RRU5909&RRU5309&RRU5309w&RR
U3959a Installation Guide
Contents
7.2.2 RRU5909&RRU5309&RRU5309w&RRU3959a Installation Guide
7.2.2.1 Changes in RRU5909&RRU5309&RRU5309w&RRU3959a Installation Guide
7.2.2.2 Installation Preparations
7.2.2.2.1 Reference Documents
7.2.2.2.2 Tools and Instruments
7.2.2.2.3 Skills and Requirements for Onsite Personnel
7.2.2.3 Information About the Installation
7.2.2.3.1 RRU Exterior
7.2.2.3.2 RRU Ports
7.2.2.3.3 RRU Indicators
7.2.2.3.4 Installation Scenarios
7.2.2.3.5 Installation Clearance Requirements of an RRU
7.2.2.3.5.1 Clearance for a Single RRU
7.2.2.3.5.2 Clearance for Three or More RRUs
7.2.2.3.5.3 Installation Spacing Between RRUs
7.2.2.4 Unpacking the Equipment
7.2.2.5 Installation Process
7.2.2.6 Hoisting an RRU and Related Cables onto a Tower
7.2.2.6.1 Hoisting an RRU onto a Tower
7.2.2.6.2 Hoisting Optical Fibers onto a Tower
7.2.2.6.3 Hoisting Power Cables onto a Tower
7.2.2.7 Installing the RRU
7.2.2.7.1 Mounting Kits for an RRU
7.2.2.7.2 Installing the RRU on a Pole
7.2.2.7.2.1 Installing a Single RRU
7.2.2.7.2.2 Installing Two RRUs
7.2.2.7.2.3 Installing Three or More RRUs
7.2.2.7.3 Installing an RRU on U-steel
7.2.2.7.4 Installing an RRU on Angle Steel
7.2.2.7.5 Installing an RRU on a Wall
7.2.2.7.6 Installing an RRU on an IFS06
7.2.2.8 Installing RRU Cables
7.2.2.8.1 Cabling Requirements
7.2.2.8.2 RRU Cable Connections
7.2.2.8.3 Installing RRU Cables
7.2.2.8.4 RRU Cable List
7.2.2.8.5 Installing an RRU PGND Cable
7.2.2.8.6 Installing an RRU RF Jumper
7.2.2.8.7 Installing an RRU AISG Multi-Wire Cable and AISG Extension Cable
7.2.2.8.8 Opening the Cover Plate of an RRU Cabling Cavity