Intermetro MetroMax Q Installation Manual

®
SUPER SLIDE
ASSEMBLY
INSTRUCTIONS
Super Slides must be used with MetroMax Q 24" deep Shelving.
Slides may be used with both Open Grid or Solid Shelf Mats.
1. Construct the shelving unit per
the instructions supplied in the shelving carton.
2. On the shelf to which the slide is to be mounted, remove the shelf mats and two (2) center snakes from the shelf frame (Fig. 1).
Center Snake
Shelf Mat
Shelf Frame
Fig. 1
4. Replace the two center snakes
(Fig. 3).
Fig. 3
5. Replace the shelf mats. If
necessary, adjust the location of the slides so that clips falls between the ribs on the underside of the mat(s).
6. Install tote boxes into slides (Fig. 4).
Super Slide
3. The front of the slide is the open
end. Drop the slide into the shelf frame. The clips must attach to the top wires of the shelf frame (Fig. 2).
Fig. 2
InterMetro Industries Corporation
®
North Washington Street, Wilkes-Barre, PA 18705
For Product Information Call: 1-800-433-2232 Visit Our Web Site: www.metro.com
Fig. 4
Tote Box
ASSEMBLY
INSTRUCTIONS
For MetroMaxQ Super Slide
without notice. Please confirm at time of order.
L01-257
9/96
Loading...