Hilti CP681 INSTALLATION

Installation Instructions for CP 681 Tub Box Kit
CONCRETE ON WOOD FORM FOR FLOORS Refer to Hilti product literature and the latest UL Fire Resistance Directory details. Do not use for wall applications.
Secure the coupling sleeve flange (the larger of the three flanges) to the floor deck using nails or screws.
Using standard solvent cement on both plastic surfaces, assemble the CP 681 Tub Box legs and sleeve to bottom of the Tub Box as follows:
• Cement the two 3/4" PVC stabilizing legs to the matching connecting area on the bottom side of the CP 681 Tub Box.
• Cement the CP 681 Tub Box and larger PVC plastic sleeve to the connecting area on the bottom side of the CP 681 Tub Box.
• Secure the smaller leg flanges to the deck using nails or screws.
Pour concrete to the proper
CP 681
height. assembly is precut to the slab thickness.
Tub Box
After concrete is cured, remove the floor deck and foam insert. Remove pressure test cap before installing drain piping.
Install the tub drain/overflow assembly piping (plastic or brass) through the CP 681 Tub Box and plastic coupling. Insert proper elastomeric bushing into the bottom or top of the CP 681 Tub Box assembly around the drain pipe. Note: Install bushing before final drain/overflow assembly if installing from the top side. Complete the installation by installing branch and trap piping.
Loading...