A
dhesive Anchoring Systems
4.2.5 HIT-ICE/HIT HY 150 Adhesive Anchor
4.2.5.4 Installation Instructions
HAS, Rebar and Insert Installation Instructions
1. Drill anchor hole with a carbide bit. Contact Hilti for use
of Diamond Core bits.
5. Screw on static mixer. 6. Put holder/cartridge into
2. Clean hole with wire brush.
Proper hole cleaning is
essential.
appropriate dispenser and
discard first three trigger
pulls of adhesive from each
refill pack or cartridge.
Rod
9. Insert rod. Twist during installation.
10. Fastener may be adjusted during specified gel time.
Insert
3. Insert air nozzle to bottom of
hole and blow out hole using
a pump, or compressed air.
7. Inject adhesive into hole
starting at the bottom until
1/2 to 2/3 full. Use mixer
filler tube extensions when
needed to reach the hole
bottom.
11. Do not disturb anchor between
specified gel time and cure
time.
4. HY 150 only: Put refill pack
into holder.Remove cap covering threaded projection.
8. Unlock dispenser.
12. Apply specified torque as
required to secure items to be
fastened. Do not exceed maximum torque specified.
≤ T
max
9. Insert threaded insert.
Twist during installation.
Rebar
9. Insert rebar.Twist during installation.
154 Hilti, Inc. (US) 1-800-879-8000 | www
≤ T
max
10. Fastener may be adjusted during specified gel time.
10. Fastener may be adjusted during specified gel time.
.us.hilti.com
I en español 1-800-879-5000 I Hilti (Canada) Corp. 1-800-363-4458 I www
11. Do not disturb anchor between
specified gel time and cure
time.
11. Do not disturb anchor between
specified gel time and cure
time.
12. Apply specified torque as
required to secure items to be
fastened. Do not exceed maximum torque specified.
12. Apply specified torque as
required to secure items to be
fastened. Do not exceed maximum torque specified.
I Pr
echnical Guide 2006
oduct T
.ca.hilti.com