P/N 1073164-EN • REV A • ISS 31MAR16

Installation Guide 1
Contents
Product overview 2
Camera description 4
Installation 7
Built-in heater in the TVB-2405/4405
camera 11
Program 11
Menu trees 17
Specifications 19
Legal and regulatory information 21

2 Installation Guide
Product overview
This is the TruVision High Definition TVI Bullet
Camera Installation Guide for models TVB2402/TVB-4402, TVB-2404/TVB-4404 and TVB2405/TVB-4405. This guide describes a standard
installation.
Package contents
Camera with power
and video output
cables
4 screws and 4
anchors for wall or
ceiling installation
Back box
Screws M4.8 × 18,
4 pcs to attach the
back box

Installation Guide 3
Template
Hex wrench
• Installation guide
• WEEE disposal
sheet
CD
• BNC monitor
output cable
Hole A: for cables routed through the wall
A
Drill Template
1
1
1
2
2
2
2
Screw hole 1: for integrative bracket
Screw hole 2: for conduit back box

4 Installation Guide
Camera description
1. CVBS output
(black)
2. TVI output (grey)
3. Power cable
5. Sun shield
6. Lens
7. Mounting bracket
8. Back box
Note:
Please check the camera output settings before
setting up a system. The TVI video output can be
only connected to a DVR with a TVI signal input.
The CVBS output supports a standard CVBS
monitor (or test monitor), an encoder or a DVR.

Installation Guide 5
For 720P VF bullet cameras, TVB-2402 / TVB-4402,
the CVBS and TVI output can not be used at the
same time. Use the built-in switch to select the
camera video output.
For 1080P VF bullet cameras, such as TVB2404/TVB-4404 and TVB-2405/TVB-4405, the builtin switch is used to enable/disable the WDR feature.
When the WDR feature is enabled, the CVBS
output will be blocked.
Figure 1: TVB-2402 /TVB-4402
Focus
Zoom
Menu button
Switch (Up= CVBS/
Down = TVI)
BNC output

6 Installation Guide
Figure 2: TVB-2404 /TVB-4404
Focus
Zoom
Menu button
Switch (Up= CVBS/
Down = WDR)
BNC output
Figure 3: TVB-2405 /TVB-4405
BNC output
Menu button
Switch (Up= CVBS/
Down = WDR)

Installation Guide 7
Installation
To install the camera:
1. Using the template, place it level against the
mounting surface and mark the position of the
mounting holes.
2. Following all local safety regulations, drill and
prepare the mounting holes.
3. As an optional step, install the back box on the
wall.
Hole A: for cables routed through the wall
A
Drill Template
1
1
1
2
2
2
2
Screw hole 1: for integrative bracket
Screw hole 2: for conduit back box