HP Performance Optimized Data Center (POD) 20cp Setup and Install

HP Performance-Optimized Datacenter, 6 m (20 ft) Site Requirements Information

Part Number 587017-002 March 2010 (Second Edition)
The information contained herein is subject to change without notice. The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall not be liable for technical or editorial errors or omissions contained herein.
Intended audience
This document is for the person who installs, administers, and troubleshoots servers and storage systems. HP assumes you are qualified in the servicing of computer equipment and trained in recognizing hazards in products with hazardous energy levels.

Contents

Site requirements .......................................................................................................................... 4
About this document ..................................................................................................................................... 4
Site preparation ........................................................................................................................................... 4
Safety information ........................................................................................................................................ 4
System utilities.............................................................................................................................................. 5
Power ............................................................................................................................................... 5
Drainage ........................................................................................................................................... 6
Optional connections to central facility infrastructure ........................................................................................ 7
Environmental considerations .............................................................................................................. 7
Environmental specifications ................................................................................................................ 7
Lightning protection ............................................................................................................................ 8
HP POD specifications ................................................................................................................... 9
Dimensions .................................................................................................................................................. 9
Weight ....................................................................................................................................................... 9
Required clearances ..................................................................................................................................... 9
Internal components ................................................................................................................................... 12
Water supply specifications ........................................................................................................................ 14
Water quality requirements .......................................................................................................... 15
Water quality requirements and specifications .............................................................................................. 15
Acceptable water quality specifications .............................................................................................. 15
Piping materials ............................................................................................................................... 16
Water precautions ..................................................................................................................................... 16
Condensation management ......................................................................................................................... 16
Power management .................................................................................................................... 17
Connection requirements ............................................................................................................................. 17
Power requirements .................................................................................................................................... 17
Main input power ...................................................................................................................................... 17
Main input power details .................................................................................................................. 18
Supported facility connections ...................................................................................................... 19
Humidifier specifications ............................................................................................................................. 19
Convenience outlets .................................................................................................................................... 19
Grounding requirements ............................................................................................................................. 19
IT cable portals .......................................................................................................................................... 20
HP POD security......................................................................................................................................... 20
HP POD Environmental Control System ......................................................................................................... 20
Fire, safety, and security notifications ........................................................................................................... 21
Acronyms and abbreviations ........................................................................................................ 22

Site requirements

About this document

This document outlines the installation requirements for a 6 m (20 ft) HP POD. These guidelines are for a qualified architectural or consulting engineering team to generate site-specific documents for each HP POD installation. The site-specific installation documentation must comply with local building code

Site preparation

jurisdictions.
The HP POD must be installed on a surface capable of supporting approximately 24,948 kg (55,000 lb). The site location for the HP POD must be level +/- 0.5 degrees tolerance. Appropriate clearance for installation, service, and system utilities (power and water) must also be considered.
IMPORTANT: Before installing the HP POD, consult your local AHJ for applicable codes and
to review site-specific location guidelines.
IMPORTANT: The HP POD is designed for ground level installation. If you install the HP POD
on an elevated surface, make sure the minimum height requirements for circuit breaker actuators are considered per local and national electric code requirements.
The area in front of the outside panels must include a work platform. The distance from the work platform surface to the center of any circuit breaker actuator handle must not exceed 183 cm (72 inches). The platform must be a minimum of 91 cm (36 inches) wide for free air, and if the platform construction is grounded metal, must be a minimum of 107 cm (42 inches) wide.

Safety information

The HP POD is certified to UL 69050/IEC 60950 as an Information Technology Product and Classified according to the National Electric Code NFPA-70, 2008
The HP POD is not suitable for long term human occupancy. The HP POD has service access areas for periodic maintenance and service. These areas must be used only by owner-authorized personnel who are trained in the maintenance and service of the HP POD IT components.
IMPORTANT: Before installing the HP POD, consult your local AHJ for applicable codes and
Before installing your HP POD, verify that the following prerequisites have been met:
All components have been delivered to your facility.
The HP POD, power distribution components, and water distribution components are in their final
You have facility power at your final location.
to review site-specific location guidelines. If needed, obtain any necessary permits.
location.
Site requirements 4
You have chilled water at your final location.
You have made provisions for properly grounding the HP POD.

System utilities

Your site location must accommodate the following utilities:
Cooling water
Electrical power

Power

Drainage
Item Component
1 Chilled water supply connection
2 Chilled water return connection
3 External communication box (if fitted)
ECS Fire Security Telephone
Site requirements 5
Item Component
1 Main input power junction boxes
2 IT cable portals

Drainage

Site requirements 6
Drain hot aisle view
Item Component
1 Water main supply/return drains
2 Heat exchanger condensate drain

Optional connections to central facility infrastructure

HP POD ECS
Life safety systems
Convenience outlet power
Site networking connection
Domestic water for optional humidifier

Environmental considerations

Security system (optional)
(Optional) Install under a properly engineered awning.
Install lightning protection for the HP POD.
Make sure that the HP POD is installed in a well lit area that complies with local workplace lighting
regulations.
Make sure that the HP POD is properly grounded.
Avoid placing the HP POD directly along a drainage path or in an area prone to flooding.

Environmental specifications

Features Specifications
Operating temperature -18ºC to 54ºC (-0ºF to 130ºF).
Supports to -29ºC (-20ºF) with optional cold weather protection installation.
Site requirements 7