Henny Penny HC-900 Installation Manual

5. Peel off any protective covering from the exterior of the cabinet.
eated Holding Cabinet is now ready for
location and set up.
e certain to save any literature that is packed inside the
cabinet. The HC-900 should be placed in an area where the doors
can be opened without interruption and loading and unloading of product is easy. cabinet must be level.
Do not set anything on top of the cabinet that might close off the vent holes.
or proper operation, the
eated Holding Cabinet is available from the factory 20 VAC unit. The data plate, located on the side
of the module, will specify the correct electrical supply.
e unit requires a grounded receptacle with a separate
ctrical line protected by a fuse or circuit breaker of
the proper rating.
The cabinet must be adequately and safely grounded according to local
possibility of electrical
for electrical ratings for t
er
05148
el
120 1940
to prevent the
o the table below
16.2
Loading...
+ 2 hidden pages