ICP C9MPD050F12B1, C9MPD075F12A1, C9MPD075F12B1, C9MPD080J16A2, C9MPD080J16B1 Installation Guide

...
INSTALLATION INSTRUCTIONS
For Extension Vent Pipe Replacement on N9MP1, N9MP2, *9MPD,
*9MPT & *9MPV Upflow Gas Furnaces.
* Denotes Brand (T, H or C)
Please read these instructions completely before attempting installation.
Parts List for Plastic Bag
Description Part# Qty. Coupling, Discharge 1002522 1
Clamp, Hose 1013830 2 Gasket, Trap 1013701 1
SMS, #8 X 1/2" Conical 1012537 2 Clamp, 5/8"ID 1012975 2 Clamp, 3/4"ID 1012976 2
Ii Upflow Installations (Dual Certified *9MPD, *9MPT & *9MPV-A2 Models)
i
YellowPlastic Cap
VentPipe
Air
PipeGrommet
Description Part# Qty. Plastic, Bag 1013402 1
Trap, Assembly Plastic 1013676 1
Drain, Vent 1014003 1 Elbow, Street 2" PVC 1013930 1 Pipe, 2" PVC 321147-301 1
Tube, Rubber 1009238 1
Hose, Drain 1/2" 1012695 1 Hose, Drain, 5/8" 1012696 1
Label, Warning Trap 1013872 1 Instructions, Trap 441 06 1036 02 1 Instructions, Installation 441 06 1039 00 1
NOTE: TRAP MUST BE PRIMED BEFORE OPERATION
TOP Venting
CombustionAir
.-Air Intake
Coupling
Representive drawing,
some valves will vary.
DrainLine
PressureSwitch,
Transition
_ PtasticCaPsome Modelshave
one pressureswitch
PressureSwitch Hose, Blower
PressureSwitch, Blower
PressureSwitch Hose,Transition
_eturn Air
25-24-00a
441 06 1039 O0 (4/2002)
Upflow Installations - (Dual Certified*9MPD, *9MPT &*9MPV)(See Figure 1)
NOTE: DO NOT make connections until the hose routing and
lengths have been determined. Remove the condensate trap and drain hoses from the furnace and secure the drain hoses to the
drain stubs on the trap with the hose clamps (position the clamps as shown in Figure 1). Install the condensate trap/hose assembly to
the furnace casing. Hook one side of the "clamp ears" on the drain
stub through the hole in the casing and push the condensate trap into position. Secure with the two screws. Reconnect the drain hoses to the stubs on the vent fitting and the plastic transition and secure with the clamps.
Mount the condensate drain trap in a vertical position to either the left or right side of the furnace using the two screws and gasket that
are provided. If needed, remove the hole plugs from the furnace side panel and relocate to the open set of holes in the opposite side
panel. NOTE: All gaskets and seals must be in place for sealed combus-
tion applications.
Ensure that the vent fitting and the 90 ° street elbow are securely attached to the combustion blower using the clamps.
Plug the upper drain stub on the vent fitting with the yellow plastic cap.
Glue the PVC vent extension pipe to the 90 ° street elbow after checking the fit up. (Follow the procedures outlined in the Joining Pipe and Fittings section of this manual, page 13.) Disregard the instruction label on the PVC vent extension pipe. The orientation of
the supplied PVC vent extension pipe is not critical in the vertical
position. The PVC pipe will extend through the top panel about 21/2". Connect the rubber coupling to the end ofthe PVC extension
pipe using the clamp.
NOTE: There will be some misalignment ofthe PVC pipe inside the furnace. The rubber coupling will straighten outthe misalignment at the vent pipe connection at the top of the furnace.
For left side venting, remove 90 ° street elbow from the vent fitting
by loosening the clamp on the vent fitting. Securely attach vent fit- ting to combustion blower.
NOTE: For left side venting, the vent fitting MUST be installed with the airflow marking arrow pointed toward the vent pipe, with the
drain stub at a 5° to 10 ° downward slope.
Connect the PVC vent extension pipe to the vent fitting. This pipe
has a built-in channel to assist vent condensate disposal.
Align the arrow on the PVC pipe with the airflow marking arrow on
the vent fitting. See label on the PVC pipe for proper installation. This pipe may only be shortened if an elbow is used to connect the
PVC vent extension tube to field-installed vent pipe. Securely at-
tach the PVC vent extension pipe to the vent fitting with the clamp. This configuration allows left side venting from the furnace. If right
side venting is required, the combustion blower must be relocated on the plastic transition box. Loosen the four(4) screws that secure the blower to the transition approximately1/2 ", Rotate the blower
180 ° and secure with the four(4) screws. Note that some combus-
tion blowers have plastic spacers on the mounting legs of the blow- er located atthe 6 and 12 o'clock positions (blower snout to the left
or right) that are required for proper fit up of the blower to the transi- tion. Use caution to not over tighten the screws to prevent stripping out of the plastic mounting holes.
NOTE: For right side venting, the vent fitting MUST be installed with
the airflow marking arrow pointed toward the vent pipe, with the drain stub at a 5 ° to 10 ° downward slope. (See Figure 2)
Plug the upper drain stub on the vent fitting with the yellow plastic
cap. Connect the PVC vent extension pipe to the vent fitting. This pipe
has a built-in channel to assist vent condensate disposal.
Align the arrow on the PVC pipe with the airflow marking arrow on the vent fitting. See label on the PVC pipe for proper installation. This pipe may only be shortened if an elbow is used to connect the
PVC vent extension tube to field-installed vent pipe. Securely at-
tach the PVC vent extension pipe to the vent fitting with the clamp.
For left side mounted condensate trap, connect the 3/4" OD rubber hose with the 90 ° bend to the large drain stub on the condensate trap and secure with a 3/4" clamp.
Route the hose to the drain stub on the bottom ofthe plastic transi- tion box. Cut off excess hose and discard. Connect the hose to the
drain stub on the transition and secure with a 3/4" clamp.
For right side mounted condensate trap, connect the 3/4" OD rub- ber hose with the 90 ° bend to the bottom of the plastic transition box and secure with a 3/4" clamp.
Route the hose to the large drain stub on the condensate trap. Cut off excess hose and discard. Connect the hose to the drain stub on
the condensate trap and secure with a 3/4" clamp. Connect the 5/8" OD rubber hose with the 90 ° bend to the lower
drain stub on the vent fitting and secure with a 5/8" clamp.
441 06 1039 O0 - 2 -
iiiiiiiiiiiiiiiiil;i!¸I!I¸!i¸i!!gilililil¸¸ll_ggilll!_!iiiiiillll!l!l!l!l!l!gl_l_l_l_l_l_l_l_l_l_l_l_l_l_l_l_l_l_l_l_l_l_!
Upflow Installations (Dual Certified *9MPD, *9MPT & *9MPV-A2 Models)
RIGHT Side Venting
Supply Air
Some Models
have one
0
DRAIN SIDE VIEW
Rotate
5° to10°
Vent Drain
angled5° to 10° also.
For left or right side mounted condensate trap, the pressure tap on the condensate trap MUST be connected to the unused pres- sure tap located on the upper right hand corner of the plastic transi-
tion box. Remove the plastic caps from the pressure taps on the
condensate trap and the plastic transition and connect with the 5/16"OD rubber hose. (See Figure 1 and Figure 2)
NOTE: TRAP MUST BE PRIMED BEFORE OPERATION
Representive drawing, some valves will vary.
Vent Fitting
&Clamps
PVCVent ExtensionPipe
TrapConnection
_PointedOUT
Return
Air
'_Clampears"
Preassemble
andinsert
25-24-05
Route the hose to the small drain stub on the condensate trap. Cut off excess hose and discard, Connect the hose to the drain stub on
the trap and secure with a 5/8" clamp.
NOTE: Route hoses to the condensate trap with no kinking or bind-
ing for proper condensate drainage.
int0furnace
441 06 1039 O0 - 3 -
Horizontal Left Installations (Dual Certified *9MPD,*9MPT,*9MPV-A2 Models)
CombustionAir
ipe
Pipe,(optional)
Supply
Air
PVCVent ExtensionPipe
Vent Fitting
&Clamps
Yellow
Plastic 5/8" Hose
Airlntake $omeModete NOTE: TRAP MUST BE PRIMED BEFORE OPERATION
Coul have one
5/16" OD TransitionBox PressureSwitch, PressureSwitch, Representive drawing,
Rubber Blower somevalveswill vary.
Blower
Return
Air
VentPipe
90° Street & Clamps Elbow
DRAIN SIDEVIEW
Rotate
Gas Pipe
Grommet f [,<7- do_ward
RubberCoupling
CombustionBlower
g Screws
Transition
HorizontalTrap Connection
Rose,
Ipears"
PointedOUT
NOTE_.Built-in channelwill be
angled5° to 10° also.
Horizontal Left Installations - (Dual Certified*9MPD, *9MPT &*9MPV) (SeeFigure3)
Note: DO NOT make hose connections until the hose routing and
lengths have been determined, Remove the condensate trap and drain hoses from the furnace and secure the drain hoses to the
drain stubs on the trap with the hose clamps (position the clamps as shown in Figure 3). Install the condensate trap/hose assembly to
the furnace casing, Hook one side of the "clamp ears" on the drain
stub through the hole in the casing and push the condensate trap into position. Secure with the two screws. Reconnect the drain hoses to the stubs on the vent fitting and the plastic transition and secure with the clamps.
Relocate the plastic cap and clamp from the vertical transition drain stub to the horizontal transition drain stub on the condensate drain
trap. Secure the clamps tightly to prevent condensate leakage. Do
not change the cap and clamp on the vent drain stub. Mount the condensate drain trap in a vertical position to the left side
of the furnace using the two screws and gasket that are provided. Note: The condensate trap will be located under the furnace in a
vertical position when the furnace is placed horizontally on the left
side. If needed, remove the hole plugs from the furnace side panel and relocate to the open set of holes in the opposite side panel.
NOTE: All gaskets and seals must be in place for sealed combus-
tion applications.
Remove the 90 ° street elbow and vent fitting from the combustion blower by loosening the clamps on the vent fitting. Connect the 90 °
street elbow to the combustion blower using the rubber coupling and clamps. Glue a 11" section of PVC pipe (field supplied) to the 90 ° street elbow after checking the fit up. (Follow the procedures outlined in the Joining Pipe and Fittings section of this manual, page 13.) The PVC pipe will extend through the top panel about
441 06 1039 00 - 4 -
11/2"• Connect the vent fitting to the end of the 11" section of PVC
pipe using the clamp.
NOTE: The vent fitting MUST be installed with the airflow marking arrow pointed toward the vent pipe, with the drain stub at a5°to 10° downward slope.
Plug the upper drain stub on the vent fitting with the yellow plastic cap.
Connect the PVC vent extension pipe to the vent fitting. This pipe
has a built-in channel to assist vent condensate disposal.
Align the arrow on the PVC pipe with the airflow marking arrow on the vent fitting• See label on the PVC pipe for proper installation, This pipe may only be shortened if an elbow is used to connect the
PVC vent extension tube to field-installed vent pipe, Securely at- tach the PVC vent extension pipe to the vent fitting with the clamp.
Connect the 5/8" OD rubber hose with the 90° bend to the lower drain stub on the vent fitting and secure with a 5/8" clamp.
Route the hose to the horizontal drain stub on the condensate trap. Cut off excess hoses and discard. Connect the hose to the drain
stub on the condensate trap and secure with a 5/8" clamp. Connect the 3/4" OD rubber hose with the 90° bend to the large
drain stub on the condensate trap and secure with a 3/4" clamp.
Route the hose to the drain stub on the bottom ofthe plastic transi- tion box• Cut off excess hose and discard. Connect the hose to the
drain stub on the transition and secure with a 3/4" clamp. The pressure tap on the condensate trap MUST be connected to
the unused pressure tap located on the top of the plastic transition box• Remove the plastic caps from the pressure taps on the con-
Preassembleand
insertintofurnace
25-24-09
densatetrapandtheplastictransitionandconnectwiththe5/16" ODrubberhose.
NOTE:Thiswillrequiredrillinga5/16"ODholeinthefurnacecasing nexttothecondensatetrap.
Horizontal Right Installations (Dual Certified *9MPD, *9MPT, *9MPV-A2 Models)
NOTE:Ensurehosesmaintainadownwardslopetotheconden- satetrapwithnokinkingorbindingforpropercondensatedrain-
age.
NOTE: TRAP MUST BE PRIMED BEFORE OPERATION
DRAIN SIDE VIEW VentFitting
_ward f _ _ PlaaticCap
j _ RubberCoupling._ _ /" 2[.Secyion
NOTE_':Built-inchannelwillbe &Clamps _ _ PVCPipe ..
angled 5° to 10° als0. _ (Field Bupplied)\_
Return
Rotate &Clampe_ Yellow
90° Street-__ _ _ c
5/8"Hose _ PlasticCaps_ -1_ _
&Clamps __ _
Combustion _ qo _' _ VentPipe
CombustionBlowek_ _ E MountingScrews _ O _ )
(4)
Blower _i_c ,___ _ G_ommet I_/_
Transition _<_ __ Coupling
PreaeureSwitch,__ )_'\__o__ Airlntake Air
Representive drawing,
some valves will vary.
Combustion
GasPipe Grommet
_ _ / Supply
Vent Pipe X
PVCVent _
Extenoi°n/PiPe _i
V&e;tFmit;isng \ x
AirPipe(Optional)
/
/
3/4"Hose& Clamps --Transition Box ,,pOplart Pde_rus,T
dwg 25-24-08
!ieV_20_ide_t_C_e_ill ' \\ BIowerPressureSwitch_,,_ \Preeeare_X Hose,BIowerSWitch/_> _J\_H°riz°ntalTrapConnection
r i / _'_/_
Horizontal Right Installations - (Dual Certified*9MPD, *9MPT,*9MPV) (SeeFigure4)
Note: DO NOT make hose connections until the hose routing and
lengths have been determined. Remove the condensate trap and drain hoses from the furnace and secure the drain hoses to the
drain stubs on the trap with the hose clamps (position the clamps as shown in Figure 4). Install the condensate trap/hose assembly to
the furnace casing. Hook one side of the "clamp ears" on the drain
stub through the hole in the casing and push the condensate trap into position. Secure with the two screws. Reconnect the drain hoses to the stubs on the vent fitting and the plastic transition and secure with the clamps.
Relocate the plastic caps and clamps on the condensate drain trap
from the vertical drain stub to the horizontal drain stubs. Secure the
clamps tightly to prevent condensate leakage. Mount the condensate drain trap in a vertical position to the right
side of the furnace using the two screws and gasket that are pro-
vided. Note: The condensate trap will be located under the furnace
in a vertical position when the furnace is placed horizontally on the right side. If needed, remove the hole plugs from the furnace side panel and relocate to the open set of holes in the opposite side pan-
el. NOTE: All gaskets and seals must be in place for sealed combus-
tion applications.
441 06 1039 oo - 5 -
Remove the 90 ° street elbow and vent fitting from the combustion blower by loosening the clamps on the vent fitting. Connect the 90 °
street elbow to the combustion blower using the rubber coupling and clamps. Cut a 2" section of PVC pipe (field supplied). Glue the 2" section of PVC pipe to the 90 ° street elbow after checking the fit up. (Follow the procedures outlined in the Joining Pipe and Fittings section of this manual, page 13.) Connect the vent fitting to the end of the 2" section of PVC pipe using the clamp.
NOTE: The vent fitting MUST be installed with the airflow marking arrow pointed toward the vent pipe, with the drain stub at a 5° to 10 °
downward slope.
Plug the upper drain stub on the vent fitting with the yellow plastic cap.
Connect the PVC vent extension pipe to the vent fitting. This pipe
has a built-in channel to assist vent condensate disposal.
Align the arrow on the PVC pipe with the airflow marking arrow on the vent fitting. See label on the PVC pipe for proper installation. This pipe may only be shortened if an elbow is used to connect the
PVC vent extension tube to field-installed vent pipe. Securely at- tach the PVC vent extension pipe to the vent fitting with the clamp.
Remove the pressure switch hose from the upper stub on the plas- tic transition box.
\ II_lo_o" _1 aodinsert
_ int0furnace
Loading...
+ 9 hidden pages