Safety Information …………………….….……………………1
Installation Tools ………………….………….……………….. 2
Space Requirements ………………….……..……………….. 3
Installation Modes …………………………………………...... 4
Installation Procedure ………….…………………………….. 5
Components Delivered with the RRU ………………………5
Installing the RRU on a Metal Pole …………………………. 6
Installing the RRU on a Wall ………………………………....11
Installing the RRU on a U-Steel …………….………………..12
Installing the RRU on an Angle Steel ……………………....12
Installing the RRU Cables …………………………………….13
RRU Hardware Installation Checklist ……………………….22
Powering On the RRU ………………...……………………….23
Reference ……………………………….………………………..24
Safety Information
Following All Safety Precautions
Before any operation, read the instructions and precautions in this document carefully to minimize the possibility
of accidents.
The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be
followed. They only provide the generic safety precautions for operations.
When operating Huawei products and equipment, you must comply with safety precautions and special safety
instructions related to corresponding equipment provided by Huawei. The safety precautions in the document
are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of
universal regulations for safety operations and safety codes on design, production, and equipment use.
Complying with the Local Safety Regulations
When operating the device, comply with the local safety regulations. The safety precautions provided in the
documents are supplementary. You must comply with the local safety regulations.
Qualified Personnel Only
The personnel in charge of installation and maintenance must be trained and master the correct operating
methods and safety precautions before beginning work.
Symbols
This symbol indicates that casualty or serious accident may occur if you ignore
the safety instruction.
This symbol indicates that serious or major injury may occur if you ignore the
safety instruction.
This symbol indicates that the operation may be easier if you pay attention to the
safety instruction.
Safety of Personnel
•The high voltage power supply provides power for running the system. Direct contact with the high voltage
power supply or contact through damp objects may result in fatal danger.
•Non-standard and improper high voltage operations may result in fire and electric shock.
•In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel
tower and mast.
•Ground the device before powering on the device. Otherwise, the personnel and device are in danger.
•Power off the device before performing operations on the power supply equipment.
•High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna
on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all
parties to ensure that the transmitter antennas are shut down.
•When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.
•Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.
•Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur.
•When working at a height, be cautious about falling objects.
Device Safety
•Check the electrical connection of the device before operation and ensure that the device is reliably grounded.
•The static electricity generated by the human body may damage the electrostatic sensitive components on
the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when
performing the operation.
•When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss.
The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.
(21mm~21mm)for pole installation
(17mm~17mm) for wall installation
ESD glovesPower cable crimping pliers
Long measuring tape
2
Space Requirements (Unit: mm)
a
RRU Dimensions
Recommended Clearance
b
for a Single RRU
≥300
≥
285
0
6
170
485
c
Minimum Clearance for a
Single RRU
200
0
0
0
4
d
0
0
3
≥
≥
8
0
0
≥500
Recommended Clearance for
Multiple Centralized RRUs
2
6
5
≥300
0
0
5
≥
≥
≥
0
0
5
8
0
0
0
0
1
6
0
300
Minimum Clearance for
e
Multiple Centralized RRUs
2
6
5
200
0
0
3
0
0
0
3
8
0
0
≥500
300
3
Installation Modes
On a metal poleOn a wall
On a U-steelOn an angle steel
The following figure shows the specifications of the metal pole, angle steel, and U-steel where the RRU is installed.
60mm~114mm
80mm
~
63mm
50mm
~
30mm
50mm~100mm
63mm~80mm
Metal poleAngle steel
U-steel
The RRU can be installed on the tower. For details, see page 24 Lifting the RRU and
Installation Components to the Tower
The following figures show the installations of multiple RRUs on the metal poles.
4
Installation Procedure
Start
Prepare the
installation
(slide5)
Install the RRU on a
metal pole
(slide6~10)
Install the RRU on a
wall
(slide11)
Install the cables of
the RRU
(slide13~21)
Check the
installation
(slide22)
Power on the RRU
(slide23)
Install the RRU on
an angle steel
(slide12)
End
Components Delivered with the RRU
Install the RRU on a
U-steel
(slide12)
expansion
bolt
Auxiliary
fixture
Fixture assembly for
installing the RRU
Cover plateAttachment plate
M10x110
Bolt
Main
fixture
Front of the RRUBack of the RRU
5
Installing the RRU on a Metal Pole
a
Installing a Single RRU in Ordinary Mode
Install the main fixture.
1. Before installing the main fixture, ensure that the contact piece
on the fixture is fixed.
2. When installing the main fixture, keep the arrow on the main
fixture upward.
It is recommended that the bottom of the main fixture be 1200
mm to 1600 mm above the ground for easy maintenance.
Arrow
Install the auxiliary fixture between the nuts of the dual-nut bolt assembly on the main fixture.
Ensure that the
arrow on the
auxiliary fixture is
upward.
Installation position
for the auxiliary
fixture.
You may fit one end of the auxiliary fixture on one dual-nut bolt assembly before installation. And then fit the other end
on the other dual-nut bolt assembly during the installation.
6
Installing the RRU on a Metal Pole
Use an adjustable wrench (21 mm) to tighten the nut. In this way, the main and auxiliary
fixtures are securely mounted on the pole.
When tightening the nuts, ensure that the two dual-nut bolt assemblies are tightened simultaneously. T he fastening
torque is 35 N• m to 40 N• m.
Install the RRU on the main fixture.
The screw is a non-fixed
one and is for removing
the RRU.
The RF port at the bottom of the RRU does not have load bearing capacity.
Do not place the RRU on the ground on its bottom during the installation.
7
Installing the RRU on a Metal Pole
b
Installing Two RRUs in Back-To-Back Mode
Install an RRU first. For details, see
page 6 Installing a Single RRU in
Ordinary Mode.
Reinstall the cover plate and attachment plate on
the second RRU to interchange their positions.
Install the main fixture of another RRU.
Ensure that the main and auxiliary fixtures
are perfectly fitted.
M6x16
Install the second RRU on the
main fixture.
M6x16
Ensure that the cabling cavities of the two RRUs face the same
direction when installing the RRUs.
RRU installed in
reverse mode
Cabling
RRU installed in
ordinary mode
cavity
8
Loading...
+ 21 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.