No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
recommendations in this document are provided "AS IS" without warranties, guarantees or representations
and
of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute the warranty of any kind, express or implied.
Huawei Technologies Co., Ltd.
Address:Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website:
Email:support@huawei.com
http://www.huawei.com
Issue 01 (2011-03-30)Huawei Proprietary and Confidential
DBS3900(ICR)
Installation GuideAbout This Document
About This Document
Purpose
This document describes the procedures for installing the DBS3900 devices on the Indoor
Centralized Rack (ICR).
Product Version
The following table lists the product versions related to this document.
Product NameProduct Version
DBS3900V100R004
DBS3900 WCDMAV200R013
DBS3900 LTEV100R003C00
DBS3900 GSMV100R013
Intended Audience
This document is intended for:
lBase station installation engineers
Organization
1 Changes in the DBS3900 (ICR) Installation Guide
2 Installation Preparations
This chapter describes the tools and instruments required for installation and the skills and
prerequisites required for onsite installation engineers.
Issue 01 (2011-03-30)Huawei Proprietary and Confidential
This chapter describes the information about the installation, including exterior, installation
scenario, and space requirements
4 Unpacking the Equipment
Unpack
and check the delivered equipment to ensure that all the materials are included and intact.
5 Obtaining the ESN
The Electronic Serial Number (ESN) is a unique identifier of a Network Element (NE). Record
the ESN for later commissioning of the base station before installation.
6 Installation Process
This section describes the process of installing the DBS39000 on the ICR.
7 Assembling the IFS06
This chapter describes the procedure for assembling the IFS06.
8 Installing the IFS06
This chapter describes the procedure for installing the IFS06 on the concrete floor and ESD
floor.
9 Installing the Main Bracket for the RRU
This chapter describes the procedure for installing the main bracket for the DC RRU and AC
RRU.
10 Installing the GPS Surge Protector
This chapter describes the procedure for installing the GPS surge protector.
11 Installing the IMB03
This chapter describes the procedure for installing the IMB03.
12 Installing the Equipotential Cable and PGND Cable
This chapter describes the procedures for installing the equipotential cable and PGND cable.
13 Installing Devices in the IMB03
This chapter describes the installation of the devices in the IMB03.
14 Installing the RRU
This section describes the procedure for installing the AC RRU and DC RRU.
15 Installing Cables
This chapter describes the procedure for installing all the cables.
16 Checklist for the DBS3900 Hardware Installation
This section describes the checklist for the DBS3900 hardware installation.
17 Performing the DBS3900 Power-On Check
After all devices are installed, you need to check the power-on status of the BBU and RRU.
DBS3900(ICR)
Installation GuideAbout This Document
This section describes the procedure for installing the cover plate for the IMB03.
Conventions
Symbol Conventions
The symbols that may be found in this document are defined as follows.
SymbolDescription
Indicates a hazard with a high level of risk, which if not
avoided, will result in death or serious injury.
Indicates a hazard with a medium or low level of risk, which
if not avoided, could result in minor or moderate injury.
Indicates a potentially hazardous situation, which if not
avoided, could result in equipment damage, data loss,
performance degradation, or unexpected results.
Indicates a tip that may help you solve a problem or save
time.
Provides additional information to emphasize or supplement
important points of the main text.
General Conventions
The general conventions that may be found in this document are defined as follows.
ConventionDescription
Times New RomanNormal paragraphs are in Times New Roman.
BoldfaceNames of files, directories, folders, and users are in
boldface. For example, log in as user root.
ItalicBook titles are in italics.
Courier New
Examples of information displayed on the screen are in
Courier New.
Command Conventions
The command conventions that may be found in this document are defined as follows.
ConventionDescription
BoldfaceThe keywords of a command line are in boldface.
ItalicCommand arguments are in italics.
Issue 01 (2011-03-30)Huawei Proprietary and Confidential
2.1 Making Documents Available.........................................................................................................................2-2
2.2 Tools and Instruments.....................................................................................................................................2-2
2.3 Skills and Requirements for Onsite Personnel................................................................................................2-3
3 Information About the Installation........................................................................................3-1
3.1 Overview of Devices.......................................................................................................................................3-2
7 Assembling the IFS06................................................................................................................7-1
8 Installing the IFS06....................................................................................................................8-1
8.1 Installing the IFS06 on the Concrete Floor.....................................................................................................8-2
8.2 Installing the IFS06 on the ESD Floor............................................................................................................8-6
9 Installing the Main Bracket for the RRU...............................................................................9-1
9.1 Installing the Main Bracket for the DC RRU..................................................................................................9-2
9.2 Installing the Main Bracket for the AC RRU..................................................................................................9-3
10 Installing the GPS Surge Protector.....................................................................................10-1
11 Installing the IMB03..............................................................................................................11-1
11.1 Installing the IMB03 on the Upper Level Separately
11.2 Installing the IMB03 on the Lower Level Separately.................................................................................11-3
11.3 Installing the IMB03s on the Upper and Lower Levels..............................................................................11-5
13 Installing Devices in the IMB03..........................................................................................13-1
13.1 Installing the BBU.......................................................................................................................................13-2
13.2 Installing the DCDU-03B............................................................................................................................
13.3 (Optional) Installing the Power Equipment (DC/DC).................................................................................13-4
13.4 (Optional) Installing the Power Equipment (AC/DC).................................................................................13-6
13-3
14 Installing the RRU.................................................................................................................14-1
14.1 Installing the DC RRU................................................................................................................................14-2
14.2 Installing the AC RRU................................................................................................................................14-5
15.5 Installing the PGND Cable for the RRU...................................................................................................15-48
15.6 Installing the Power Cable for the BBU....................................................................................................15-50
15.7 Installing the Input Power Cable...............................................................................................................15-51
15.8 (Optional) Installing the Power Cable and Monitoring Signal Cable for the DCDU...............................15-54
15.9 Installing the Power Cable for the RRU....................................................................................................15-56
15.10 Installing the E1/T1 Cable (FE/GE Cable or FE/GE Optical Cable)......................................................15-59
15.11 Installing the CPRI Optical Cable...........................................................................................................15-61
15.12 Installing the Antenna Jumper for the RRU............................................................................................15-64
15.13 Installing a GPS Clock Signal Cable.......................................................................................................15-67
16 Checklist for the DBS3900 Hardware Installation...........................................................16-1
17 Performing the DBS3900 Power-On Check......................................................................17-1
Figure 3-34 Height-unrestricted triple-mode scenario (+24 V DC)...................................................................3-34
Figure 3-35 Installation of the DC RRUs on the IFS06.....................................................................................3-35
Figure 3-36 Dimensions of the IFS06................................................................................................................3-36
Figure 3-37 Dimensions of the IMB03..............................................................................................................
Figure 3-38 Recommended clearance for the ICR (DC-RRU-based)................................................................3-37
Figure 3-39 Recommended clearance for the ICR (AC-RRU-based)................................................................3-38
Figure 3-40 Minimum clearance for the ICR in the height-unrestricted scenario............................................. 3-39
Figure 3-41 Minimum clearance for the ICR in the height-restricted scenario................................................. 3-40
Figure 3-42 Minimum clearance for the ICR (AC-RRU-based)........................................................................3-41
Figure 3-43 Clearance requirements for combined cabinets..............................................................................3-42
Figure 5-1 Obtaining the ESN (1)........................................................................................................................5-1
Figure 5-2 Obtaining the ESN (2)........................................................................................................................5-2
Figure 7-1 Installing the rear feet.........................................................................................................................7-1
Figure 7-2 Installing the front feet.......................................................................................................................7-2
Figure 7-3 Moving down the adjustable beam.....................................................................................................7-3
Figure 7-4 Installing the cable rack......................................................................................................................7-4
Figure 7-5 Installing the adapting piece for the GPS surge protector..................................................................7-5
Figure 8-3 Assembling an expansion bolt............................................................................................................8-3
Figure 8-4 Installing an expansion bolt................................................................................................................8-4
Figure 8-5 Removing a bolt..................................................................................................................................8-4
Figure 8-6 Installing the bolts..............................................................................................................................8-4
Figure 8-7 Pre-tightening the bolts.......................................................................................................................8-5
Figure 8-8 Checking and adjusting the level of the IFS06...................................................................................8-5
Figure 8-9 Tightening the bolts............................................................................................................................8-6
Figure 8-10 Support for installing the ESD floor.................................................................................................8-6
Figure 8-13 Installing the support........................................................................................................................8-8
Figure 8-14 Removing the bolts...........................................................................................................................8-9
Figure 8-15 Install the IFS06..............................................................................................................................8-10
Figure 8-16 Pre-tightening the bolts...................................................................................................................8-10
Figure 8-17 Checking and adjusting the level of the ICR..................................................................................8-11
Figure 8-18 Tightening the bolts........................................................................................................................8-11
Figure 9-1 Main and auxiliary brackets for the RRU...........................................................................................9-1
Figure 9-2 Installing the main bracket in the height-unrestricted scenario..........................................................9-2
Figure 9-3 Installing the main bracket in the height-restricted scenario..............................................................9-3
Figure 9-4 Installing the main bracket in the height-unrestricted scenario..........................................................9-4
Figure 9-5 Installing the main bracket in the height-restricted scenario..............................................................9-5
Figure 10-2 Removing the insert nut and toothed washer
Figure 10-3 Installing the connector..................................................................................................................10-2
Figure 10-4 Installing the GPS surge protector..................................................................................................10-2
Figure 10-5 Installing the PGND cable for the GPS surge protector.................................................................10-3
Figure 11-1 Removing the protection plates......................................................................................................11-2
Figure 11-9 Securing the IMB03 to the feet of the ICR.....................................................................................11-6
Figure 11-10 Removing the protection plates from the upper-level IMB03......................................................11-7
Figure 11-11 Installing mounting ears horizontally on the upper-level IMB03................................................11-7
Figure 11-12 Securing the IMB03 to the feet of the ICR...................................................................................11-8
Figure 12-1 Installation of the equipotential cable and PGND cable.................................................................12-2
Figure 13-1 Configurations of the slots in the IMB03.......................................................................................13-1
Figure 13-2 Removing the mounting ears..........................................................................................................13-2
Figure 13-3 Installing the mounting ears reversely............................................................................................13-2
Figure 13-4 Installing the BBU into the slot in the IMB03................................................................................13-3
Figure 13-5 Installing the DCDU-03B into the slot in the IMB03....................................................................13-4
Figure 13-6 Installing the PGND cable for the DCDU-03B..............................................................................13-4
Figure 13-7 Reinstalling the mounting ears.......................................................................................................13-5
Figure 13-8 Installing the power equipment (DC/DC) in the IMB03................................................................13-5
Figure 13-9 Installing the PGND cable for the power equipment (DC/DC)......................................................13-6
Figure 13-10 Installing the power equipment (AC/DC) in the IMB03..............................................................13-7
Figure 13-11 Installing the PGND cable for the power equipment (AC/DC)....................................................13-8
Figure 14-1 Removing the adapting piece and cover plate................................................................................14-2
Figure 14-2 Removing the screws......................................................................................................................14-3
Figure 14-3 Reinstalling the adapting piece and cover plate.............................................................................14-3
Figure 14-4 Connecting the PGND cable for the RRU to the wiring terminal at the bottom............................14-4
Figure 14-5 Installing the RRU on the main bracket.........................................................................................14-4
Figure 14-6 Installing six RRUs.........................................................................................................................14-5
Figure 14-7 Connecting the PGND cable for the RRU to the wiring terminal at the bottom............................14-6
Figure 14-8 Installing the AC RRU on the main bracket...................................................................................14-7
Figure 15-1 Cable connections (-48 V DC, six RRU3008s)..............................................................................15-6
Figure 15-2 Cable connections (-48 V DC, six RRU3804s)..............................................................................15-7
Figure 15-3 Cable connections (-48 V DC, six RRU3201s)..............................................................................15-9
Figure 15-4 Cable connections (-48 V DC, six RRU3908s)............................................................................15-11
Figure 15-5 Cable connections in the dual-mode scenario (-48 V, three RRU3908s + three RRU3804s)......15-13
Figure 15-6 Cable Connections in triple-mode scenario (-48 V DC, Three RRU3908s + Three RRU3804s)
This chapter describes the tools and instruments required for installation and the skills and
prerequisites required for onsite installation engineers.
2.1 Making Documents Available
Before installing the DBS3900, obtain related information from the following document:
2.2 Tools and Instruments
This section describes the tools and instruments required for installation.
2.3 Skills and Requirements for Onsite Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
Issue 01 (2011-03-30)Huawei Proprietary and Confidential
Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
Before the installation, pay attention to the following items:
lThe customer's technical engineers must be trained by Huawei and be familiar with the
proper installation and operation methods.
lThe number of onsite personnel depends on the engineering schedule and installation
environment. Generally, only three to five onsite personnel are necessary.