Introduction3
Operating the Boiler3
Clock Setting5
General Information16
Boiler Position28
Flue Location and Ventilation39
Heating System411
Domestic Hot Water System513
Installation Preparation613
Flue Preparation715
Boiler Fixing817
Gas, Water and Condensate Conns.917
Electrical Connections1018
Commissioning1120
The Energysaver Combi 2 can provide room heating as part of
a central heating system, and domestic hot water direct from
the cold water supply. Instantaneous domestic hot water is
available from a small integral hot water storage vessel, so
additional secondary storage is not required. The central heating
water temperature and domestic hot water temperature can
both be adjusted on the boiler.
Once the controls are set the boiler operates automatically.
When there is no heating or hot water demand the burner may
operate very occasionally to maintain the temperature of the
hot water in the storage vessel at the required level. If there is
no heating demand for 24 hours then the pump and 3-way valve
will be operated to prevent them sticking. A frost protection
program is also included.
Please read these instructions and follow them carefully for the
safe and economical use of your boiler.
Gas Category
This boiler is for use only on G20 gas.
Gas Safety (Installation and Use) Regulations
In your own interests and that of safety, it is the Law that ALL
gas appliances are installed by a competent person in
accordance with the current issue of the above regulations.
Gas Testing and Certification
The boiler is tested and certificated for safety and performance.
It is, therefore, important that no alteration is made to the boiler
unless approved, in writing, by Hepworth Heating Ltd.
Any alteration not approved by Hepworth Heating Ltd., could
invalidate the certification, boiler warranty and may also infringe
the current issue of the Statutory requirements.
CE Mark
This boiler meets the requirements of Statutory Instrument, No.
3083 The Boiler Efficiency Regulations, and therefore is deemed
to meet the requirements of Directive 92/42/EEC on the efficiency
requirements for new hot water boilers fired with liquid or
gaseous fuels.
Type test for purposes of Regulation 5 certified by:
Notified body 0063.
Product/production certified:
Notified body 0063.
The CE Mark on this appliance shows compliance with:
1. Directive 90/396/EEC on the approximation of the Laws of
the Member States relating to appliances burning gaseous
fuels.
2. Directive 73/23/EEC on the harmonization of the Laws of the
Member States relating to electrical equipment designed for
use within certain voltage limits.
3. Directive 89/336/EEC on the approximation of the Laws of
the Members States relating to electromagnetic compatibility.
Control of Substances Hazardous to Health
Under Section 6 of The Health and Safety at Work Act 1974, we
are required to provide information on substances hazardous
to health.
The adhesives and sealants used in this appliance are cured
and give no known hazard in this state.
221854B
2
Important Information
Insulation Pads/Ceramic Fibre, Glass yarn
These can cause irritation to skin, eyes and the respiratory tract.
If you have a history of skin complaint you may be susceptible
to irritation. High dust levels are usual only if the material is
broken.
Instructions for Use
Gas Leak or Fault
If a gas leak or fault exists or is suspected, turn the boiler mains
electrical supply off and turn off the gas supply at the meter.
Consult your local gas company or your local installation/
servicing company.
Electrical Supply Failure
The boiler will not work without an electrical supply.
Normal operation of the boiler should resume when the electrical
supply is restored. If not, the boiler safety cut-off may have
operated, please refer to the following section to reset.
Reset any external controls, to resume normal operation of the
central heating.
The digital timer, if fitted, has a lithium battery back up and will
not need resetting.
Normal handling should not cause discomfort, but follow normal
good hygiene and wash your hands before eating, drinking or
going to the lavatory.
If you do suffer irritation to the eyes or severe irritation to the skin
seek medical attention.
Reset Button
Refer to diagram 1 which shows the fascia behind the drop
down door.
If the burner goes out check the digital display. Flashing digits
on the display indicate a fault. Allow the boiler to cool down for
at least four minutes then press the ‘reset’ button. This should
restart the boiler.
To obtain service call your installer or Heatcall (Glow-worm’s
own service organisation) using the telephone number given on
the front page of these instructions.
Dripping taps
If a hot water tap is dripping there is a possibility that the boiler
will not supply central heating when there is a demand. This will
occur when the boiler controller can detect a flow in the
domestic hot water circuit. It will continue to supply hot water
until the flow is no longer detected. To solve this problem either
turn off the dripping tap or replace the tap seal as required.
Operating the Boiler
FASCIA
RESET
BUTTON
To Operate the Boiler
1. Check that all five isolating valves are open with their slots
in line with the length of the valve, see diagram 8.1.
2. A sealed pressurised system must be filled and
pressurised by a competent person.
Only operate the boiler when you are sure that the system has
been filled and pressurised. Check this by looking at the
pressure gauge which should read a minimum of 1.0bar, see
diagram 1.
DIGITAL
DISPLAY
MODE
BUTTON
PRESSURE
GAUGE
Diagram 1
3. Open a hot water tap, check that water flows, then close it.
4. If you are in any doubt about the boiler being filled with water
contact your installation/servicing company or the local gas
company.
5. Check that the electrical supply to the boiler is ON at the
external isolator.
6. Set clock/timer (if fitted) and any remote controls as required.
7. If the display is flashing, press the 'reset' button, shown on
diagram 1.
8. The boiler should now operate.
9041
3221854B
Operating the Boiler
User Controls
The boiler is factory preset to supply domestic hot water up to
o
C and central heating up to 70oC.
65
The operation of the boiler can be altered by using the ‘mode’
button. Temperature Selection and Control Options are detailed
in sections 11.8 to 11.11.
Additional Options
Other modes are available by repeatedly pressing the ‘mode’
button. These cover fault indication and servicing and should
only be accessed by the service engineer. Repeated pressing
of the ‘mode’ button will eventually return the display to show
boiler temperature, see diagram 11.4.
To Turn the Boiler Off
It is preferable to leave the electrical supply on whenever
possible to permit operation of the built-in frost protection (see
‘Protection Against Freezing’ below) and daily pump and valve
exercise.
To turn off the central heating use the room thermostat or clock/
timer.
To turn off the domestic hot water select
Options in section 11.8 and diagram 11.4).
For holiday mode, refer to section 11.8.
To turn off the boiler for servicing, isolate it from the electrical
supply. To turn it on again follow the instructions given in ‘To
Operate the Boiler’.
(see Control
Maintenance and Servicing
If this appliance is installed in a rented property there is a duty
of care imposed on the owner of the property by the current
issue of the Gas Safety (Installation and Use) Regulations,
Section 35.
Servicing/maintenance should be carried out by a competent
person in accordance with the rules in force in the countries of
destination.
To obtain service, please call your installer or Heatcall (Glowworm’s own service organisation) using the telephone number
on the front cover of this booklet.
Please be advised that the ‘Benchmark’ logbook should be
completed by the installation engineer on completion of
commissioning and servicing.
All CORGI Registered Installers carry a CORGI ID card, and
have a registration number. Both should be recorded in your
boiler Logbook. You can check your installer is CORGI registered
by calling CORGI direct on :- 01256 372300.
If in doubt, contact you installation/servicing company for advice.
As a safety feature the boiler will stop working if the condensate
drain becomes blocked. The display will repeatedly flash ‘
‘8*’. During freezing conditions this may be due to the
then
forming of ice in the condense drain external to the house.
Release an ice blockage by the use of warm cloths on the pipe.
Press the reset button to restart the boiler. Contact your
installation / servicing company if the fault persists.
0’
Draining and Filling
This boiler works in a pressurised system which must only
be drained, refilled and pressurised by a competent person.
If the pressure gauge indicates a loss of system pressure, i.e.
less than 0.7bar, the appliance will shut down showing flashing:
‘1’ then ‘2*’ on the display. YOU MUST CONTACT YOUR
INSTALLER.
Pressure Relief Safety Valve
A pressure relief safety valve and discharge pipe is fitted to
the boiler. This valve must not be touched. Should there be
any discharge from the pipe, isolatethe boiler electrical supply
andcontact your installation/servicing company.
Cleaning
This appliance contains metal parts and care should be taken
when handling and cleaning with particular regard to edges.
The boiler casing can be cleaned using a mild liquid detergent
with a damp cloth, then a dry cloth to polish.
Do not use any form of abrasive or solvent cleaner as you may
damage the paint work.
Boiler Casing
Do not remove or adjust the casing in any way, as incorrect
fitting may result in incorrect operation or failure to operate
at all. If in doubt seek advice from the local gas company or your
installation/servicing company.
Replacement Parts
If replacement parts are required apply to your local supplier or
British Gas.
Please quote the name of the appliance.
Pluming from flue terminal
All condensing boilers produce a plume of water vapour from
the flue terminal. This is due to the high efficiency and hence
low flue gas temperature. This may increase in wet, damp
weather but is nothing to worry about.
Clearances
If the boiler is fitted into a compartment or cupboard do not use
the compartment or cupboard for storage.
Protection Against Freezing
The boiler has a built in frost protection programme as long as
the electricity and gas are left switched on.
This device only protects the boiler. Any other exposed areas
of the system should be protected.
If the mains electricity and gas are to be turned off for any long
periods during severe weather, it is recommended that the
whole system, including the combination boiler, should be
drained to avoid the risk of freezing.
221854B
4
Clock Setting
Setting Instructions for Electro/mechanical
Clock - if fitted
Refer to diagram 2.
This clock has a twenty four hour dial, i.e. 1pm is '13'.
To set the time, turn the whole face clockwise until the pointer
is against the time of day.
To set any “Off” time, push the tappets outwards.
To set any “On” time, push the tappets inwards.
Time can be set either “On” or “Off” in fifteen minute segments.
Note: The clock supplied is fitted with an override device, which
switches the clock programme “On” or “Off” permanently.The
switch will need to be repositioned to resume programmed
working.
CLOCK FACE
0
12
11
13
14
15
16
17
18
19
20
21
22
10
9
8
7
6
5
4
3
2
1
23
24
OVERRIDE
SWITCH
I
POINTER
TAPPETS
0
CONSTANT OFF
PROGRAMMED
I
CONSTANT ON
Diagram 2
Setting Instructions for the 7 Day Digital
Clock/Timer - if fitted
Refer to diagram 3.
5673
P
AUTO
I
MT
WTh
P
DAYHRMIN
RUN
FS
R
Su
This is a 24 hour clock/timer, that is 1pm is '13:00', and has 8
“ON” and 8 “OFF” daily switching actions.
It is fitted with a lithium battery back up which protects the
programme in the event of an electrical failure. The battery
should have a life of several years.
Setting the Clock
1. With both AUTO and RUN switches set to the central
position, press R reset button, the display will flash.
2. Set RUN switch to .
3. Set day of week by pressing button DAY.
4. Set time of day by pressing buttons HR and MIN.
5. Set RUN switch to the central position, colon will flash, this
indicates the clock is set.
With the clock set, the factory preset programme shown below
will operate.
4956
MON/FRI
ON -06:30
OFF -08:30
ON -16:30
OFF -22:30
SAT/SUN
ON -07:00
OFF -09:00
ON -16:00
OFF -23:00
Setting Timed Programmes
With the clock set to the correct time, see SETTING THE
CLOCK paragraphs 1-4, and then continue as follows:
1.Set RUN switch to P , the display will
indicate the 1st (ON) preset programme and the
symbol
2.Set day of week to be programmed by pressing the
DAY button.
Note. The days can be selected individually or
as groups:
Mon-Fri., Mon-Sat., Mon-Sun., Sat/Sun.
An arrow will be displayed under the day or
days selected.
3.Set time of day by pressing the buttons
HR and MIN.
4.Press button P to confirm programmes, the
display will indicate the 2nd (OFF) preset
programme and subsequently, 3rd, 4th, 5th, 6th.
7th, 8th to 16th.
5.Repeat procedures 2, 3 and 4 until desired
programmes are set.
Note. It is not a requirement to use all of the 8 on
and 8 off programmes.
6.Set the RUN switch the central position, your
appliance will now operate at the programmed times.
General Notes:
With the AUTO switch in the I position the central heating will
operated constantly ON.
With the AUTO switch in the O position the central heating will
not operate.
Soft Override button indicated by the symbol
function will override the current central heating programme for
the next available.
ON time programmes are indicated by the symbol
.
, this
.
Diagram 3
5221854B
145
1 Installation Instructions
373
208
520
9053
101
CONDENSATE
SIPHON
Condensate Drain
Connection
140
INSIDE WALL
FIXING FACE
140
CAP
1.1 Installation
Where no British Standards exists, materials and equipment
should be fit for their purpose and of suitable quality and
workmanship.
When installing the appliance, care should be taken to avoid any
possibility of personal injury when handling sheet metal parts.
The installation of this boiler must be carried out by a competent
person in accordance the rules in force in the countries of
destination.
Manufacturer’s instructions must not be taken as overriding
statutory requirements.
1.2 Gas Supply
This boiler is for use only on G20 natural gas.
The gas installation must be in accordance with the current
issue of BS6891.
The supply from the governed meter must be of adequate size
to provide a steady inlet working pressure of 20mbar (8in wg) at
the boiler.
On completion, test the gas installation for soundness using the
pressure drop method and suitable leak detection fluid, purge in
accordance with the above standard.
1.3 Data Label
The data label is on the base panel inside the appliance.
1.4 Electrical Supply
The boiler must be earthed.
All system components shall be of an approved type and all
wiring to current I.E.E. wiring regulations.
The boiler must be connected to a permanent 230V ac, 50Hz
supply.
Connection of the whole electrical system of the boiler, including
any heating controls, to the electrical supply must be through
one common isolator.
Isolation should be by a double pole switched fused spur box,
with a minimum gap of 3mm for both poles. The fused spur box
should be readily accessible and preferably adjacent to the
appliance. It should be identified as to its use.
118
33
890
C
L
BOILER
REFER TO THE WALL TEMPLATE
FOR PIPE DIMENSIONS
Diagram 1.1
Alternatively connection can be made through an unswitched
shuttered socket and 3A fused 3 pin plug.
The mains supply cable and other cables connected to the
boiler must be the PVC flexible type of at least 0.75mm
0.20mm).
The colours of three core flexible cable are, blue - neutral,
brown - live, green and yellow - earth.
The wire coloured blue must be connected to the terminal
marked “N” or “Black”.
The wire coloured brown must be connected to the terminal
marked “L” or “Red”.
The wire coloured green and yellow must be connected to the
terminal marked “E” or “Green” or the earth symbol
.
2
(24/
1.5 Condensate Drain
A plastic drain pipe must be fitted to allow discharge of
condensate to a drain.
Condensate should, if possible, be discharged into the internal
household draining system. If this is not practical, discharge can
be made externally into the household drainage system or a
purpose designed soak away, see section 9.4 for more details.
1.6 Boiler Efficiency
The Seasonal Efficiency Domestic Boilers UK (SEDBUK) is:
Energysaver Combi 2-80: 90.6%
Energysaver Combi 2-100: 90.1%
The value is used in the UK Government’s Standard Assessment
Procedure (SAP) for energy rating of dwellings. The test data
from which it has been calculated has been certified by Gastec.
IP classification IP40
Internal Fuse rating1) Type2AF
2) Type2AF
3) Type3AT
● Ball valves are fitted in water and gas connections, plus a drain point on all water connections.
■ For larger systems use an additional expansion vessel.
7221854B
2 Boiler Position
2.1 Location
The boiler is not suitable for fitting outdoors.
Any electrical switch or boiler control using mains electricity
must be positioned so that it cannot be touched by a person
using a bath or shower.
The boiler must be mounted on a flat wall which is sufficiently
robust to take its weight, refer to Table 2.
2.2 Clearances
The boiler should be positioned so that at least the minimum
operational and servicing clearances are provided, see diagram
2.1.
Additional clearances may be beneficial around the boiler for
installation and servicing.
For flue installations where external access is not practicable,
consideration should be given for the space required to insert
the flue internally which may necessitate clearance larger than
those specified in diagram 2.1.
9070
5
5
*
† 600
200
*
5
*
5
Increase to 25mm clearance from
combustible material.
*
† A removable compartment door can be
placed at least 5mm in front of the appliance.
Dimensions in millimetres
MINIMUM CLEARANCE FROM
PERMANENT SURFACES
25
200
Diagram 2.1
221854B
8
3 Flue Location and Ventilation
3.1 Flue Position and Length
There are several flueing options available for the Energysaver
Combi, e.g. horizontal, vertical and twin flue.
The standard horizontal flue is fitted onto the top of the boiler
using the flue elbow.
See diagrams 3.1 to 3.3 to determine whether a standard flue
can be used.
The standard flue can be extended using 1m long extension kits
and 90° elbows. A maximum of 3500mm of extension pipes plus
3x90° bends can be added to the standard horizontal flue
length.
When extension pipes are used the flue system must be
designed to have a continuous fall to the boiler of at least 2.5°
to allow condensate to run back into the boiler and out via the
drain.
3.2 Internal Flue Installation
The flue can be installed from inside the building, when access
to the outside wall face is not practicable.
3.3 Terminal Position
The minimum acceptable siting dimensions for the terminal
from obstructions, other terminals and ventilation openings are
shown in diagram 3.4.
The terminal must be exposed to the external air, allowing free
passage of air across it at all times.
Being a condensing boiler some pluming may occur from the
flue outlet. This should be taken into consideration when
selecting the position for the terminal.
Car ports or similar extensions of a roof only, or a roof and one
wall, require special consideration with respect to any openings,
doors, vents or windows under the roof. Care is required to
protect the roof if made of plastic sheeting. If the car port
comprises of a roof and two or more walls, seek advice from the
local gas supply company before installing the boiler.
If the terminal is fitted less than 600mm below plastic guttering
or less than 450mm below painted eaves or a painted gutter, an
aluminium shield 750mm long should be fitted immediately
beneath the guttering or eaves.
WALL THICKNESS 'X' = 75 TO 554mm
"X"
REAR FLUE - STANDARD
DISTANCE 'Y' = 307 TO 755mm
Diagram 3.1
6501
6502
DISTANCE 'Y' = 393 TO 755mm
6503
"Y"
SIDE FLUE - STANDARD Left
Diagram 3.2
"Y"
SIDE FLUE - STANDARD Right
9221854B
Diagram 3.3
3 Flue Location and Ventilation
A
A
F
G
E
A
G
G
G
B,C
B,C
F
F
K
K
K
C
G
L
L
UNDER CAR PORT etc.
H,I
J
D
F
K
3.4 Terminal Guard
A terminal guard is required if persons could come into contact
with the terminal or the terminal could be subject to damage.
If a terminal guard is required, it must be positioned to provide
minimum of 50mm clearance from any part of the terminal and
be central over the terminal.
The guard should be similar to that shown in diagram 3.5.
A suitable guard can be obtained from.
Tower Flue Components
Morley Rd.
Tonbridge
Kent
TN9 1RA.
Their Reference CGD K3 BL.
3.5 Timber Frame Buildings
If the boiler is to be installed in a timber frame building it should
be fitted in accordance with the Institute of Gas Engineers
document IGE/UP/7/1998. If in doubt seek advice from the local
gas undertaking or Hepworth Heating Ltd.
3.6 Room Ventilation
The boiler is room sealed, so when it is installed in a room or
space, a permanent air vent is not required.
3.7 Cupboard or Compartment Ventilation
Due to the high efficiency and hence low casing temperature of
this boiler, cupboard or compartment ventilation is not necessary.
TERMINAL GUARD
Diagram 3.5
M
2816
MINIMUM SITING DIMENSIONS FOR
FANNED FLUE TERMINALS
POSITION
MM
A DIRECTLY BELOW AN OPENABLE
WINDOW, AIR VENT, OR ANY
OTHER VENTILATION OPENING300
B BELOW GUTTER, DRAIN/SOIL PIPE75
C BELOW EAVES200
D BELOW A BALCONY OR CAR PORT200
E FROM VERTICAL DRAIN PIPES AND
SOIL PIPES75
F FROM INTERNAL CORNERS300*
G ABOVE ADJACENT GROUND OR
BALCONY LEVEL300
H FROM SURFACE FACING THE
TERMINAL600*
IFACING TERMINALS1200
J FROM OPENING (DOOR/WINDOW)
IN CAR PORT INTO DWELLING1200
K VERTICAL FROM A TERMINAL1500
L HORIZONTALLY FROM A TERMINAL 300
M FROM EXTERNAL CORNERS300
Diagram 3.4
221854B
* It may be necessary to increase this dimension to prevent
staining of adjacent walls depending on weather conditions.
10
4 Heating System
4.1 General
The boiler is for use only with sealed central heating systems.
The safety valve is an integral part of the boiler and it cannot be
adjusted.
A pressure gauge is incorporated on the boiler control panel to
indicate the system pressure.
The circulation pump is integral with the boiler. The Combi 280 is fitted with a UPS 25-50 pump and the Combi 2-100 is fitted
with a UPS 25-60 pump. Performance curves for both pumps
are shown in diagram 4.1.
4.2 Expansion Vessel
The boiler has an integral expansion vessel with a capacity of
7 litres (1.54 gallons), with a charge pressure of 0.5bar.
The maximum heating system water content using the fitted
expansion vessel is 130 litres at an average temperature of
O
C, and charge pressure of 1.0bar.
75
4.3 Flow Rate
The minimum flow rate through the boiler is 1053 litres/hr for
ES80 and 1230 litres/hr for ES100. This is equal to 20
differential at maximum heat input.
The system can be fitted with a lockable balancing valve if
necessary in the main flow or return pipes shown as valve "A"
in diagram 4.2.
O
4.4 Bypass
The boiler is fitted with a manual bypass, see diagram 4.3. This
valve may be adjusted by the installer if necessary to ensure at
least 1053 litres/hr for ES80 and 1230 litres/hr for ES100 flow
through the boiler. The boiler is supplied with the bypass open
by approximately half a turn and is closed by turning the white
screw clockwise. However for systems completely fitted with
thermostatic radiator valves or systems of high pressure loss an
additional bypass valve must be fitted to the heating circuit to
ensure that under no circumstances does the flow rate drop
below this level.
An additional bypass valve “B” is shown in diagram 4.2.
4.5 Filling Sealed Systems
Provision for filling the system at a low level must be made. Two
methods of filling are shown in diagram 4.4. There must be no
permanent connection to the mains water supply, even through
a non-return valve.
C
Diagram 4.1
9078
11221854B
4 Heating System
METHOD 1
METHOD 2
SUPPLY STOP
VALVE
SUPPLY
PIPE
HOSE
UNIONS
SERVICING
VALVE
TEMPORARY
HOSE
HEATING
SYSTEM
HEATING
SYSTEM
TEMPORARY
HOSE
HOSE
UNIONS
SERVICING
VALVE
SUPPLY
PIPE
SUPPLY STOP
VALVE
DOUBLE CHECK
VALVE ASSEMBLY
COMBINED
CHECK VALVE
AND VACUUM
BREAKER
C
C
4.6 Water Treatment
For optimum performance after installation, the boiler and its
associated central heating system should be flushed in
accordance with BS7593:1992 using a cleanser such as Sentinel
X300 or X400, or Fernox Superfloc.
For long term corrosion protection, after flushing, an inhibitor
suitable for aluminium heat exchangers should be used.
Examples are Sentinel X100 and Fernox Copal.
DOMESTIC
WATER
BOILER
HOT
COLD SUPPLY
OPTIONAL FILLING
ARRANGEMENTS,
SEE DIAGRAM 4.4
C
4.7 Draining Tap
A draining tap must be provided at the lowest points of the
system, which will allow the entire system to be drained.
The flow and return isolation valves are provided with drain
points for boiler heat exchanger drainage, see diagram 8.1.
7265
ADDITIONAL
EXPANSION
VESSEL
(if required)
HEATING
CIRCUIT
MANUAL
BYPASS
VALVE
OPTIONAL
BY-PASS
VALVE
RETURN
'A'
FLOW CONTROL
VALVE
'B'
DRAIN
POINT
Diagram 4.2
Diagram 4.3
7266
6597
Diagram 4.4
221854B
12
Loading...
+ 28 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.