wire and factory ground wire to green ground screw on J−Box mounting bracket as shown in Figure 38.
7. Connect field power and neutral leads to furnace power leads. as shown in Figure 36.
8. Attach furnace JBox cover to mounting bracket with screws supplied in loose parts bag. Do not pinch wires between cover and bracket.
9. Complete external disconnect wiring and installation. Connect line voltage leads as shown in Figure 39. Use best practices (NEC)NFPA 70 in U.S.A. for wire bushings, strain relief, etc., and Canadian Electrical Code CSA C22.1.
32 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 39
FieldSupplied Electrical Box on Furnace Casing
GROUND
NEUTRAL
LINE VOLTAGE
A10141
Power Cord Installation in Furnace J−Box
NOTE: Power cords must be able to handle the electrical
requirements listed in Table 11. Refer to power cord manufacturer’s listings.
1. Install JBox mounting bracket to inside of furnace
casing. (See Figure 38)
2. Route listed power cord through 7/8−in. (22 mm) diameter hole in casing and JBox bracket.
3. Secure power cord to J−Box bracket with a strain relief bushing or a connector approved for the type of cord used.
4. Pull furnace power wires through 1/2in. (12 mm) diameter hole in JBox. If necessary, loosen power wires from strain—relief wiretie on furnace wiring harness.
5. Connect field ground wire and factory ground wire to green ground screw on J−Box mounting bracket as shown in Figure 38.
6. Connect power cord power and neutral leads to furnace power leads as shown in Figure 36.
7. Attach furnace JBox cover to mounting bracket with screws supplied in loose parts bag. Do not pinch wires between cover and bracket.
BX Cable Installation in Furnace J−Box
1. Install JBox mounting bracket to inside of furnace casing.
2. Route BX connector through 7/8−in. (22 mm) diameter hole in casing and J−Box bracket.
3. Secure BX cable to J−Box bracket with connectors approved for the type of cable used.
4. Connect field ground wire and factory ground wire to green ground screw on J−Box mounting bracket as shown in Figure 38.
5. Connect field power and neutral leads to furnace power leads. as shown in Figure 36.
6. Attach furnace JBox cover to mounting bracket with screws supplied in loose parts bag. Do not pinch wires between cover and bracket.
! WARNING
FIRE, EXPLOSION, ELECTRICAL SHOCK, AND CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in dangerous operation, personal injury, death, or property damage.
Do no drill into blower shelf of furnace to route control wiring. Route any control or accessory wiring to the blower compartment through external knockouts on the casing.
24−V Wiring
Make field 24v connections at the 24v terminal strip. (See Figure 41) Connect terminal Y as shown in Figure 36 for proper cooling operation. Use only AWG No. 18, color−coded, copper thermostat wire. NOTE: Use AWG No. 18 color-coded copper thermostat wire for lengths up to 100 ft. (30.5 M). For wire lengths over 100 ft., use AWG No. 16 wire. The 24v circuit contains an automotivetype, 3amp. fuse located on the control. Any direct shorts during installation, service, or maintenance could cause this fuse to blow. If fuse replacement is required, use ONLY a 3amp. fuse of identical size. (See Figure 41)
See the Service and Technical Support manual for detailed instructions on control wiring and setup.
Thermostats and Control Settings for N9MSE SingleStage Furnaces
A single stage heating and singlestage cooling thermostat may be used with the furnace. Refer to typical thermostat wiring diagrams and the Sequence of Operation section of the Service and Technical Support manual for details on configuring the furnace control board. Consult the thermostat installation instructions for specific information about configuring the thermostat.
Accessories (See Figure 40 and/or Figure 41)
1. Electronic Air Cleaner (EAC): Connect an accessory Electronic Air Cleaner (if used) using 1/4in female quick connect terminals to the two male 1/4in quickconnect terminals on the control board marked EAC and NEUTRAL. The terminals are rated for 115 VAC, 1.0 amps maximum and are energized during blower motor operation. (See Figure 41)
2. Humidifier (HUM 24VAC and HUM)
a. HUM 24VAC: Connect an accessory 24 VAC, 0.5
amp maximum humidifier (if used) to the 1/4in male quickconnect HUM 24VAC terminal and C screw terminal on the control board thermostat strip. The HUM 24VAC terminal is energized when there is a call for heat (W) and the pressure switch (LPS) closes. (See Figure 41)
b. HUM: Connect an accessory 115VAC (EAC and
HUM are 1 amp maximum combined) humidifier (if used) to the ¼inch male quick connect HUM terminal and NEUTRAL ¼inch quick connect. The HUM terminal is energized when the inducer motor is energized (IDR). (See Figure 41)
NOTE: A field−supplied, 115v controlled relay connected to EAC terminals may be added if humidifier operation is desired during blower operation.
NOTE: DO NOT connect furnace control HUM 24VAC terminal to H (humidifier) terminal on humidity sensing thermostat, or similar device. See humidity sensing thermostat, thermostat, or controller manufacturer’s instructions for proper connection.
440 01 4105 00 33
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Alternate Power Supplies
This furnace is designed to operate on a utility generated power which has a smooth sinusoidal waveform. If the furnace is to be operated on a generator or other alternate power
Power from an alternate power supply that non-sinusoidal may damage the furnace or cause erratic furnace operation.
Contact the alternate power supply manufacturer for specifications and details.
supply, the alternate power supply must produce a smooth sinusoidal waveform for compatibility with furnace electronics. The alternate power supply must generate the same voltage, phase, and frequency (Hz) as shown in Table 11 or on the furnace rating plate.
Table 11 Electrical Data
N9MSE SINGLESTAGE, PSC BLOWER FURNACES
VOLTS
HERTZ
UNIT SIZE
0261408 115-60-1 127 104 3.6 5.4 14 68 (20.7) 15 0401410 115-60-1 127 104 6.8 9.5 14 39 (11.9) 15 0401712 115-60-1 127 104 8.3 11.4 14 32 (9.8) 15 0601410 115-60-1 127 104 7.0 9.7 14 38 (11.6) 15 0601714 115-60-1 127 104 8.4 11.5 14 32 (9.8) 15 0801716 115-60-1 127 104 9.6 13.0 14 28 (8.5) 15 0802120 115-60-1 127 104 14.5 19.1 12 30 (9.1) 20
1002114 115-60-1 127 104 7.6 10.4 14 35 (10.7) 15 1002120 115-60-1 127 104 14.6 19.2 12 29 (8.8) 20 1202420 115-60-1 127 104 14.9 19.6 12 29 (8.8) 20 1402420 115-60-1 127 104 14.9 19.6 12 29 (8.8) 20
* Permissible limits of the voltage range at which the unit operates satisfactorily. # Unit ampacity = 125 percent of largest operating component’s full load amps plus 100 percent of all other potential operating components’ (EAC, humidifier, etc.) full load amps.
PHASE
OPERATING VOLTAGE
RANGE*
Maximum* Minimum*
MAXIMUM
UNIT
AMPS
UNIT
AMPACITY#
Timedelay type is recommended. Length shown is as measured one way along wire path between unit and
service panel for maximum 2 percent voltage drop.
MINIMUM
WIRE
SIZE
AWG
MAXIMUM
WIRE LENGTH
FT (M)}
Figure 40 Isolation Relay for Humidifiers with Internal Power Supply
MAXIMUM
FUSE OR CKT
BKR
AMPS{
To Humidifier Leads
To Humidifier Leads
To HUM 24 VAC Terminal
On Furnace Control Board
24 V
Coil
To C Screw Terminal
on Thermostat Strip
A11157
34 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 41 Example of Single Stage Furnace Control for PSC Blower Motor
HEAT
90 150
HUM
COMPONENT TEST
TERMINAL
120 180
P1
EAC 1 AMP
1AMP@115VAC
L1
HUMIDIFIER TERMINAL (24VAC 0.5 AMP MAX)
TRANSFORMER 24−VAC CONNECTIONS
P1 LOW VOLTAGE MAIN HARNESS CONNECTOR
24V THERMOSTAT
TERMINALS
3AMP FUSE
LED OPERATION & DIAGNOSTIC LIGHT
115 −VAC (L2) NEUTRAL
CONNECTIONS
J2 JUMPER
COM/BLUE
NEUTRAL
L2
OFFDELAY
J2
24VAC
24VAC/RED
BLW
SPARE1
SPARE2
BLOWER SPEED
SELECTION TERMINALS
SPARE1
SPARE2
SPARE3
VENTING
NOTE: Planning for the venting system should be done in
conjunction with planning for the ductwork, drainage, and furnace accessories, such as air cleaners and humidifiers. Begin assembling the venting system AFTER the furnace is set in place in the required orientation. Venting for this furnace shall follow all Local codes for category IV venting systems. This furnace is CSA approved for venting with PVC/ABS DWV venting systems. This furnace is also CSA approved for venting the M&G DuraVent PolyPro polyproplylene venting systems. NOTE: THESE INSTRUCTIONS DO NOT CONTAIN DETAILED INSTALLATION INSTRUCTIONS FOR POLYPROPYLENE VENTING SYSTEMS. Refer to the polyproplylene venting system manufacturer’s installation instructions for the polyproplylene venting system installation. NOTE: When using polypropylene venting systems, all venting materials used, including the vent terminations, must be from the same manufacturer.
Special Venting Requirements for Installations in Canada
Installation in Canada must conform to the requirements of CAN/CSA B149 code. Vent systems must be composed of pipe, fittings, cements, and primers listed to ULC S636. The special vent fittings, accessory concentric vent termination kits, and accessory external drain trap available from the manufacturer have been certified to ULC S636 for use with those Royal Pipe and IPEX PVC vent components which have been certified to this standard. In Canada, the primer and cement must be of the same manufacturer as the vent system – GVS-65 Primer (Purple) for Royal Pipe or IPEX System 636, PVC/CPVC Primer, Purple Violet for Flue Gas Venting and GVS-65 PVC Solvent Cement for Royal Pipe or IPEX System
t, PVC Cement for Flue Gas Venting, rated Class IIA, 65
636
(1)
deg C. must be used with this venting system - do not mix primers and cements from one manufacturer with a vent
SPARE3
115 VAC (L1) LINE VOLTAGE CONNECTION
XFMR
HUM
HUMIDIFIER TERMINAL 115 VAC
P2
IND
HSI
P2HOT SURFACE IGNITOR (HSI) & INDUCER MOTOR (IND) CONNECTOR
system from a different manufacturer. Follow the manufacturer’s instructions in the use of primer and cement and never use primer or cement beyond its expiration date.
The safe operation, as defined by ULC S636, of the vent system is based on following these installation instructions, the vent system manufacturer’s installation instructions, and proper use of primer and cement. All fire stop and roof flashing used with this system must be UL listed material. Acceptability under Canadian standard CAN/CSA B149 is dependent upon full compliance with all installation instructions. Under this standard, it is recommended that the vent system be checked once a year by qualified service personnel.
The authority having jurisdiction (gas inspection authority, municipal building department, fire department, etc) should be consulted before installation to determine the need to obtain a permit.
*IPEX System 636™ is a trademark of IPEX Inc.
Consignes spéciales pour l’installation de ventilation au Canada
L’installation faite au Canada doit se conformer aux exigences du code CAN/CSA B149. Ce systême de ventillation doit se composer de tuyaux, raccords, ciments et apprêts conformes au ULC S636. La tuyauterie de ventilation des gaz, ses accessoires, le terminal concentrique mural ainsi que l’ensemble du drain de condensation extérieur fourni par le fabricant de cette fournaise ont été certifiés ULC S636 pour l’application des composantes Royal Pipe, IPEX PVC qui sont certifiées à ce standard. Au Canada, l’apprêt et le ciment doivent être du même fabricant que le système d’évacuation. L’apprêt GVS-65 (Purple) et le ciment-solvant GVS-65 doivent être utilisé avec les Royal Pipe. Système IPEX 636, apprêt PVC/CPVC, Purple pour évacuation des gaz de combustion et système IPEX 636(1)t, ciment PVC pour évacuation des gaz de combustion, coté classe IIA, 65 deg C. doivent être utilisés avec le système d’évacuation IPEX 636 – Ne pas combiner l
L13F013
440 01 4105 00 35
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
’apprêt et le ciment d’un manufacturier avec un système d’évacuation d’un manufacturier différent.
Bien suivre les indications du manufacturier lors de l’utilisation de l’apprêt et du ciment et ne pas utiliser ceux-ci si la date d’expiration est atteinte.
L’opération sécuritaire, tel que définit par ULC S636, du système de ventilation est basé sur les instructions d’installation suivantes, ainsi que l’usage approprié de l’apprêt et ciment. Tout arrët feu et solin de toit utilisés avec ce système doivent être des matériaux listés UL. L’acceptation du standard Canadien CAN/CSA B149 est directement relié à l’installation conforme aux instructions ci- haut mentionnées. Le standard Canadien recommande l’ inspection par un personel qualifié et ce, une fois par année.
Les autoritées ayant juridiction (inspecteurs de gas, inspecteurs en bâtiments, département des incendies, etc) devraient être consultées avant l’installation afin de déterminer si un permis est requis.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow the steps outlined below for each ap­pliance connected to the venting system being placed into operation could result in carbon monoxide poison­ing or death.
Failure to follow the steps outlined below for each ap­pliance connected to the venting system being placed into operation could result in carbon monoxide poison­ing or death.
1. Seal any unused openings in venting system.
2. Inspect the venting system for proper size and hori­zontal pitch, as required in the National Fuel Gas Code, ANSI Z223.1/NFPA 54 or the CSA B149.1 Nat­ural Gas and Propane Installation Code and these in­structions. Determine that there is no blockage or re­striction, leakage, corrosion and other deficiencies, which could cause an unsafe condition.
3. As far as practical, close all building doors and win­dows and all doors between the space in which the ap­pliance(s) connected to the venting system are loc­ated and other spaces of the building.
4. Close fireplace dampers.
5. Turn on clothes dryers and any appliance not connec­ted to the venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they are operating at maximum speed. Do not operate a summer exhaust fan.
6. Follow the lighting instructions. Place the appliance being inspected into operation. Adjust the thermostat so appliance is operating continuously.
7. Test for spillage from draft hood equipped appliances at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle.
8. If improper venting is observed during any of the above tests, the venting system must be corrected in accordance with the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/or CSA B149.1 Natural Gas and Propane Installation Code.
9. After it has been determined that each appliance con­nected to the venting system properly vents when tested as outlined above, return doors, windows, ex­haust fans, fireplace dampers and any other gasfired burning appliance to their previous conditions of use.
General
If this furnace replaces a furnace that was connected to a vent system or chimney, the vent or vent connectors of other remaining appliances may need to be resized. Vent systems or vent connectors of other appliances must be sized to the minimum size as determined using appropriate table found in the current edition of National Fuel Gas Code NFPA 54/ANSI Z223.1. In Canada, refer to CAN/CSAB149.1
An abandoned masonry chimney may be used as a raceway for properly insulated and supported combustionair (when applicable) and vent pipes. Each furnace must have its own set of combustionair and vent pipes and be terminated individually, as shown in Figure 49 for Direct Vent (2−Pipe) system, or Figure 50 for singlepipe or ventilated combustion air option.
A furnace shall not be connected to a chimney flue serving a separate appliance designed to burn solid fuel. Other gas appliances with their own venting system may also use the abandoned chimney as a raceway providing it is permitted by local code, the current edition of the National Fuel Gas Code, and the vent or liner manufacturer’s installation instructions. Care must be taken to prevent the exhaust gases from one appliance from contaminating the combustion air of other gas appliances.
Do not take combustion air from inside the chimney when using ventilated combustion air or singlepipe vent option.
These furnaces can be vented as directvent (two−pipe), ventilated combustion air, or non-direct (singlepipe) vent system. Each type of venting system is described below. Common venting between these furnaces or other appliances is prohibited.
Materials
U.S.A.
Combustion air and vent pipe, fittings, primers, and solvents must conform to American National Standards Institute (ANSI) standards and American Society for Testing and Materials (ASTM) standards. See Table 13 for approved materials for use in the U.S.A. This furnace is also CSA approved for venting with M&G DuraVent® PolyPro® polyproplylene venting systems.
Canada
Special Venting Requirements for Installations in Canada Installation in Canada must conform to the requirements of CAN/CSA B149 code. Vent systems must be composed of pipe, fittings, cements, and primers listed to ULC S636. M&G DuraVent PolyPro polyproplylene venting systems are ULC S636 listed.
NOTE: When using polypropylene venting systems, all venting materials used, including the vent terminations, must be from the same manufacturer.
36 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Venting Systems
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow the instructions outlined below for each appliance being placed into operation could result in carbon monoxide poisoning or death.
For all venting configurations for this appliance and other gas appliances placed into operation for the structure, provisions for adequate combustion, ventilation, and dilution air must be provided in accordance with:
U.S.A. Installations: Current edition of Section 9.3 NFPA 54/ANSI Z223.1, Air for Combustion and Ventilation and applicable provisions of the local building codes.
Canadian Installations: Current edition of Part 8 of CAN/CSAB149.1. Venting Systems and Air Supply for Appliances and all authorities having jurisdiction.
WARNING
NOTICE
RECOMMENDED SUPPORT FOR VENT TERMINATIONS
It is recommended that sidewall vent terminations of over 24 inches (0.6 M) in length or rooftop vent terminations of over 36 inches (1 M) in length be supported by EITHER the fact­ory accessory vent termination kit or field-supplied brackets or supports attached to the structure. A factory accessory vent termination kit may be used for direct vent terminations. Termination kits are available for 2-in. or 3-in. pipe. See
Table 12 for available options.
Table 12 Vent Termination Kit for Direct Vent (2Pipe) Systems
Vent and Combus­tion Air Pipe Diame­ters
11/2in. (38 mm) No Yes No No No 2in. (51 mm) 2in. (51 mm) No Ye s No No No 2in. (51 mm)
21/2in. (64 mm) No No No Yes No
3in. (76mm) No No No Yes No 3in. (76 mm) 4in. (102 mm) No No No Yes Yes 3in. (76 mm)
11/2in.
(38 mm)
Direct Vent / 2−Pipe System
In a directvent (2pipe) system, all air for combustion is taken directly from outdoor atmosphere, and all flue products are discharged to outdoor atmosphere. Combustion-air and vent pipes must terminate together in the same atmospheric pressure zone, either through the roof (preferred) or a sidewall. See Figure 62 for references to clearances required by National code authorities.
NOTICE
OPTIONAL CONFIGURATION FOR COMBUSTION AIR INLET PIPE
In applications where there is a risk of excessive mois­ture entering the combustion air inlet pipe, a moisture trap may be added to the inlet pipe to help prevent moisture from entering the furnace from the combus­tion air inlet pipe. See Figure 52.
When sizing venting systems, the equivalent length of
Approved TwoPipe Termination Fittings
2in.
(51 mm)
21/2in.
(64 mm)
Provisions for adequate combustion, ventilation, and dilution air must be provided in accordance with:
3in.
(76mm)
Non-Direct Vent (1-pipe) System
In a non direct-vent (1-pipe) system, all air for combustion is taken from the area adjacent to furnace, and all flue products are discharged to outdoor atmosphere. Air for combustion must be supplied as described in the Air For Combustion and Ventilation Section. Do not use an abandoned chimney to supply outside air to the furnace. See Figure 63 for references to clearances required by National code authorities.
A combustion air pipe to the outdoors is not required for a single pipe vent system. A 12-in. (304 mm) long pipe with a 2in. (50 mm Nominal Dimension ND) tight radius 90 degree elbow is required to be attached to the combustion air pipe adapter on the furnace. (See Figure 59) This short inlet air pipe helps to ensure stable combustion, as well as allow for sound attenuation. To aid sound attenuation, point the inlet air pipe away from occupants. An extra elbow and/or five feet (1.5 M) of pipe may be used to accomplish the sound attenuation function.
4in.
(102 mm)
Allowable Con­centric Vent Kit
2in. (51 mm) 3in. (76 mm)
the optional inlet pipe moisture trap must be taken into account.
NOTICE
Ventilated Combustion Air Systems
In a ventilated combustion air option, the vent terminates and discharges the flue products directly to the outdoors similar to a direct vent system. See Figure 63 for references to clearances required by National code authorities.
All air for combustion is piped directly to the furnace from a space that is well ventilated with outdoor air (such as an attic or crawl space) and the space is well isolated from the living space or garage. Combustion air requirements for this option are the same as the requirements for providing outside air for combustion for a single pipe vent system. Refer to the “Air For Combustion and Ventilation Section.”
440 01 4105 00 37
Specifications subject to change without notice.
OPTIONAL VENTING BELOW THE FURNACE
The venting system may be positioned below the fur­nace ONLY IF the factory accessory External Vent Trap Kit is used. The External Vent Trap Kit is only approved for PVC/ABS DWV venting systems.
CAREFULLY FOLLOW THE INSTRUCTIONS PROVIDED WITH THE EXTERNAL VENT TRAP KIT FOR LAYING OUT THE VENTING SYSTEM AND THE DRAIN SYSTEM. The instructions included with
this furnace DO NOT APPLY to vent systems that are located below the furnace
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow the instructions outlined in Locating the Vent Termination for each appliance being placed into operation could result in carbon monoxide poison­ing or death.
The instructions included with this furnace DO NOT APPLY to vent systems that are located below the fur­nace. CAREFULLY FOLLOW THE INSTRUCTIONS
PROVIDED WITH THE EXTERNAL VENT TRAP KIT FOR LAYING OUT THE VENTING SYSTEM AND THE DRAIN SYSTEM when all or part of the venting system is placed below the furnace.
Proper configuration of the venting and drain system is critical when placing all or part of the venting system below the level of the furnace. VENT GASSES COULD BE RELEASED FROM THE DRAINAGE SYSTEM, if the instructions provided with the External Vent Trap Kit are not followed.
Table 13 Approved Combustion-Air and Vent Pipe, Fitting and Cement Materials (U.S.A. Installation)
1. All pipe, fittings, primers*, and solvents* must conform to American National Standards Institute (ANSI) standards and American Society for Testing and Materials (ASTM) standards or ULC S636 where required by code.
USA
CANADA
Material Description Type
PVC
2. See Table below for approved materials for use in the U.S.A.
3. ULC S636 vent systems must be composed of pipe, fittings, cements, and primers from the same supplier.
4. Factory accessory concentric vent kits are ULC S636 listed.
1. Installation in Canada must conform to the requirements of CAN/CSA B149 code.
2. Vent systems must be composed of pipe, fittings, cements, and primers from the same supplier and listed to ULC S636.
3. Not all materials below may be approved or listed to ULC S636.
4. Royal Pipe and IPEX are approved suppliers of ULC S636 pipe, fittings, cements and primers*.
5. Factory accessory concentric vent kits are ULC S636 listed for use with Royal Pipe and IPEX venting systems ASTM or ULC Specification
Pipe Fittings
Pressure Pipe Schedule 40 D1785 D2665
DWV Schedule 40 D1785 D2665
Cellular Core Schedule 40 F891 D2466
SDR 26 N/A D2241 N/A SDR 21 N/A D2241 N/A
IPEX Schedule 40 ULC S636 ULC S636 ULC S636 ULC S636
Royal Pipe Schedule 40 ULC S636 ULC S636 ULC S636 ULC S636
Solvents Primers*
F656 D2564
Cements
ABS
CPVC
*Colored or tinted solvents or primers must be used where required by code in the USA †ABS plastic does not require a primer before solvent cementing. A cleaner for ABS is recommended to remove any surface residue. ABS cleaners are not subject to ASTM standards.
Polypropylene Approved Manufacturer
Poly Pro® M & G Dura Vent Not Permitted Not Permitted NOTE: Polypropylene vent systems are UL1738 and ULC S636 listed and assembled using mechanical fastening systems supplied by the vent manufacturer.
38 440 01 4105 00
ABS Schedule 40 D1527 D2468
Cellular Core DWV
Pressure Pipe Schedule 40 F441 F438
SDR N/A F442 N/A
IPEX Schedule 40 ULC S636 ULC S636 ULC S636 ULC S636
Royal Pipe Schedule 40 ULC S636 ULC S636 ULC S636 ULC S636
Schedule 40 F628 D2661
Specifications subject to change without notice.
Clear Cleaner
For ABS†
F656 F493
Solvents
Primers
D2235
Cements
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 42
Attach gaskets to vent pipe and combustion air adapters
Vent Coupling and Adapter with Gaskets
Vent Coupling and Adapter
Figure 43 Vent Pipe Flush with Adaptor
VENT PIPE ADAPTER WITH GASKET INSTALLED ON FURNACE. VENT PIPE IS CUT FLUSH WITH TOP OF ADAPTER. PRIME AND CEMENT VENT PIPE TO ADAPTER. ALLOW TO DRY BEFORE IN­STALLING VENT COUPLING.
A13074
Locating the Vent Termination
General
NOTE: Termination Requirements for the Provinces of Alberta and Saskatchewan are located at the end of this section.
Combustionair inlet pipe (direct vent/2−pipe system only) and vent pipe must terminate outside structure, either through sidewall or roof.
For vent termination clearance, references to National codes are shown in Figure 62 for Direct Vent/2Pipe system and Figure 63 for Ventilated Combustion Air/Non−direct Vent/1Pipe system. For exterior termination arrangements, refer to Figure 62 for Direct Vent/2Pipe system and Figure 63 for Ventilated Combustion Air/Non Direct/1Pipe system. Contact Local code authorities for other requirements to and/or exemptions from the National codes shown in the figures.
Roof termination is the recommended termination location. Roof terminations provide better performance against sustained prevailing winds. The roof location is preferred since the vent and combustion air system is less susceptible to damage or contamination. The termination is usually located away from adjacent structures or other obstacles such as inside corners, windows, doors or other appliances. It is less prone to icing conditions, and it often has less visible vent vapors.
Sidewall terminations may require sealing or shielding of building surfaces with a corrosive resistance material due to the corrosive properties of combustion products from the vent system, as well as protection of adjacent structures.
A13076A
Figure 44 Vent Pipe Flush Showing Coupling
ALIGN NOTCHES IN VENT PIPE COUPLING OVER STAND OFF ON ADAPTER. TORQUE LOWER CL AMP 15 LB−IN. WHEN REMAINING VENT PIPE IS INSTALLED, TORQUE UPPER CL AMP TO 15 LBIN.
NOTICE
RECOMMENDED SUPPORT FOR VENT TERMINATIONS
It is recommended that side-wall vent terminations in excess of 24 inches (0.6 M) or rooftop terminations in excess of 36 inches (1.0 M) in vertical length be supported by EITHER the Direct Vent Termination Kit shown in Table 12 or by field-sup- plied brackets or supports fastened to the structure.
NOTE: (Direct Vent/2−Pipe system ONLY) Terminate with the standard termination as shown in Figure 62 or use a factoryapproved accessory termination kit.
When determining appropriate location for termination, consider the following guidelines:
1. Comply with all clearance requirements stated in
Figure 62 or Figure 63 per application.
2. Termination or termination kit should be positioned where vent vapors will not damage plants/shrubs, air conditioning equipment or utility meters.
3. Do not locate termination directly into prevailing winds. Termination should be positioned so that it will not be affected by sustained prevailing winds over 30 mph, wind eddy, such as inside building corners, or by recirculation of flue gases, airborne leaves, or light snow.
4. Termination or termination kit should be positioned where it will not be damaged by or subjected to foreign objects such as stones, balls, etc.
5. Termination or termination kit should be positioned where vent vapors are not objectionable.
A11339B
440 01 4105 00 39
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
INSIDE CORNER TERMINATIONS
Corner terminations for Direct Vent (2−pipe) terminations are permitted provided that:
1. The Direct Vent termination is located on the longer of the two walls.
2. The Direct Vent termination is located at a distance farther away from the inside corner than the length of the adjacent wall
3. All other clearance requirements are met
Example:
1. The length of wall “A” is 15−ft and the length of wall “B” is 6ft.
2. Therefore, the Direct Vent termination must be located on wall “A”.
3. The Direct Vent termination must be located at least 6−ft. away from the inside corner.
Figure 45 Inside Corner Termination
L14F028
Direct Vent / 2−Pipe System
Direct vent (2pipe) vent and combustion air pipes must terminate outside the structure. See Figure 62 for references to vent clearances required by National code authorities. Allowable vent and combustion air terminations are shown in
Figure 49.
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow the instructions outlined below for each appliance being placed into operation could result in carbon monoxide poisoning or death.
For all venting configurations for this appliance and other gas appliances placed into operation for the structure, provisions for adequate combustion, ventilation, and dilution air must be provided in accordance with:
U.S.A. Installations: Current edition of Section 9.3 NFPA 54/ANSI Z223.1 1, Air for Combustion and Ventilation and applicable provisions of the local building codes.
Canadian Installations: Current edition of Part 8 of CAN/CSAB149.1. Venting Systems and Air Supply for Appliances and all authorities having jurisdiction.
WARNING
Ventilated Combustion Air
The vent pipe for a Ventilated Combustion Air System must terminate outdoors. See Figure 62 for references to vent clearances required by National code authorities. Allowable vent terminations are shown in Figure 50. The combustion air pipe terminates in a well−ventilated attic or crawl space. Follow the clearances as shown in Figure 60 and Figure 61.
The combustion air pipe cannot terminate in attics or crawl spaces that use ventilation fans designed to operate in the heating season. If ventilation fans are present in these areas, the combustion air pipe must terminate outdoors as a Direct Vent System.
NonDirect Vent / 1−Pipe System
The vent pipe for a Non Direct Vent (1pipe) system must terminate outdoors. See Figure 63 for references to vent clearances required by National code authorities. Allowable vent terminations are shown in Figure 50.
A combustion air pipe to the outdoors is not required for a NonDirect Vent System. A 12in. long section of pipe with a tight radius 2in. (51 mm) 90 degree elbow is required to be attached to the furnace. See Figure 46 and Figure 48. This short inlet air pipe helps to ensure inlet air pipe away from occupants. An extra elbow and/or five feet (1.5 M) of pipe may be used to accomplish the sound attenuation function.
Termination Requirements for the Provinces of Alberta and Saskatchewan
The Provinces of Alberta and Saskatchewan require a minimum unobstructed distance of 4 ft. (1.2m) from the foundation to the property line of the adjacent lot for vent termination of any appliance with an input over 35,000 btuh. If there is less than 4 ft. (1.2m) of unobstructed distance to the property line of the adjacent lot, no type of vent termination is permitted for appliances with inputs greater than 35,000 btuh.
There are no additional restrictions on unobstructed distances greater than 8 ft. (2.4m). All single, two-pipe and concentric vents may be used, providing all other Code and manufacturer’s requirements in these instructions are adhered to. Refer to the appropriate Vent Termination section above for locating the vent termination .
If the unobstructed distance from the foundation to the property line of the adjacent lot is no less than 4 ft. (1.2m) and no greater than 8 ft. (2.4m), it will be necessary to re-direct the flue gas plume. In this situation, a concentric vent kit cannot be used. A 2-pipe termination (or single pipe termination when permitted) that re-directs the flue gas away by use of an elbow
or tee, certified to ULC S636 must be used. (See Figure 46 and Figure 48)
The concentric vent kit currently cannot be modified to attach an elbow to the vent portion of the rain cap. A tee attached to the rain cap could potentially direct the flue gas plume toward the intake air stream and contaminate the incoming combustion air for the furnace.
Refer to Figure 46 and Figure 48 for terminations approved for use in Alberta and Saskatchewan.
from the adjacent property line
40 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 46 Tee at Termination Outlet
OPTIONAL TERMINATION BRACKET FOR 2-PIPE TERMINATIONS
12 IN. (305 MM) MIN. SEPARATION BETWEEN BOTTOM OF COMBUSTION AIR AND BOTTOM OF VENT.
12-IN. (305 MM)
ABOVE ANTICIPATED
SNOW LEVEL
Figure 48 Vent Terminations
OPTIONAL BRACKET COUPLING
(ELBOW PARALLEL TO WALL)
COMBUSTION-AIR
12 IN. (305 MM) MIN. SEPARATION BETWEEN BOTTOM OF COMBUSTION AIR AND BOTTOM OF VENT.
MAINTAIN 12 IN. (305 MM) CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL OR GRADE, WHICHEVER IS GREATER.
A13078B
Figure 47
EXAMPLE FOR UPFLOW INSTALLATIONS. MAY BE APPLIED TO OTHER CONFIGURATIONS.
A13078A
Sample Inlet Air Pipe Connection for Polypropylene Venting Systems
EXHAUST
OVERHANG
CLEARANCE TO OVERHANG PER CODE
12 IN.
(305 MM) MIN. GROUND
LEVEL OR ANTICIPATED SNOW LEVEL
A13078C
A12220
440 01 4105 00 41
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 49 Combustion Air and Vent Pipe Termination for Direct Vent (2Pipe) System
Vertical separation between combustion air and vent
8 ¾ in. (222mm) for 3 in.(76mm)
6 ¾ in. (172mm) for 2in. (51mm)
Maintain 12 in. (305mm) min. Clearance above highest anticipated snow level maximum of 24 in. (614mm) above roof
18 in. Maximum
(457mm)
0
90
At least 36 in.
(914mm)
At least 36 in. (914mm)
Roof Termination (Preferred)
Note:
“A” denotes 0 To 2 in. (51mm)
A
Between the first 2 vents Third vent (and fourth vent, if used) must be 36 in. Away (91 4mm)
Abandoned masonry used as raceway (per code)
Concentric Vent and Combustion Air Side Termination
12 in. Min from overhang or roof (Typ.)
A
12 in. (305mm) separation between bottom of com bustion air and bottom of vent (Typ.)
Maintain 12 in. (305mm) min. Clearance above highest an ticipated snow level or grade whichever is greater (Typ.)
At least 36 in.
(914mm)
Concentric Vent and Combustion Air
Roof Termination (preferred)
A
At least 36 in. (914mm)
Note:
“A” denotes 0 To 2 in. (51mm) Between the first 2 vents Third vent (and fourth vent, if used) must be 36 in . Away (914mm)
A
Note:
36in. separation between pairs of inlets only required for directvent systems
Maintain 12 in. (305mm) min. Clearance above highest anticipated snow level maximum of 24 in. (614mm) above roof
1 in. (25mm) maximum (Typ.) from wall to inlet
12 in. From Overhang or roof (Typ.)
A
Maintain 12 in. (305mm) min. Clear At least 36 in. (914mm)
Side wall termination of less than 12 in. (305mm) above highest snow level
ance above highest anticipated snow
level or grade whichever is greater
(Typ.)
L12F044
Figure 50 Vent Pipe Termination for NonDirect Vent and Ventilated Combustion Air System
Roof Termination (Preferred)
Ven t
(305mm)
Maintain 12 in .
minimum clearance
above highest anticipated
snow level maximum of
24 in. (610mm) above roof.
Abandoned masonry used as raceway (per code)
12 in. min. (305 mm)from
overhang or roof
Sidewall Termination
with Straight Pipe (preferred)
Maintain 12 in. (305mm) minimum clearance above highest anticipated snow level or grade whichever is greater
90°
Side wall termination with 2 elbows (preferred)
12 in. (305 mm) min. from
overhang or roof
Maintain 12 in. (305mm) minimum clearance above highest anticipated snow level or grade whichever is greater.
6 in. (152mm) minimum clearance
between wall and end of vent pipe.
10 in. (254mm) maximum pipe length
A05091
42 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Size the Vent and Combustion Air Pipes General
Approved 2pipe
Vent or Combustion Air
Pipe Diameters
1 1/2in. X N/A N/A
2in. X N/A N/A
2 1/2in. N/A X N/A
3in. N/A X N/A 4in. N/A X X
Note: Optional accessory 2pipe termination brackets are
sized for 2in. and 3in. Pipe. If a termination bracket is re­quired for a 4in. termination, field fabricate the necessary brackets and clamps.
Furnace combustion air and vent pipe connections are sized for 2-in. (50 mm ND) PVC/ABS DWV pipe. The combustion air and vent pipe connections also accommodate 60mm polypropylene venting systems with outside diameters of approximately 60 mm (23/8 inches). Any pipe diameter change should be made outside furnace casing in vertical pipe. Any change in diameter to the pipe must be made as close to the furnace as reasonably possible (see Figure 51).
The Maximum Vent Length for the vent pipe and combustion air pipe (when used) equals the Maximum Equivalent Vent Length (MEVL) in Table 14, minus the number of fittings multiplied by the deduction for each type of fitting used from Table 15.
termination fittings
2in. 3in. 4in.
CombustionAir and Vent Pipe
Figure 51
Diameter Transition Location and Elbow Configuration
FURNACE
NOT IN HORIZONTAL SECTION
PIPE DIAMENTER TRANSITION IN SECTION
A93034
NOTICE
OPTIONAL CONFIGURATION FOR COMBUSTION AIR INLET PIPE
In applications where there is a risk of excessive mois­ture entering the combustion air inlet pipe, a moisture trap may be added to the inlet pipe to help prevent moisture from entering the furnace from the combus­tion air inlet pipe. See Figure 52. When sizing venting systems, the equivalent length of the optional moisture trap (15 feet/5 M) must be taken into account
Combustion Air Inlet Moisture Trap
To prevent moisture from trickling into the furnace vestibule, a trap can be installed in the intake air pipe near the furnace. Connecting a drain line to the trap is recommended as trace amounts of moisture will evaporate into the intake air stream. If the combustion air inlet is located near a moisture exhaust duct, or there are other concerns of excessive moisture being drawn into the combustion air inlet, it is encouraged to connect a drain line to the trap.
The trap can be constructed from a running tee of the same diameter of the intake air pipe with EITHER a removable cap attached to a 6-inch long pipe connected to the tee or the External vent Trap Kit to help prevent contaminants from entering the furnace. See Figure 52.
The External Vent Trap Kit accessory may be used as a trap for the combustion air inlet pipe if a large amount of moisture must be removed. The drain line may be connected to the same drain as the furnace condensate and the evaporator coil condensate line ONLY if the inlet air trap drain and the evaporator coil drain empty into an open segment of pipe above the drain, See Figure 13. When using the External Vent Trap Kit, refer to those instructions for proper drain connections.
The tee may also be connected to the intake air pipe on the side of the casing. See Figure 52.
In any configuration, it will be necessary to add the equivalent length of the tee (15 feet/5 M) to the Total Equivalent Vent Length of the venting system.
NOTICE
ADDITIONAL INFORMATION FOR POLYPROPYLENE VENTING SYSTEMS
Polypropylene venting systems include flexible vent pipe. These flexible vent pipes have a different equivalent vent length than straight sections of PVC/ABS DWV vent pipe. Be sure to make the appropriate deductions from the Maximum Equivalent Vent Length (MEVL), or additions to the Total Equivalent Vent Length (TEVL), when applying flexible vent pipes in polypropylene venting systems. See the polypropyl­ene vent system manufacturer’s installation instructions for details. When using metric-sized venting systems, use these equival­encies for obtaining the proper MEVL from the Tables:
Use 2” Vent Tables for 60mm (o.d.) vent systems Use 3” Vent Tables for 80mm (o.d.) vent systems Use 4” Vent Tables for 100mm (o.d.) vent systems
The measured length of pipe used in a single or 2−pipe termination is included in the total vent length. Include deductions from the Maximum Equivalent Vent Length (MEVL) contained in the Venting Tables for elbows and flexible vent pipe. Factory accessory concentric vent terminations, or pipe lengths and elbows used for “standard” vent terminations (see vent termination figures associated with Table 14) do not require a deduction from the Maximum Equivalent Vent Length. Include a deduction for a Tee when used for Alberta and Saskatchewan terminations.
NOTE: Polypropylene venting systems MAY require additional deductions from the MEVL, or additions to the TEVL, for vent terminations and flexible pipe sections. See the polypropylene venting system manufacturer’s instructions for details on equivalent lengths of vent terminations and flexible vent pipes, and for calculating total vent lengths.
To calculate the Total Equivalent Vent Length (TEVL) of the venting system:
1. Measure the individual distance from the furnace to the termination for each pipe.
2. Count the number of elbows for each pipe.
440 01 4105 00 43
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
3. For each pipe, multiply the number of elbows by the equivalent length for the type of elbow used. Record the equivalent length of all the elbows for each pipe.
4. If a Tee is used on the termination (Alberta and Saskatchewan, when required), record the equivalent length of the Tee used.
5. Calculate Total Equivalent Vent Length by adding the equivalent lengths of the fittings to the lengths of the individual vent and combustion air pipes.
6. When using polypropylene venting systems with flexible vent pipes, perform adjustments for the equivalent length of the flexible vent pipe to the calculated total equivalent venting system length. See the polypropylene vent system manufacturer’s instructions for details.
7. Select a diameter of vent pipe from Table 14 and note the Maximum Equivalent Vent Length (MEVL) shown for that application for that specific furnace input size. Compare the Total Equivalent Vent Length (TEVL) to the MEVL:
a. If the Total Equivalent Vent Length is shorter than the
Maximum Equivalent Vent Length for the diameter of pipe chosen, then that diameter of pipe selected may
b. If the Total Vent Length is longer than the Maximum
Equivalent Vent Length for the diameter of pipe chosen, that diameter pipe MAY NOT be used for venting the furnace. Try the next larger diameter pipe.
NOTE: If the calculated Total Equivalent Vent Lengths results in different diameter pipes for the vent and combustion air, select the larger diameter for both pipes.
NOTE: If the Maximum Vent Length for diameter of the pipe selected is longer than the measured length and the equivalent length of all the fittings and terminations (TEVL), recalculate Total Equivalent Vent Length using the next smaller diameter. If the Maximum Vent Length is still longer than the longer TEVL of the vent pipe or combustion air pipe, then that diameter of pipe selected may be used.
When installing vent systems with pipe lengths of 10 ft. (3.0 M) or less, use the smallest allowable pipe diameter. Using pipe size greater than required for short venting systems may result in loss of efficiency, incomplete combustion, flame disturbance, or flame sense lockout.
For vent systems longer than 10 ft. (3.0 M), any larger diameter shown in Table 14 for that size model may be used.
be used.
Figure 52 Recommended Combustion Air Inlet Moisture Trap
TO CODEAPPROVED DRAIN OR CONDENSATE PUMP
Representative drawing only, some models may vary in appearance
44 440 01 4105 00
Specifications subject to change without notice.
L12F028
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
P
Combustion Air and Vent Piping Insulation Guidelines
NOTE: Use closed cell, neoprene insulation or equivalent.
The vent pipe may pass through unconditioned areas. The amount of exposed pipe allowed is shown in Table 16.
1. Using winter design temperature (used in load calculations), find appropriate temperature for your application and furnace model.
2. Determine the amount of total and exposed vent pipe.
3. Determine required insulation thickness for exposed pipe length(s).
4. When combustion air inlet piping is installed above a suspended ceiling, the pipe MUST be insulated with moisture resistant insulation such as Armaflex or other equivalent type of insulation.
5. Insulate combustion air inlet piping when run in warm, humid spaces.
6. Install the insulation per the insulation manufacturer’s installation instructions.
NOTE: Pipe length (ft / M) specified for maximum pipe lengths located in unconditioned spaces (See Table 16) cannot exceed total allowable pipe length as calculated from Table 14.
Configure the Furnace
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
To route the vent pipe and combustion air pipe through the furnace, the manufacturer supplied kit must be used. Failure to properly seal the blower compartment from the furnace vestibule could result in the circulation of carbon monoxide throughout the structure. The vent pipe and combustion air pipe must be a continuous pipe while passing through the blower compartment. Seals supplied in this kit must be installed per the instructions provided. Follow all
WARNING
Install the Vent and Combustion Air Pipes
With the furnace installed in the required position, remove the desired knockouts from the casing. It will be necessary to remove one knockout for the vent pipe and the other knockout for the combustion air connection. (See Figure 12) Use a flat blade screwdriver and tap on the knockout on opposite sides, where the knockout meets the casing. Fold the knockout down with duct pliers and work the knockout back and forth until it is removed. Trim any excess metal from the knockout with tin snips. The vent elbow can be rotated to the required location on the casing if necessary. See Figure 54 to rotate the vent elbow:
1. Loosen the clamp on the inlet of the vent elbow attached to the inducer.
2. Rotate the vent elbow to the required position. There are rounded notches in the vent elbow to align it with the inducer for each orientation.
3. Tighten the clamp around the vent elbow. Torque the clamp to 15 lb-in. See Figure 55 through Figure 58.
Figure 54 Inducer Vent Elbow − PSC
Slope vent pipe back to the furnace at least ¼” per foot
L14F020B
procedures outlined in these instructions.
Near Furnace Vent Connections
Offsets in the vertical portion of the vent pipe should be made with 45 degree elbows instead of 90 degree elbows. Short horizontal runs of vent pipe are difficult to pitch correctly and may trap water in the vent pipe. Trapped water in the vent pipe may result in nuisance pressure switch tripping.
Figure 53 Near Furnace Vent Connections
PSC INDUCER ASSEMBLY
INDUCER OUTLET
Avoid short horizontal offsets with 90 deg. Elbows. Short offsets can be difficult to slope and may trap con­densate.
440 01 4105 00 45
Use 45 deg. Elbows where possible, to ensure conden­sate drainage.
L14F020A
Specifications subject to change without notice.
VENT ELBOW CLAMP TORQUE 15 LBIN.
VENT PIPE CLAM TORQUE 15 LBIN.
INDUCER OUTLET CHOKE 40,000 BTUH MODELS WITH 10 FT. (3.1 M) OF VENT OR LESS
A13075A
VENT ELBOW
A14277
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 55 Upflow Configurations
UPFLOW LEFT VENT CONFIGURATION
Representative drawing only, some models may vary in appearance.
Figure 56 Downflow Configurations
A11309
DOWNFLOW LEFT VENT CONFIGURATION
Representative drawing only, some models may vary in appearance.
A11311
UPFLOW RIGHT VENT CONFIGURATION
Representative drawing only, some models may vary in appearance.
UPFLOW VERTICAL VENT CONFIGURATION
Representative drawing only, some models may vary in appearance.
* See NOTES following figures.
A11308
A11310
DOWNFLOW RIGHT VENT CONFIGURATION
Representative drawing only, some models may vary in appearance.
DOWNFLOW VERTICAL VENT CONFIGURATION
Requires Accessory Internal Vent Kit
See Specification Sheets for current kit number
Representative drawing only, some models may vary in appearance.
* See NOTES following figures.
A11312
L11F063
46 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 57 Horizontal Left Configurations
HORIZONTAL LEFT VERTICAL VENT CONFIGURATION
Representative drawing only, some models may vary in appearance.
Figure 58 Horizontal Right Configurations
HORIZONTAL RIGHT VERTICAL VENT CONFIGURATION
Representative drawing only, some models may vary in appearance.
HORIZONTAL LEFT LEFT VENT CONFIGURATION
Representative drawing only, some models may vary in appearance.
HORIZONTAL LEFT RIGHT VENT CONFIGURATION*
* Requires accessory Internal Vent Kit
Representative drawing only, some models may vary in appearance.
* See NOTES following figures.
HORIZONTAL RIGHT LEFT VENT CONFIGURATION
Representative drawing only, some models may vary in appearance.
HORIZONTAL RIGHT RIGHT VENT CONFIGURATION
Representative drawing only, some models may vary in appearance.
* See NOTES following figures.
440 01 4105 00 47
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
NOTES:
1. Attach vent pipe adapter with gasket to furnace casing.
2. Align notches in rubber coupling over standoffs on adapter. Slide clamps over the coupling.
3. Slide vent pipe through adapter and coupling into vent elbow.
4. Insert vent pipe into vent elbow.
5. Torque all clamps 15−lb.−in.
6. Attach combustion air pipe adapter with gasket to furnace.
7. Attach combustion air pipe to adapter with silicone. Pilot drill a 1/8−in. Hole in adapter and secure with a #7 x 1/2−in. Sheet metal screw.
Installing the Vent Pipe Adapter and Combustion Air Pipe Adapter
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
To route the vent pipe and combustion air pipe through the furnace, the manufacturer supplied kit must be used. Failure to properly seal the blower compartment from the furnace vestibule could result in the circulation of carbon monoxide throughout the structure. The vent pipe and combustion air pipe must be a continuous pipe while passing through the blower compartment. Seals supplied in this kit must be installed per the instructions provided. Follow all procedures outlined in these instructions.
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
DO NOT use cement to join polypropylene venting systems. Follow the polypropylene venting system manufacturer
s instructions for installing polypropylene venting systems.
NOTE: The rubber coupling that attaches to the vent pipe adapter must be used. The adapter seals the vent pipe to the casing and reduces the strain on the vent elbow attached to the inducer.
1. Apply the gaskets to the vent pipe and combustion air pipe adapters. If supplied, remove and discard round center “slug” from interior of gasket.
NOTE: The vent pipe adapter can be distinguished from the inlet pipe adapter by the absence of an internal pipe-stopping ring. The vent pipe can pass through the vent pipe adapter; it cannot pass through the inlet pipe adapter.
2. Align the screw holes in the plastic vent pipe adapter with the dimples in the casing.
WARNING
WARNING
See Figure 42.
3. Pilot drill the screw holes for the adapter in the casing and attach the vent pipe adapter to the furnace with sheet metal screws
4. Slide the end of the rubber vent coupling with notches in it over the standoffs on the vent pipe adapter.
5. Insert a length of vent pipe through the coupling into the outlet of the vent elbow.
6. Tighten the clamp around the outlet of the vent elbow. Torque the clamp to 15 lb−in.
NOTICE
The following instructions are for PVC/ABS DWV vent piping, only. DO NOT USE THESE TECHNIQUES FOR POLYPROPYLENE VENT PIPING SYSTEMS. See the polypropylene vent system manufacturer’s instructions for installing polypropylene venting systems.
Install the remaining vent and combustion air pipes as shown below. It is recommended that all pipes be cut, prepared, and preassembled before permanently cementing any joint.
1. Working from furnace to outside, cut pipe to required length(s).
2. Deburr inside and outside of pipe.
3. Chamfer outside edge of pipe for better distribution of primer and cement.
4. Clean and dry all surfaces to be joined.
5. Check dry fit of pipe and mark insertion depth on pipe.
6. Insert the vent pipe into the vent elbow.
7. Torque clamp on vent elbow 15 lb−in.
8. Torque clamp on vent coupling 15 lb−in.
9. Insert the combustion air pipe into the adapter.
10. Pilot drill a screw hole through the adapter into the combustion air pipe and secure the pipe to the adapter with sheet metal screws. DO NOT DRILL INTO POLYPROPYLENE VENT PIPES. Use an optional accessory vent coupling, if needed.
11. Seal around the combustion air pipe with silicone or foil tape. SILICONE SEALERS MAY NOT BE APPROPRIATE FOR POLYPROPYLENE VENT SYSTEMS. SEE POLYPROPYLENE VENT SYSTEM MANUFACTRUER’S INSTRUCTIONS.
12. After pipes have been cut and preassembled, apply generous layer of cement primer to pipe fitting socket and end of pipe to insertion mark. Quickly apply approved cement to end of pipe and fitting socket (over primer). Apply cement in a light, uniform coat on inside of socket to prevent buildup of excess cement. Apply second coat. DO NOT CEMENT POLYPROPYLENE FITTINGS.
13. While cement is still wet, twist pipe into socket with 1/4in. turn. Be sure pipe is fully inserted into fitting socket.
14. Wipe excess cement from joint. A continuous bead of cement will be visible around perimeter of a properly made joint.
15. Handle pipe joints carefully until cement sets.
16. Horizontal portions of the venting system shall be supported to prevent sagging. Space combustion air piping and vent piping hangars as shown in the table below. Support pipes using perforated metal hanging strap or commercially available hangars or straps designed to support plastic pipe.
48 440 01 4105 00
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Hangar Spacing
Material
PVC Sch
40
CPVC
ABS
Polyprop
ylene
SDR 21
& 26
1 ½in.
(38mm)
(762mm)
!
(51mm)
36in.
(914mm)
36in.
(914mm)
36in.
(914mm)
30in.
CAUTION
2in.
Pipe Diameter
2 ½in.
(64mm)
42in.
(1067mm)
42in.
(1067mm)
42in.
(1067mm)
40in.
(1000mm)
36in.
(914mm)
3in.
(76mm)
4in.
(102mm)
48in.
(1219mm)
48in.
(1219mm)
48in.
(1219mm)
42in.
(1067mm)
FURNACE RELIABILITY HAZARD
Failure to follow this caution may result in nuisance short cycling, frozen vent termination, and/or no heat.
Slope the vent and combustion air piping downward towards furnace at a minimum of 1/4in. per linear ft. of pipe.
17. Slope the vent and combustion air piping and downward towards furnace. A minimum slope of at least 1/4 in. per linear ft.(1 in. per 4 ft.) with no sags between hangers is required. See Caution Box below.
18. Complete the vent and combustion air pipe installation by connecting to the concentric vent or by installing the required termination elbows as shown in Figure 49 and Figure 50, Alberta Figure 46 and Figure 48. For ventilated combustion air terminations, refer to Figure 50, Alberta Figure 46 and Figure 48.
19. Use appropriate methods to seal openings where combustion air pipe and vent pipe pass through roof or sidewall.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
DO NOT use cement to join polypropylene venting systems. Follow the polypropylene venting system manufacturer’s instructions for installing polypropylene venting systems.
Optional Installation of the Vent Pipe
NOTE: DO NOT USE THIS TECHNIQUE FOR
POLYPROPYLENE VENTING SYSTEMS. This option provides a disconnect point for the vent pipe. The
vent pipe must be cemented to the plastic vent pipe adapter to maintain a sealed vestibule. See Figure 43 and Figure 44
1. Insert a length of vent pipe through the casing into the outlet of the vent elbow.
2. Slide the plastic vent pipe adapter over the length of the vent pipe down to the furnace casing. Mark the pipe where it is flush with the outlet of the adapter.
3. Remove the pipe from the furnace and the adapter and cut off any excess pipe.
4. Clean and prime the end of the pipe that is flush with the vent adapter with a primer that is appropriate for the type of pipe being used.
5. Reinsert the pipe through the casing into the vent elbow.
6. Tighten the clamp around the outlet of the vent elbow. Torque the clamp to 15 lb−in.
7. Apply cement to the end of the pipe and to the inside of the plastic vent adapter.
8. Slide the adapter over the vent pipe and align the screw holes in the adapter with the dimples in the furnace casing.
9. Pilot drill 1/8−in. screw holes for the adapter in the casing and secure the adapter to the furnace with sheet metal screws.
10. Loosen the clamps on the rubber vent coupling.
11. Slide the end of the coupling with notches in it over the standoffs in the vent pipe adapter.
12. Tighten the clamp of the coupling over the vent pipe adapter. Torque the lower clamp around the vent pipe adapter to 15 lb−in.
13. Pilot drill a 1/8in. hole in the combustion air pipe adapter.
14. Complete the vent and combustion air pipe as shown in “Install the Vent and Combustion Air Pipe”
NOTICE
FOR POLYPROPYLENE VENTING SYSTEMS
When using polypropylene venting systems, all venting materials used, including the vent terminations, must be from the same manufacturer.
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
DO NOT use cement to join polypropylene venting systems. Follow the polypropylene venting system manufacturer’s instructions for installing polypropylene venting systems.
Figure 59 Combustion Air Pipe
(NON-DIRECT VENT FOR ALL MODELS EXCEPT MODULATING UNLESS
WARNING
12" (256mm) minimum to 60”(1524 mm) or 1 additional elbow maximum
CASING SIDE OR TOP ATTACHMENT
COMBUSTION AIR PIPE
INSTALLED IN ATTIC OR CRAWL SPACE)
A13406
440 01 4105 00 49
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Installing the Vent Termination
Roof Terminations
A roof termination of any type will require a 4-in. (102 mm) flashing for a 2in. (50 mm ND) concentric vent or a 5−in. diameter (127 mm) flashing for a 3-in. (80 mm ND) concentric vent kit. For two-pipe or single pipe vent systems, a flashing for each pipe of the required diameter will be necessary.
It is recommended that the flashing be installed by a roofer or competent professional prior to installing the concentric vent. The terminations can be installed on a flat or pitched roof.
Concentric Vent
Single or multiple concentric vent must be installed as shown in Figure 49. Maintain the required separation distance between vents or pairs of vents as shown in Figure 49 and all clearance shown in Figure 62.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
DO NOT use cement to join polypropylene venting systems. Follow the polypropylene venting system manufacturer’s instructions for installing polypropylene venting systems.
NOTE: Follow the instructions of the vent terminal manufacturer. These instructions are provided as a reference only.
Cut one 4−in. (102 mm) diameter hole for 2−in. (50 mm ND) kit, or one 5in. (127 mm) diameter hole for 3in. (80 mm ND) kit in the desired location.
Loosely assemble concentric vent/combustion air termination components together using instructions in kit.
Slide assembled kit with rain shield REMOVED through hole in wall or roof flashing.
NOTE: Do not allow insulation or other materials to accumulate inside of pipe assembly when installing it through hole.
Disassemble loose pipe fittings. Clean and cement using same procedures as used for system piping. DO NOT CEMENT POLYPROPYLENE FITTINGS.
TwoPipe and Single−Pipe Terminations
Single and two pipe vent must be installed as shown in Figure 49 and Figure 50. Maintain the required separation distance between vents or pairs of vents as shown in Figure 49 and Figure 50 and all clearance shown in Figure 62 or Figure 63.
NOTICE
RECOMMENDED SUPPORT FOR VENT TERMINA­TIONS
It is recommended that rooftop vent terminations in excess of 36 inches (1.0 M) in vertical length be supported by EITHER the Direct Vent Termination Kit shown in Table 12 or by field-supplied brackets or supports fastened to the structure.
Cut the required number of holes in the roof or sidewall for vent and (when used) combustion air pipes. Sidewall holes for two-pipe vent terminations should be side-by-side, allowing space between the pipes for the elbows to fit on the pipes.
50 440 01 4105 00
Specifications subject to change without notice.
Holes in the roof for direct−vent (two−pipe) two pipe terminations should be spaced no more than 18in. (457 mm) apart to help avoid vent gas recirculation into combustion air intake.
Termination elbows will be installed after the vent and (if used) combustion air pipe is installed.
Sidewall Terminations
Concentric Vent
NOTE: Follow the instructions of the vent terminal
manufacturer. These instructions are provided as a reference, only.
Determine an appropriate location for termination kit using the guidelines provided in section “Locating The Vent Termination”
in this instruction.
1. Cut one 4in. diameter hole for 2in. kit, or one 5−in. diameter hole for 3−in. kit.
2. Loosely assemble concentric vent/combustion air termination components together using instructions in kit.
3. Slide assembled kit with rain shield REMOVED through hole.
NOTE: Do not allow insulation or other materials to accumulate inside of pipe assembly when installing it through hole.
4. Locate assembly through sidewall with rain shield positioned no more than 1in. (25 mm) from wall as shown in Figure 49.
5. Disassemble loose pipe fittings. Clean and cement using same procedures as used for system piping. DO NOT CEMENT POLYPROPYLENE FITTINGS.
Two-Pipe and Single-Pipe Vent Termination
NOTE: Follow the instructions of the vent terminal
manufacturer. These instructions are provided as a reference, only.
NOTICE
RECOMMENDED SUPPORT FOR VENT TERMINATIONS
It is recommended that sidewall vent terminations in excess of 24 inches (0.6 M) in vertical length be sup­ported by EITHER the Direct Vent Termination Kit in Table 12 or by field-supplied brackets or supports fastened to the structure.
Determine an appropriate location for termination kit using the guidelines provided in section “Locating The Vent Termination”
in this instruction.
1. Cut two holes, one for each pipe, of appropriate size for pipe size being used.
2. Loosely install elbow in bracket (if used) and place assembly on combustion−air pipe.
3. Install bracket as shown in Figure 46 and Figure 48.
NOTE: For applications using vent pipe option indicated by dashed lines in Figure 49 and Figure 50, rotate vent elbow 90 from position.
4. Disassemble loose pipe fittings. Clean and cement using same procedures as used for system piping. DO NOT CEMENT POLYPROPYLENE FITTINGS.
(Direct Vent / Two-Pipe System ONLY)
When two or more furnaces are vented near each other, two vent terminations may be installed as shown in Figure 49, but next vent termination, or pair of vent terminations, must be at least 36in. (914 mm) away from first two terminations. It is
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
important that vent terminations be made as shown in
Figure 49 to avoid recirculation of gases.
Inducer Outlet Restrictor (PSC models only)
To improve efficiency and operation of 40,000 BTUH input models on very short vent systems, an inducer outlet restrictor is required to be installed on the outlet of the inducer assembly. The outlet restrictor is shipped in the loose parts bag.
To determine if the outlet restrictor is required, see Table 14
Figure 60 Crawl Space Vent Termination
Ventilated Combustion Air intake pipe
Pipe hangar
NOTE: Failure to use an outlet choke when required may result in flame disturbance or flame sense lockout.
To install the outlet restrictor:
1. Remove the vent elbow from the inducer outlet
2. Align the lock tabs on the outlet restrictor with the slots on inside outlet of the inducer assembly.
3. Snap the outlet restrictor in place.
4. Re-install the vent elbow
5. Torque vent elbow clamp 15 lb−in.
3” (76 mm)
Ventilated Combustion Air intake termination in crawl
space
Figure 61 Attic Vent Termination
12” (305 mm)
CRAWL SPACE
Ventilated Combustion Air intake pipe
Vent through roof flashing
12” (305 mm) min. above higest level of insulation
ATTIC
440 01 4105 00 51
Specifications subject to change without notice.
L11F016
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 62 Direct Vent Termination Clearance
V
V
252465−2
NOTE: The following is based upon National codes for gas appliances, and is provided as a reference. Refer to Local codes which may supersede these standards and/or recommendations.
Item Clearance Description
Clearance above grade, veranda, porch, deck, balcony or
A
B Clearance to a window or door that may be opened
C Clearance to a permanently closed window
Vertical clearance to a ventilated soffit located above the
terminal within a horizontal distance of 2 feet (61 cm) from
D
E Clearance to an unventilated soffit F Clearance to an outside corner G Clearance to an inside corner
Clearance to each side of the centerline extended above
H
K Clearance to a mechanical air supply inlet 6 ft. (1.8 M) 3ft. (.9 M)
L Clearance under a veranda, porch, deck, or balcony
M
N
0 Clearance from a plumbing vent stack 3 ft. (.9 M) 3 ft. (.9 M)
P
u greater than, w greater than or equal to, t less than, v less than or equal to
electrical meter or gas service regulator assembly
I Clearance to service regulator vent outlet 3ft. (.9 M) See Note 4.
Clearance to non—mechanical air supply inlet to building or
J
the combustion air inlet to any other appliance
Clearance to each side of the centerline extended above or
below vent terminal of the furnace to a dryer or water heater
vent, or other appliance's vent intake or exhaust
Furnace combustion air intake clearance to a water heater
vent, dryer vent or other types of appliance exhausts.
Clearance above paved sidewalk or paved driveway located
anticipated snow level
the centerline of the terminal
on public property
12 in. (305 mm) for appliances >10,000 Btuh (3 kW)
36 in. (914 mm) for appliances >100,000 Btuh (30 kW)
For clearances not specified in ANSI Z223.1/NFPA 54 or CAN/CSA B149.1, clearances shall be in accordance with local
12 in. (305 mm) for appliances >10,000 Btuh(3 kW)
36 in. (914 mm) for appliances >100,000 Btuh (30 kW)
Permitted only if veranda, porch, deck, or balcony is fully open on a
Vent shall not terminate above a sidewalk or paved driveway that is
located between two single family dwellings and serves both
Canadian Installations
(per CAN/CSA B149.1)
12 in. (305 mm)
18 in. (457 mm) above roof surface.
and </=100,000 Btuh ( 30 kW),
installation codes and the requirements of the gas supplier and the manufacturer's installation instructions.
3 ft. (.9 M) within 15 ft. (4.6 M)
above the meter/regulator assembly.
and </= 100,000 Btuh ( 30 kW),
12 in. (305 mm).
minimum of two sides beneath the floor.
12 in. (305 mm) 12 in. (305 mm)
3 ft. (.9 M) 3 ft. (.9 M)
7 ft. (2.1 M)
dwellings.
Notes:
1. In accordance with the current CAN/CSA B149.1, Natural Gas and Propane Installation Code.
2. In accordance with the current ANSI Z223.1/NFPA 54, National Fuel Gas Code
3. NOTE: This table is based upon National codes for gas appliances, and are provided as a reference.
Refer to Local codes which may supersede these standards and/or recommendations.
4. For clearances not specified in ANSI Z223.1/NFPA 54 or CAN/CSA B 149.1, clearances shall be in accordance with local installation codes and the requirements of the gas supplier and the manufacturer's installation instructions.
5. When locating vent terminations, consideration must be given to prevailing winds, location, and other conditions which may cause recirculation of the combustion products of adjacent vents. Recirculation can cause poor combustion, inlet condensate problems, vent termination icing, and/or accelerated corrosion of the heat exchangers.
6. Design and position vent outlets to avoid ice buildup on and moisture damage to surrounding surfaces.
7. The vent for this appliance shall not terminate:
a. Near soffit vents of crawl space vents or other areas where condensate or vapor could create a nuisance or hazard or property damage; or b. Where condensate vapor could cause damage or could be detrimental to the operation of regulators, relief valves, or other equipment.
8. Avoid venting under a deck or large overhang. Recirculation could occur and cause performance or system problems. Ice buildup may occur.
52 440 01 4105 00
Specifications subject to change without notice.
(1 )
(per ANSI Z223.1/NFPA 54)
9 in. (229 mm) for appliances >10,000 Btuh (3 kW)
and </= 50,000 Btuh ( 15 kW),
12 in. (305 mm) for appliances >50,000 Btuh (15kW)
Manufacturer's Recommendation: See Notes 38.
3 ft. (.9 M) within 15 ft. (4.6 M)
above the meter/regulator assembly.
9 in. (9 mm) for appliances >10,000 Btuh (3 kW)
and </= 50,000 Btuh (15 kW),
12 in.(305 mm) for appliances >50,000 Btuh (15kW)
Manufacturer's Recommendation: See Notes 38.
Manufacturer's Recommendation: See Notes 38.
U.S. Installations
12 in. (305 mm)
See Note 4.
See Note 4.
(2 )
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Figure 63 Other than Direct Vent Clearance Ventilated Combustion Air Option
V
V
252465−2
NOTE: The following is based upon National codes for gas appliances, and is provided as a reference. Refer to Local codes which may supersede these standards and/or recommendations.
Item
Clearance above grade, veranda, porch, deck, balcony or
A
B Clearance to a window or door that may be opened
C Clearance to a permanently closed window
Vertical clearance to a ventilated soffit located above the
terminal within a horizontal distance of 2 feet (61 cm) from
D
E Clearance to an unventilated soffit F Clearance to an outside corner
G Clearance to an inside corner
Clearance to each side of the centerline extended above
H
I Clearance to service regulator vent outlet 3ft. (.9 M) See Note 4.
J
K Clearance to a mechanical air supply inlet 6 ft. (1.8 M) 3ft. (.9 M)
L Clearance under a veranda, porch, deck, or balcony
M
N
0 Clearance from a plumbing vent stack 3 ft. (.9 M) 3 ft. (.9 M)
P
u greater than, w greater than or equal to, t less than, v less than or equal to
electrical meter or gas service regulator assembly
Clearance to non—mechanical air supply inlet to building or
the combustion air inlet to any other appliance
Clearance to each side of the centerline extended above or
below vent terminal of the furnace to a dryer or water heater
vent, or other appliance's direct vent intake or exhaust
Clearance above paved sidewalk or paved driveway located
Clearance Description
anticipated snow level
the centerline of the terminal
Clearance to a moisture exhaust duct
(dryer vent, spa exhaust, etc.)
on public property
12 in. (305 mm) for appliances >10,000 Btuh (3 kW)
36 in. (914 mm) for appliances >100,000 Btuh (30 kW)
For clearances not specified in ANSI Z223.1/NFPA 54 or CAN/CSA B149.1, clearances shall be in accordance with local
12 in. (305 mm) for appliances >10,000 Btuh(3 kW)
36 in. (914 mm) for appliances >100,000 Btuh (30 kW)
Permitted only if veranda, porch, deck, or balcony is fully open
Vent shall not terminate above a sidewalk or paved driveway
that is located between two singlefamily dwellings and serves
Canadian Installations
(per CAN/CSA B149.1)
12 in. (305 mm)
18 in. (457 mm) above roof surface.
and </=100,000 Btuh ( 30 kW),
installation codes and the requirements of the gas supplier and the manufacturer's installation instructions.
3 ft. (.9 M) within 15 ft. (4.6 M)
above the meter/regulator assembly.
and </= 100,000 Btuh ( 30 kW),
12 in. (305 mm).
on a minimum of two sides beneath the floor.
12 in. (305 mm) 12 in. (305 mm)
12 in. (305 mm) See Note 4. 12 in. (305 mm) See Note 4.
7 ft. (2.1 M)
both dwellings.
(1 )
Manufacturer's Recommendation: See Notes 38.
(per ANSI Z223.1/NFPA 54)
4ft. (1.2M) below or to the side of the opening,
1 ft (.3M) above the opening.
Manufacturer's Recommendation: See Note 8.
3 ft. (.9 M) within 15 ft. (4.6 M)
above the meter/regulator assembly.
4ft. (1.2M) below or to the side of the opening,
1 ft (.3M) above the opening.
Manufacturer's Recommendation: See Note 8
Manufacturer's Recommendation: See Notes 38.
U.S. Installations
12 in. (305 mm)
See Note 4.
7ft. (2.1M)
Notes:
1. In accordance with the current CAN/CSA B149.1, Natural Gas and Propane Installation Code.
2. In accordance with the current ANSI Z223.1/NFPA 54, National Fuel Gas Code
3. NOTE: This table is based upon National codes for gas appliances, and are provided as a reference.
Refer to Local codes which may supersede these standards and/or recommendations.
4. For clearances not specified in ANSI Z223.1/NFPA 54 or CAN/CSA B 149.1, clearances shall be in accordance with local installation codes and the requirements of the gas supplier and the manufacturer's installation instructions.
5. When locating vent terminations, consideration must be given to prevailing winds, location, and other conditions which may cause recirculation of the combustion products of adjacent vents. Recirculation can cause poor combustion, inlet condensation problems, vent termination icing, and/or accelerated corrosion of the heat exchangers.
6. Design and position vent outlets to avoid ice buildup on and moisture damage to surrounding surfaces.
7. The vent for this appliance shall not terminate:
a. Near soffit vents of crawl space vents or other areas where condensate or vapor could create a nuisance or hazard or property damage; or b. Where condensate vapor could cause damage or could be detrimental to the operation of regulators, relief valves, or other equipment.
8. These National standards apply to all nondirectvent gas appliances. Contact Local code officials for additional requirements and/or exclusions.
440 01 4105 00 53
Specifications subject to change without notice.
(2 )
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Table 14 MAXIMUM EQUIVALENT VENT LENGTH - Feet / Meters
Note: Maximum Equivalent Vent Length (MEVL) does NOT include elbows or terminations
Use Table 15 DEDUCTIONS FROM MEVL to determine allowable vent length for each application.
Unit Size 26,000*
Pipe Dia.
(in)
02000 70 200 20 85 185 20013000 65 190 30014000 60 175 70 160 40014500 55 160 45015000 55 160 60 145 80 165 145 160 50016000 50 145 55 130 75 140 155 35 100 135 150 140 155 155 35 80 60017000 45 135
Altitude (feet)
70018000 40 120 40 110 65 120 135 120 125 80019000 35 110
900110000 30 95 25 85 N/A 55 105 115 20 75 100 105 45 100 115 30 115 10 15
Unit Size 26,000*
Pipe Dia.
(mm)
0610 21 61 6 26 57
611914 20 58
9151219 18 53 22 49 12201370 17 49 13711524 17 49 19 45 24 51 45 50 15251829 15 44 17 41 82 43 47 11 31 42 46 43 48 48 11 25 18302134 14 41
Altitude (meters)
21352438 12 34 12 34 20 37 42 36 39 24392743 11 34 27443048 9 29 8 26 N/A 17 33 36 7 24 31 33 14 34 36 12 35 3.5 5
1 ½ 2 1 ½ 2 2 ½ 1 ½ 2 2 ½ 3 1 ½ 2 2 ½ 3 4 2 2 ½ 3 4 2 ½ 3 4 2 ½ 3 4
38 51 38 51 64 38 5 64 76 38 51 64 76 102 51 64 76 102 64 76 102 64 76 102
40,000
Outlet choke
required under
10 ft. TEVL
80 175 95 165 185
15
65 155 85
10
45 120
5
30 95 5 60 115 125 25 80 110 115 50 115 125 40 120 15 30
N/A
40,000
Outlet choke
required under
10 ft. TEVL
24 53 29 51 57
4.5
20 47 26
3
15 37
1.5
10 30 1.5 19 35 38 8 26 34 36 15 36 39 13 38 5 10
N/A
60,000 80,000 100,000 120,000 140,000
100 175 200 15 50 130 175 200 20 80 175 200
20
90 155 175 115 155 175
15
10
6.5
5
3
150
70 130 145
60,000 80,000 100,000 120,000 140,000
31 54 61 2 16 40 54 61 6 25 54 61
27 48 54 36 48 53
46
22 40 44
10
170
N/A
Single Stage - Meters/mm
3
52
N/A
125 165 185
45
40 110
30 90
38 51 57
15
13 34
10 27
15 75
150 165
10
125 140 60 135 145 50 140 30 65
N/A
5 23
46 51
3
39 42 19 41 45 16 43 9 20
N/A
165 185 70 175
175 5 65 165 120
155
70 170
150 165 45 100
65
55 125 135 45 130 25 45
51 57 21 54
54 1.5 20 51 36
48
22 52
46 51 14 31
21
18 38 42 14 40 7 15
75 185 5 65 155
10
160
60
N/A
23 57 1.5 21 48
3
50
19
N/A
N/A
N/A
* Not all families have these models
Table 15 DEDUCTIONS FROM MAXIMUM EQUIVALENT VENT LENGTH - Feet (Meters)
Pipe Diameter (in): 11/2 2 21/2 3 4
Mitered 90º Elbow 8 (2.4) 8 (2.4) 8 (2.4) 8 (2.4) 8 (2.4)
Medium Radius 90º Elbow 5 (1.5) 5 (1.5) 5 (1.5) 5 (1.5) 5 (1.5)
Long Radius 90º Elbow 3 (0.9) 3 (0.9) 3 (0.9) 3 (0.9) 3 (0.9)
Mitered 45º Elbow 4 (1.2) 4 (1.2) 4 (1.2) 4 (1.2) 4 (1.2)
Medium Radius 45º Elbow 2.5 (0.8) 2.5 (0.8) 2.5 (0.8) 2.5 (0.8) 2.5 (0.8)
Long Radius 45º Elbow 1.5 (0.5) 1.5 (0.5) 1.5 (0.5) 1.5 (0.5) 1.5 (0.5)
Tee 16 (4.9) 16 (4.9) 16 (4.9) 16 (4.9) 16 (4.9)
Concentric Vent Termination NA 0 (0.0) NA 0 (0.0) NA
Standard Vent Termination 0 (0.0) 0 (0.0) 0 (0.0) 0 (0.0) 0 (0.0)
NOTES:
1. Use only the smallest diameter pipe possible for venting. Over−sizing may cause flame disturbance or excessive vent terminal icing or freeze−up.
2. NA = Not allowed. Pressure switch will not close, or flame disturbance may result.
3. Total equivalent vent lengths under 10 ft. for 40k BTUH furnaces from 0 to 2000 ft (0 to 610m) above sea level require use of an inducer outlet choke. Failure to use an outlet choke may result in flame disturbance or flame sense lockout.
4. Not all furnace families include 140,000 BTUH input models.
5. Vent sizing for Canadian installation over 4500 ft. (1370 m) above sea level are subject to acceptance by local authorities having jurisdiction.
6. Size both the combustion air and vent pipe independently, then use the larger size for both pipes.
7. Assume two 45° degree elbows equal one 90° degree elbow. Wide radius elbows are desirable and may be required in some cases.
8. Elbow and pipe sections within the furnace casing and at the vent termination should not be included in vent length or elbow count.
9. The minimum pipe length is 5 (1.5) linear feet (meters) for all applications.
10. Use 3−in (76 mm) diameter vent termination kit for installations requiring a 4−in (102 mm) diameter pipe.
Figure 64 Elbows Configurations
Figure 65 Vent Terminal Configurations
140
60
50 110
42
18
16 33
STANDARD 2−IN., 3IN. OR OPTIONAL 4IN. TERMINATION
CONCENTRIC
LONG MEDIUM MITERED
L11F082
54 440 01 4105 00
Specifications subject to change without notice.
L11F083
A13110
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Venting System Length Calculations
The Total Equivalent Vent Length for EACH combustion air or vent pipe equals the length of the venting system, plus the equivalent length of elbows used in the venting system from Table 15. Standard vent terminations or factory accessory concentric vent terminations count for zero deduction. See vent system manufacturer’s data for equivalent lengths of flexible vent pipe or other termination systems. DO NOT ASSUME that one foot of flexible vent pipe equals one foot of straight PVC/ABS DWV vent pipe. Compare the Total Equivalent Vent Length to the Maximum Equivalent Vent Lengths in Table 14.
Example 1
A direct-vent 60,000 BTUH furnace installed at 2100 ft. (640M). Venting system includes FOR EACH PIPE 50 feet (15 M) of vent pipe, 45 feet (14 M) of combustion air inlet pipe, (3) 90º long-radius elbows, (2) 45º long-radius elbows, and a factory accessory concentric vent kit. Can this application use 2-in. (50 mm ND) PVC/ABS DWV vent piping?
Measure the required linear length of air inlet and vent pipe; insert the longest of the two here
Add equiv length of (3) 90º long-radius elbows (use the highest number of elbows for either the vent or inlet pipe)
Add equiv length of (2) 45º long-radius elbows (use the highest number of elbows for either the vent or inlet pipe)
Add equiv length of factory concentric vent term 0 ft. From Table 15
Add correction for flexible vent pipe, if any 0 ft.
Total Equivalent Vent Length (TEVL)
Maximum Equivalent Vent Length (MEVL)
Is TEVL less than MEVL? YES Therefore, 2” pipe MAY be used
3 x
2 x
3 ft
(0.9 M)
1.5 ft
(0.5 M)
=
=
50 feet
(15 M)
9 ft.
(2.7 M)
3 ft
(0.9 M)
62 feet
(18.6 M)
95 feet
(28 M)
Use length of the longer of the vent or air inlet piping system
From Table 15
From Table 15
From Vent Manufacturer’s instructions; zero for PVC/ABS DWV
Add all of the above lines
For 2” pipe from Table 14
Example 2
A direct-vent 60,000 BTUH furnace installed at 2100 ft. (640M). Venting system includes FOR EACH PIPE 50 feet (15 M) of vent pipe, 45 feet (14 M) of combustion air inlet pipe, (3) 90º long-radius elbows, and a polypropylene concentric vent kit. Also includes 20 feet (6.1 M) of flexible polypropylene vent pipe, included within the 50 feet (15 M) of vent pipe.
Assume that one meter of flexible 60mm or 80mm polypropylene pipe equals1.8 meters of PVC/ABS pipe. VERIFY FROM VENT MANUFACTURER’S INSTRUCTIONS.
Can this application use 60mm (o.d.) polypropylene vent piping? If not, what size piping can be used?
=
=
=
50 feet
(15 M)
9 ft.
(2.7 M)
0 ft.
(0 M)
27 ft.
(8.2 M)
36 ft.
(11 M)
122 feet
(37 M)
95 feet
(29 M)
165 ft.
(50 M)
Measure the required linear length of air inlet and vent pipe; insert the longest of the two here
Add equiv length of (3) 90º long-radius elbows (use the highest number of elbows for either the vent or inlet pipe)
Add equiv length of (0) 45º long-radius elbows (use the highest number of elbows for either the vent or inlet pipe)
Add equiv length of concentric vent term 9 x
Add correction for flexible vent pipe, if any 1.8 x
Total Equivalent Vent Length (TEVL)
Maximum Equivalent Vent Length (MEVL)
Is TEVL less than MEVL? NO
Maximum Equivalent Vent Length (MEVL)
Is TEVL less than MEVL? YES Therefore, 80mm pipe MAY be used
3 x
0 x =
3 ft
(0.9 M)
3 ft
(0.9 M)
20 ft
(6.1 M)
Use length of the longer of the vent or air inlet piping system
From Vent Manufacturer’s instructions
From Vent Manufacturer’s instructions
From Vent Manufacturer’s instructions
From Vent Manufacturer’s instructions
Add all of the above lines
For 2” pipe from Table 14
Therefore, 60mm pipe may NOT be used; try 80mm
For 3” pipe from Table 14
440 01 4105 00 55
Specifications subject to change without notice.
INSTALLATION INSTRUCTIONS Gas Furnace: N9MSE
Table 16 Maximum Allowable Exposed Vent Length Tables
Maximum Allowable Exposed Vent Length in Unconditioned Space (Feet)
Unit Size
Pipe Dia.
in.
Winter
Design
Temp
°F
Winter
Design
Temp
°F
Winter
Design
Temp
°F
Winter
Design
Temp
°F
* Not all families have these models
20
0 20 40
Unit Size
Pipe Dia.
in.
20
0 20 40
Unit Size 100,000 BTUH
Pipe Dia.
in.
20 20 50 40 35 20 80 95 80 20 80 105 90
0 20 20 15 10 20 55 45 35 20 65 55 45 20 15 10 5 20 35 30 20 20 45 35 25 40 10 5 20 25 20 10 20 30 25 15
Unit Size Pipe Dia.
in.
20 10 50 40 10 75 95 10 75 105 5 55 50 5 65 105 5 65 125
0 10 20 15 10 55 45 10 65 50 5 25 15 5 65 50 5 65 60
-20 10 10 10 35 25 10 45 30 5 10 5 5 45 30 5 50 40
-40 10 5 10 25 15 10 30 20 5 5 5 30 20 5 35 25
Uninsulated 3/8in. Insulation 1/2in. Insulation
2 2 2 1 ½ 2 2 ½ 1 ½ 2 2 ½ 1 ½ 2 2 ½
20 20 50 45 60 50
5 5 25 20 30 25
Uninsulated 3/8in. Insulation 1/2in. Insulation
1 ½ 2 2 ½ 3 1 ½ 2 2 ½ 3 1 ½ 2 2 ½ 3 1 ½ 2 2 ½ 3 4 1 ½ 2 2 ½ 3 4 1 ½ 2 2 ½ 3 4
20 30 30 25 20 75 65 60 20 85 75 65 15 15 10 10 20 40 30 25 20 45 40 30 10 5 20 25 20 15 20 30 25 20
5 20 15 15 10 20 20 15 10
2 2 ½ 3 4 2 2 ½ 3 4 2 2 ½ 3 4
Uninsulated 3/8in. Insulation 1/2in. Insulation Uninsulated 3/8in. Insulation 1/2in. Insulation
2 ½ 3 4 2 ½ 3 4 2 ½ 3 4 2 ½ 3 4 2 ½ 3 4 2 ½ 3 4
Maximum Allowable Exposed Vent Length in Unconditioned Space (Metric)
Unit Size
Uninsulated 3/8in. Insulation 1/2in. Insulation Uninsulated 3/8in. Insulation 1/2in. Insulation
Pipe Dia.
mm
Winter
Design
Temp
°C
Winter
Design
Temp °C
Winter
Design
Temp
°C
Winter
Design
Temp
°C
* Not all families have these models
-7 6.1 6.1 15.2 13.7 18.3 15.2
-18 1.5 1.5 7.6 6.1 9.1 7.6
-29 4.6 3.0 6.1 4.6
-40 3.0 1.5 4.6 3.0
Unit Size 60,000 BTUH 80,000 BTUH
Pipe Dia.
mm
-7 6.1 9.1 9.1 7.6 6.1 22.9 19.8 18.3 6.1 25.9 22.9 19.8 4.6 12.2 12.2 10.7 9.1 4.6 15.2 27.4 22.9 19.8 4.6 15.2 21.3 21.3 21.3
-18 4.6 4.6 3.0 3.0 6.1 12.2 9.1 7.6 6.1 13.7 12.2 9.1 4.6 6.1 4.6 3.0 1.5 4.6 15.2 13.7 10.7 9.1 4.6 15.2 15.2 12.2 10.7
-29 3.0 1.5 6.1 7.6 6.1 4.6 6.1 9.1 7.6 6.1 4.6 3.0 1.5 4.6 10.7 9.1 6.1 4.6 4.6 12.2 9.1 7.6 4.6
-40 1.5 6.1 4.6 4.6 3.0 6.1 6.1 4.6 3.0 3.0 1.5 4.6 7.6 6.1 4.6 1.5 4.6 9.1 7.6 6.1 3.0
Unit Size 100,000 BTUH
Pipe Dia.
mm
-7 6.1 15.2 12.2 10.7 6.1 24.4 28.9 24.4 6.1 24.4 32.0 27.4
-18 6.1 6.1 4.6 3.0 6.1 16.8 13.7 10.7 6.1 19.8 16.7 13.7
-29 4.6 3.0 1.5 6.1 10.7 9.1 6.1 6.1 13.7 10.7 7.6
-40 3.0 1.5 6.1 7.6 6.1 3.0 6.1 9.1 7.6 4.6
Unit Size 120,000 BTUH 140,000* BTUH
Pipe Dia.
mm
-7 3.0 15.2 12.2 3.0 22.9 28.9 3.0 22.9 32.0 1.5 16.7 15.2 1.5 19.8 32.0 1.5 19.8 38.1
-18 3.0 6.1 4.6 3.0 16.8 13.7 3.0 19.8 15.2 1.5 7.6 4.6 1.5 19.8 15.2 1.5 19.8 18.3
-29 3.0 3.0 3.0 10.7 7.6 3.0 13.7 9.1 1.5 3.0 1.5 1.5 13.7 9.1 1.5 15.2 12.2 40 3.0 1.5 3.0 7.6 4.6 3.0 9.1 6.1 1.5 1.5 1.5 9.1 6.1 1.5 35 7.6
38 51 38 51 38 51 38 51 64 38 51 64 38 51 64
Uninsulated 3/8in. Insulation 1/2in. Insulation Uninsulated 3/8in. Insulation 1/2in. Insulation
38 51 64 76 38 51 64 76 38 51 64 76 38 51 64 76 102 38 51 64 76 102 38 51 64 76 102
51 64 76 102 51 64 76 102 51 64 76 102
Uninsulated 3/8in. Insulation 1/2in. Insulation Uninsulated 3/8in. Insulation 1/2in. Insulation
64 76 102 64 76 102 64 76 102 64 76 102 64 76 102 64 76 102
26,000* BTUH
15 10 20 15 10 5 15 10
60,000 BTUH
Uninsulated 3/8in. Insulation 1/2in. Insulation
120,000 BTUH 140,000* BTUH
26,000* BTUH
Uninsulated 3/8in. Insulation 1/2in. Insulation
Uninsulated 3/8in. Insulation 1/2in. Insulation
20 20 20 20 50 45 20 60 50 10 5 5 20 25 20 20 30 25 5 20 15 10 20 20 15 15 10 5 15 15 10
Uninsulated 3/8in. Insulation 1/2in. Insulation
15 40 40 35 30 15 50 90 75 65 15 50 70 70 70 15 20 15 10 5 15 50 45 35 30 15 50 50 40 35 15 10 5 15 35 30 20 15 15 40 30 25 15 10 5 15 25 20 15 5 15 30 25 20 10
6.1 6.1 6.1 6.1 15.2 13.7 6.1 18.3 15.2
3.0 1.5 1.5 6.1 7.6 6.1 6.1 9.1 7.6
1.5 6.1 4.6 3.0 6.1 6.1 4.6
40,000* BTUH
80,000 BTUH
40,000* BTUH
4.6 3.0 1.5 4.6 4.6 3.0
Copyright 2015 International Comfort Products
Lewisburg, TN 37091 USA
56 440 01 4105 00
Specifications subject to change without notice.
Loading...