![](/html/f8/f899/f899259490cf2d51fc961fbd2719cf909b1174d70e38b3176b5ff6c4a516ed5c/bg1.png)
12-18" FULL FLOOR TRANSITION
When installing the GSI aeration
transition, it will be necessary to field
cut a hole into the bottom sidewall
ring. Refer to diagram A for proper
dimensions of cutout. Take note of
DIAGRAM A: AS VIEWED FROM INSIDE BIN
the diagram showing the 1" dimension from bottom of entrance collar
side bracket to concrete. This dimension is important for proper fit
of transition.
Field drill bolt holes into sidewall
sheet for entrance collar sides and
sizing angle. Completely seal all
possible spots for water and air leakage with the provided tube caulking.
Note: Entrance collar
side bracket (TR-4731)
flange must be installed to the inside of
the bin sidewall.
![](/html/f8/f899/f899259490cf2d51fc961fbd2719cf909b1174d70e38b3176b5ff6c4a516ed5c/bg2.png)
12-18" FULL FLOOR TRANSITION
TRANSITION ASSEMBLY
TR-4734
Key
1
1
2
3
4
5
6
7
8
The flanges on transition top
are to go on the outside of
transition sides. The flanges
on transition bottom are to
go on the inside of transition
sides.
Part Number
TR-4724-1
TR-4724-2
TR-4767
TR-4726
TR-4727
TR-4728
TR-4729
TR-4730
TR-4731
Description
Transition side
Transition side
Transition faceplate
Top entrance collar piece
Bottom entrance collar
Sizing angle
Transition bottom
Transition top
Entrance collar side bracket
Sizing angle is installed on inside of
bin sidewall sheet as
shown.
PNEG-102