2.66" Side Draw Systems
Installation and Management Of Side Draw Systems
Grain Systems designs and manufacturers bins to the highest standards, however proper installation and good usage practices for a commercial flume system are essential, regardless of manufacturer . The following practices address general usage and installation criteria for such systems.
SIDE DRAW INST ALLA TION SIDE DRAW MANAGEMENT AND USAGE
1.) Side discharge is only permitted in GSI
commercial bins when a GSI manufactured side draw flume system has been installed. No corrugated steel bin should be unloaded through the sidewall without installation of such a system and permission of the manufacturer.
2.) Installation of a flume system may require
installation of additional wind rings and 3/4" diameter anchor bolts. Reference the tank gauge sheet for wind ring placement or contact GSI. Reference the attached page on 1" anchor bolt usage.
Installation of multiple systems may require additional wind rings and must be placed a minimum of 90° apart. Installation of multiple systems requires approval of GSI.
3.) A side draw should not be the only discharge system available. A standard center discharg e and conveyor should be installed.
1.) Side draw systems are intended for use with dry flowable grain. Side draws are not to be used for poorly flowing products. This is not unique to GSI bins and flume systems but is a general rule for such systems.
2.) In multiple system installations only one side draw may be used at any one time.
3.) Filling should not be occurring at the same time as grain is being withdrawn through the side draw flume system.
4.) Prolonged storage of grain in the sloped condition produced by side draw discharge may accelerate differential settlement and result in deformations of the bin/silo. After using the side draw system the sloped grain should be returned to a near level condition by use of the center discharge. Leveling of the grain should also allow more even consolida­tion of foundation and fill soils and produce more even settlement of the bin/silo.
5.) If geotechnical investigations or past experience indicate significant foundation soil level variations or a site propensity toward differential settlement, side draw usage may be prohibited or severely re­stricted. In this situation the use of a flume system should be reviewed with geotechnical consultants or the foundation engineer.
4
PNEG-066 2.66" & 4.00" Side Draw Installation
2.66" Side Draw Systems
1" Anchor Bolts Required With Sidedr aw Systems
Used With 2.66" Cor r u gation Commercial Tanks
CORRUGATION TANK TOTAL NUMBER OF
DIAMETER 1" ANCHOR BOLTS
2.66" 42' 42
2.66" 48' 48
2.66" 54 54
2.66" 60' 60
2.66" 72' 72
2.66" 75' 75
2.66" 78' 78
2.66" 90' 90
2.66" 105' 105
Use 1" diameter anchor bolts at all of the required stiffener locations.
PNEG-066 2.66" & 4.00" Side Draw Installation
5
2.66" Side Draw Systems
Additional Wind Rings Required For 2.66" Commercial Tanks
With Side Draw Chute Systems
(One System Only)
42' 48 ' 54' 60' 72' 75' 78' 90' 105'
RINGS STD ADD STD ADD STD ADD STD ADD STD ADD STD ADD STD ADD STD ADD STD ADD RINGS
37 - - - - - - - - 7 1 7 1 7 1 8 1 8 1 - - - - - - - - 37 36 - - - - - - - - 6 1 6 1 7 1 7 1 7 2 - - - - - - - - 36 35 - - - - - - - -616161 717171 - - - -35 34 - - - - - - - -515162 6262626234 33 - - - - - - - -424252 5353536233 3241414141525252525332 3132324141424242425331 3032324141414141424330 2921313232323232424329 2821212222223232334328 2711212222223232333427 2611112222222232333426 25 - -1111212 22222 23 33425 24 - -1 - -11212 222222233324 23 - -1 - -11212 222222232423 22 - -1 - -11212 222222232322 21 - -1 - -1 - -31222222 2232321 20 - -1 - -1 - -31222222 2232320 19 - -1 - -1 - -31213222 2232319 18 - -1 - -1 - -31213132 2232318 17 - -1 - -1 - -31212121 2222217 16 - -1 - -1 - -3 - -3121212121216 15 - -1 - -1 - -3 - -3121212111215 14 - -1 - -1 - -2 - -2 - -2 - -2 - -2 1 2 1 2 14 13 - -1 - -1 - -1 - -2 - -2 - -2 - -2 - -2 1 1 13 12 - - - - - - - - - - 1 - - 2 - - 2 - - 2 - - 2 - - 2 1 1 12
NOTE: Consult the gage sheet supplied with the tank for complete wind ring quantities and placement for the specific tank the sidedraw is being installed in.
6
PNEG-066 2.66" & 4.00" Side Draw Installation
Loading...
+ 14 hidden pages