Harbor Freight Tools R134A Quick Start Guide

Red HP (High-Pressure) sideBlue LP (Low-Pressure) side
A/C MANIFOLD
GAUGE SET
Manifold
QUICK
REFERENCE
GUIDE
LP Coupler
Valve
ITEM 92649
LP Coupler
To prevent SERIOUS INJURY and DEATH:
1. READ ENTIRE MANUAL BEFORE USE.
2. Use in well-ventilated area only.
3. Wear ANSI-approved safety goggles and heavy-duty work gloves during setup and use.
4. DO NOT OPEN either Manifold Valve unless directed to do so; otherwise, refrigerant leaks, A/C contamination, and hazardous expulsion of pressurized refrigerant may occur.
LP
Valve
Charging
Port
LP and
Vacuum
Gauge
Sight
Glass
Charging Hose
Manifold Valve
operation:
HP
Gauge
HP
Manifold
Valve
HP Coupler
HP Coupler
CW
CCW
Valve
WARNING
5. Keep gauge and hoses away from moving engine parts.
6. Turn off vehicle’s engine and A/C system before attaching gauge.
7. Technicians performing this procedure or opening refrigeration circuit in automotive
air conditioning systems MUST be certied
in refrigerant recovery and recycling procedures in compliance with section 609 of Clean Air Act Amendments of 1990.
= close
(clockwise)
= open
(counterclockwise)
Coupler Valve
operation:
= close
CCW
CW
(counter-
clockwise)
= open
(clockwise)
WARNING
A/C service can be dangerous.
To prevent SERIOUS INJURY,
read entire manual before use.
ATTACH COUPLERS:
Attach Couplers to
3
A/C system, Blue to suction LP port, and Red to discharge HP port.
Diagnostic Check
CHECK:
To do a dynamic check, turn on engine,
4
allow to warm up, then turn on A/C. Open Coupler Valves - turn CW. Compare Gauge readings to vehicle’s
service specications.
KEEP
CLOSED
CW
11
CW
CLOSED
KEEP
AFTER:
Close Coupler Valves by
5
turning CCW. Shut off engine and A/C system if dynamic check was done.
CAREFULLY disconnect Couplers from A/C system; hoses may contain residual refrigerant.
4
CW
1
CCW
To suction
LP port
3
CONNECT HOSES:
Connect Red, Blue and Yellow Hoses
2
to Manifold and Couplers as shown, RED – RED and BLUE – BLUE.
2
2
2
3
CLOSE ALL VALVES:
1
Manifold Valves - turn CW. Coupler Valves - turn CCW.
4
CW
1
CCW
To discharge
HP port
ATTACH COUPLERS:
Attach Couplers to
3
A/C system, Blue to suction LP port and Red to discharge HP port.
Recovery / Evacuation
RECOVERY / EVACUATION:
Turn on recovery system / vacuum pump.
4
Open Coupler Valves - turn CW. Open Manifold Valves - turn CCW. Read amount of vacuum on Blue LP Gauge.
4
CCW
1
CW
CCW
WARNING
A/C service can be dangerous.
To prevent SERIOUS INJURY,
read entire manual before use.
AFTER:
Shut off recovery
5
system / vacuum pump when vacuum reaches manufacturer’s
4
1
CW
recommendation. Close Coupler Valves by turning CCW. Disconnect Couplers from A/C system.
4
CW
1
CCW
To suction
LP port
3
CONNECT HOSES:
Connect Red and Blue Hoses to Manifold
2
and Couplers as shown, RED – RED and BLUE – BLUE. Connect Yellow Hose to refrigerant recovery system / vacuum pump.
2
To refrigerant
recovery system
/ vacuum pump
2
2
CLOSE ALL VALVES:
1
Manifold Valves - turn CW. Coupler Valves - turn CCW.
CW
To discharge
HP port
3
4
1
CCW
WARNING
A/C service can be dangerous.
To prevent SERIOUS INJURY,
read entire manual before use.
ATTACH COUPLERS:
Attach Couplers to
3
A/C system, Blue to suction LP port and Red to discharge HP port.
4
CW
1
CCW
Charging
CHARGING:
Turn on engine, allow to warm up,
4
then turn on A/C. Open Coupler Valves - turn CW. Only open BLUE Manifold Valve - turn CCW.
4
CCW
1
CW
2
1
CW
2
KEEP
CLOSED
AFTER:
After charging
5
manufacturer recommended amount of R-134a, close Coupler Valves by turning CCW.
Shut off engine and A/C system.
CAREFULLY disconnect R-134a supply and Couplers from A/C system; hoses may contain residual refrigerant.
4
CW
1
CCW
To suction
LP port
3
CONNECT HOSES:
Connect Red and Blue Hoses to Manifold
2
and Couplers as shown, RED – RED and BLUE – BLUE. Connect Yellow Hose to R-134a supply.
KEEP R-134A CAN/CYLINDER UPRIGHT.
2
To R-134a
supply
CLOSE ALL VALVES:
1
Manifold Valves - turn CW. Coupler Valves - turn CCW.
To discharge
HP port
3
Loading...