Glow Worm Capricorn 240/6 INSTALLATION AND SERVICING INSTRUCTIONS (206300/1/84)

Page 1
Glow-worrn
I
gas
To
be
with user,
left
or
meter
20630011184
c
GAPRICORN 24016 Gas
with
either
Glow-worm
Back Boiler
G.C. Numbers:
240
Boiler Unit
Fire Front
-
M31526 246
Unit
-
3731406
Boiler Unit
:
-
240
M31525
Fire
Front
or
246
Page 2
SPECIFICATION
1
INSIDE DIAMETER
OF SOCKET
t.^^l
i
-1
9?=2-TT
(16i in)
t
Units
Boiler
246
and
24O
jector Furigas
In
mm diameter
1'6
240
mrn max
1.84
Input
Output
Hot
Setting Pressure
kw
Btu/h
kW Btu/h
m.bar
in. w.g
1
40,400
8.79
30.000
9.9
4.0
holes
5
Boiler
15.56 53,100
11.72
40.000
16.3
6.5
246 Boiler
17.9
61.000
tJ.c
46,000
14.1
tl
I |
I
.t
in)
8as
re
I
I
I
I
mm
512
(221
NOTICE
orily
kw
Bru/h
m'bar
In.w.g
I
I
252mm
(9il'n)
.
I
I
I
2za
(ei:
IMPORTANT natural
gas.
other
cAPRTCORN
Fire Unit
In,iectot
Input
Serting
ressu
P
in)
This CANNOT
arrd
240/6
appliarrce
Cat.
Bray
5.Y
20.000
1
9.4
7.8
Diagram
is
used
b€
No
28
for
use
on
200
1
on
anY
Page 3
INSTALLATION
_
SITING
2
2.
2.I
REQUTREMENTS
SrrE The
together delivered
The boiler body and base are
.
That is a clear
Glow-worm
with a 240
on site
pallet, the
THE BUILDER's For all types
requ.ires a standard opening, irrespective surround
plan deep
It builder's opening is cleared debris
Satherins chimney (36in)
The required
water
prepared
prepared hor
the boiler
assembly in a second contairrer.
Iire
or mounting
580mm inclusive
is important
above
(and
izont
12231aiil
(mortar,
into
is at a minimurn
the
gas
as
back
a l.
CAPRICORN 24016
246
or
as three
controls
OPENING oI installation
sized
of the
used.
brickwork
wide
plaster
ol
that the back etc.) and that
the 229nrm x 229mm
hearth
holes
pipe
suggested
boiler base
level.
Ior all heating, domestic hot
where
back boiler unit are
separate
in one contairer
builder's
oDenins
'x
linish.
applicable)
in diagram 2. The
packages.
packed
the appliance
type oI fire
measurinq
3)"9mm
wall
any
of
the
(9in
height
must
of 9l4mm
be
lire
on
and
brickwork
(la
llgin)
of the
adhesive
aclual
x 9in)
should be
and
flar
in
229t229mm
(9x9in) CH IMNEY
MINIMUM
9mm
a
PLASTER
GAS
(51
in)
in)
mm(1
14mm
:,
(
in)
36 MIN.
l- l-
I
t:
t_ l:-
_r_
Drmensions N.B.
minimum
to covering has
+This
is
25
38 mm(ll
(141
to C.P.
'Minimum
clearance after
been
rninimum
the
in)
in)
403.
1947
dimension.
This
carpet
fitted
drmension
f rom the
FINISH
FIRE CASING
IN
OPEN
560 mm
(22in)
TO
in)
any
(231
i1'10
(al
reiers
f loor
lloor
590 mm
158mm
*
(6*
dimension
or
G
in)
mm
in)
2.2
NOTES
2.2.1 All a
All approved type with
2,2.2
2.2.) cistern 27 metres in
2.2,4 connections rhrough a 3 amp switch
and 3 amp cable having must
2.2.' NlUsT BE INSTALLER WITH THE CAs SAFETY RECULATIONS.
electrical
qualified
external components
l.E.E. Regulations.
the
Electrical
This boiler
water
the
system,
The appliance must
or spur box, of
a temperature
be used
THE INSTALLATION
THE
wiring
electrician.
and
supply
shall only
supplv
(ninety
to the mains
fused 3-pin
at least
lor
CARRILD OUT
AND
RELEVANT
shall be
240V.,
*,ith
feet)
lused
or a
.3
rating
wiring
all
IVIUST
must be
and have an
amp
shall be
u'ired
3A-, 50H2.
be
head
a
be
supply musr
double
shuttered socket
plug,.
(1610.20) oi 90 " C minimum
to
OF
THIS APPLIANCE
BY
BE IN
REQUIREI\4ENT5
BUIL DIN C RECULATIONS,
RECULATIONs, THE THE LOCAL AUTHORITY, THE LOCAL RELEVANT STANDARD CODES PART PART 2: 1976, BS : 1979
2.2.6 care of sheet injury.
}
and
Vhen
should be taken when
metal
WATER
RECO.\IMENDATIONS
l97lr, BS
85 5871
irstalling
parli,
LOCAL
THE
UNDERTAKINC
OF PRACTICE 5440 PART J4rl9
PART l:
: 1980.
servicing
or
to avoid
hardling
carried
in
connecteo to a
not exceeding
earthed, and
pole
Heat
the control box.
A
ACCORDA.NCE
out by
of the
accorCance
vent
open
isolaring
outlet
resistant
capacity
QUALIFIED
OF
LOCAL
r.E.E.
GAS RECION,
BYELAWS
OF
l:
1978,
1977,
this appliarrce,
any possibility
the edges
OF
AND
BRITISH
CP33I 85 5qq0 85 5545
be
oI
Builders in be either lllustration for wall
2.3
TYPES OF FIXINC
2.3.1 surround).
The builder's still
58Omm *'hich height
the
up 10 the two sides
J30mm x J90mm
decorations can be
of the
olate
brickwork
the breastwork
right- hand or
Vall
Mounted
apply. The frontal opening
wide
means
builder's
is recuired.
x J90mm that
oP J90mm
opening,
opening, no lurther
opening
for
mounling onlY.
openinB
(which
pipes
lef
hand side).
t-
(that
dimensions
high,'
a lintel
QJllqiil
and
and toP
frontal
taken
showing
is,
Q2Tlu
must
above
the
right
register
may
wall
access.
uP
mm
457
(18 in)
access
Diagram
without
given earlier
required
23llain)
t
be iixed
base
the
is
Plastered
forc.r rhe
to
the sicies
to
or closure
2
tiled
is
at a
of
\'all
Page 4
trvSralunoru
fz
-
srrrruc
J
of
ln
carpet
for Iloor height level
l58mm underside Iloor covering, heating of f
A insulating conductivity minimum dimensions and 300mm may be fitted 50mm bottom ef the fire
2.3,2 The
surround All
important therefore of boiler flue. lt must
The minimum surround is hieh. The
58-0mm
The nrenered hoiler
opening surface oI the hearth of 2l mm
plinth to
type
rhis
the floor
reason it is necessary to arrange
this
the
of
lOmm
oI I
to
allow
(51/ein)
of the Iire
abric.
hearth
Tile
appliance
tile surrounds
the existing surround
th€
manufactured material with
o{ 0.1
(t2in)
(2in)
exists between
Surround Fixing
hearth
and
too !ar
406mm
1223/ain)
frlUST
113/15in)
hearth.
the
installation it is
directly
builder's openinq at
(q3l8in)
necessary
the
irom lioor level
casing, aller carpet
been
has
carpet or unprotected Iloor
from a
0.12 Wm/'K
to
700mm
of
deep x
provided
can
forwards so that it fouls
also
opening reguired
maximum oDeninq
wide
be
rhat
plinth.
be
installed with the tiled
position.
in
vary
to check that
have
a
(l6in)
x
59bmm-(21'llsin) high.
base of
with,
level
to
f rom
thE bottom
See diagram
guite
below the fire,
a5ou" room floor minimum
litted, to avoid
a maximum rherma,l
l2.Jmm
a
the
in dimensions,
does not bring the
face.
flat
wide
or
give
normal
a mihimum
height of
fireproof
and
.
I
l2ifi
127
(l/2in)
gap
oI
hearth
the
the tiled
in
x
550mm
permitted
th€ builder's
above, rhe top
a minimum
oj the J-ire
3.
to and the
the
to-
or
over
and
with wide
rhick
least
at
the
and
ir is
thickness
the
(22in)
is
gap
AIR
EXISTING
FLUE
BRICK
]:J
FLU€
LINING
I
I
SPACE
SEALING
CLAMPING
ANO
PLATE
2.3.) A minimum
z.tr THE FLUE
2.q.1
2.4.2
2,4.3
between
exist lixture.
general
The
should be observed.
centra.l heating boilers
diverter combustion performance conditions in that the flue installation, least 2,5m connection on
thoroughly British
(5in)
directly boil
must be proprietary
used.
products
An
existing
Cas approved
dia.
into the flue
er.
The
termination
(5ee
distance
the
recommendarions
the back
on
the chimney
llue be an
with
(8.2
the
swept and must
which
adequately
must
fittings
diagram
of l50mm
side of the
In
the iniegral draught
boiler
Ilue. lt is
efficient
to
ensure a trouble-free
an
equivalent heighr
1r) measured
appliance.
brick
oI the
appropriate
chimney
liner
be
connected and sealed
outlet
liner
sealed
3).
fire and
of
commcn
unit makes the
inCependent
ventilator
Jrom the llue
be
lincd
sleeve oi I27mm
socker of
ar chimney
and
c.lamped,
to the
(5in)
BS
54a0:
with
essential
for
musr
*,irh
flue
musr
any
all
of
rhe
of at
be
the
top
using
liner
APPROVED LINING
level
WITH
Heaith
MINIMUM
mm
2l
(H,n)
EXISTING
I
a
Boiler base MUST NOT
be below
FLUE FITTED
hearlh
Diagram
3
Page 5
DRAINING
2.7
INSTALI.ATION
_
SITING
2
o
2.4.4 THE
EXISTINC FLUE MAY
COMPLETELY SOUND.
DOUBTS IN THls RE5PECT, SEALINC THE BASE
LINER. POSSIBILITY FLUE,
THROUGH THE
DEBRIS
BETTER POSSIBLITY
DIACRAi\I
2,tl.,
A new.ly built moisture pipe,
the Brrilr{inp Reorrlglign5.
ln
rhe recommended possibly Iixed nrade good with chimney
(See
MUST BE
OF THE
CARRIED OUT
CHIMNEY AND THE FLUE
THIS WILL
OF
CAUSINC EXCESS
SEALINC PLATE
FALLINC,
resistant .lining,
of an appropriate
case oi
flexible metallic
.and
liner and parged with
diagram 4).
LEAKACE TO
THE APPLIANCE.
INSULATION, REDUCING
].
rhat a
sealed ro
AND CIVES
OF
chimney
a'salt-glazed'lined
shorr length
approved packing
CON
diameter
rhe
Diagram
OVERCOIVIE
TO
AIR
DENSATION.
can
such as
as described
'boiler
ADDTTTONAL
PREVENT
AN
ADJACENT
TO BE
ALSO
THE FLUE
be
lined
salt
as speciiied in
of ilue
Jlue
fire
PREVENTS
4
NOT
BETWEEN
Ilue,
BE
ANY
THE
DRAWN
THE
sEE
with
glazed
it
pipe,
above, be
socker,
rhe
into
cement.
a
is
Key operated taps
in
accessible
emptying of the system,
under doors etc.
SAFETY
2.t
When
fitted it
on the flow
iso.late the valve intermediate
2.9 BOILER The
boiler body
on
each side.
z.to
ias
conNecTroN
The
8as
recommendations The gas
enough other doubt, consul
lf hand should be
Ij previously gas protected. PVC
Your
ro supply the boiler, toSether
gas
ted.
the gas supply
side
the builder's opening and
supply
tape.
local Cas
positions
VALVE
should
pipe. cock.
CONNECTIONS
has two
installation should comply
supply
appliance connected to
your
laid
used
of CP
local Cas
of the
belore
with
pipe
within
A
suitable
Region wil.l
and meter should
2E79
BS
to
to
be adjacent to
lt should
{rom the
is entering {rom rhe right
appliance, the
the
a
solid
rhe opening
method
should
facilitare
except
not be
(1"
Rpl
)31, Parrs 2 and 3.
Region
boiler
fuel appliance, rhe
is to
advise.
be
fitted
complete
small
boiler by any
B5P) tappings
lhem. If
gas
positioned.
is
flue
dips
boiler
the
possible
with
rhe
be
large
with
any
should be
supply
were
should
wirh
wrap
to
in
be
2.4.6 All approved be pleased
2.' ROOM It
appliance ro A
(l?int) direct
space with
ellective area. The be located nuisance
2.6 HEATINC The
be in Pt. l. water
circuit,
indirect. direct
llues must
rerminal. \'our
to
VENTILAT]ON
is
important that
is Iixed
ensure
pelmanent
correct opera!ion
should
with
(such
permanent
a
to occupants
sYsTEM
design
and installation
accordance with
When
system combined with
the
The
domestic hot water
terminate
advise.
must
air vent
be
fitted.
outside or
as a hall) which
in a
used
hot
boiler
local Cas Region
rhe
have adequate
of
efJective
with
air vent
permanent
position
due to draughts
British
ro
supply a
water
should never
system.
in a British
room in
of the may
It
an internal
oI
cylinder
communicate
is
itself oi
air vent
which
the
system
Standard 5q49
domestic hot
a central
be
which
in.lets
air
appliance.
77cml
area
room or
provided
the
same
should
minimises
should
heating
must be
used on
Cas will
the
a
('
Page 6
2 INSTALLATION
_
BOILER
FIXING
FLUEWAY
2.1'
BOILER
It
is assumed
been prepared
2.ll.l
IMPORTANT.
chamber ?sqembly
the boi-ler the
two
securing
BAFFLE
FIXING
that the
as
front
from
from
slotred
ir to
the
described
Remove
cover
the
boiler
the
wood€n
hex. head
boiler,
builder,s
previously,
the
and
extensim
body
pallet
screws
Diagram
opening
combustioo
before
by and
Diece
taking
removin[
washers
5
has
2.1t.2
2.11,)
2.11.4 .the
2.11.,
The used
.
2.11.6 boiler
Remove
assembly Check
dislodged top of a
hand
diverrer.
position, gas
thc boiler. remove steel phial poZket,
metal
M6 shakeproof washers. through the
(See captive
channel Iace
overhangs 3rnm,
lrom its
that
in transit, and is still sitting in the
the boiler,
up and through
(See
Place
centrally in the builder's opening. The
fire
flue ofltake should
the
angled
Rawlplugs. Attach
top
of
x l2mm
the
nut
and shakeproof washer
diagram 6).
nuts
and
of the
Check
the
as
shown in diagram
gas
fire support
to lijt
Offer
flue
the boiler body
packing.
the {lueway ba{lle has not been
this can be
diagram 5).
boiler
the
From the formed steel
template and
l/2in
BSP
gas
the
gas
rhe
Ilue duct into
flue
the
one
ourlet, mark
fire
lg. hex.
are on
that it is
that
front
Insert
Make
duct.
the
face of the
boiler.
end of rhe
rhe
lront
channel should NOT be
the rear of the
{ire
done
in
not
assembly
fire
channel,
plasric
piug,
support channel to
duct using rhe
tlue
hd. screws,
the
the sure that the two
front face
parallel
face
5.
flue liner inro the
off
and
and base
by inserring
drau6ht
its approximare
be
bag
scre*"s,
screws
channel so
are uppermosr.
with
of
f.lue
ro
used
container
the
sheet
containing
nuts and
nurs
upward
of
the lront
the channel
duct
pierce
three
lift
two
and
rhar
the
by
ANGLE
TEMPLATE
USEO IN
SHOWN
COM
woooscREW
PLAIN
WASH€R
POSITION
EUSTION
CHAM B
FRONT
COVER
11
rp
I
€R
)--.
RAWLPLUG
DJUSTING.
scREw
CUT.OUT FCR MAINS
'\
CAELE
GAS FiRE
CHANNEL
POSITIONS
SUPPORT
CABLE
CLIPS AT
FIXTNG
MARKEO
Diagram
A
6
Page 7
HEATING
RN
F ETU
E>
THERMOSTAT PHIAL
POCKET
DOM ESTIC
WATER
HOT
FLOW
rr>
DOM ESTIC
HOT WATER
RETURN
+r
FLOW
<r
THERMOSTAT
PHIAL
POCKET
,.-1
I
I
t--
,t9
;l-:
;L
;--1
./tl<r
-ElJ
\
._
RETURN
PUMPED
to
holes then
leaving )25ni at chimney top
(See
?.I1.7 Ri-fit
temporarily screws
2. I l.E OiIer diagram 6, correctly a.ligned plastered wall wiil Jitred in
2.1lr9 base, lront rhe
2,I
l.l0
adjusting the gas chamber width,
Levelling and by packing, up the Iurther packing required, oI
2.ll.ll builder's drill side Rawlplugs, hearth
washers
NOTE:-
this completing time earlier, mis-aligned.
suit
fit the fiue
the
12gll2iil
diagram
and
ensure
the correcr position.
Pack
boiler
Af
ter positioning
fire
extension,
with
should
screws with
the boi.ler
Ensure
opening.
through
of
the boiler
with
provided.
There lixing
10
time with
to
HEATING WITH
the
setscrews
Iiner into
lower
_
3).
the combustion
with
washers up the
so
that
under rhe
or
is
located
screws
support plate
the base
screws
only be
as
it must
base.
that
and
the
should
to allow
the
see
Correct
pierced
above hearth
and
trim
the two
previously
angle
that
to the iinished
surface
the
rear
as
in the
shown
front
of the builder,s
are
used after
required.
the locknuts
up
be
Jirred under the
rhe
With
the
holes
firmly
2in
x
be
installation.
the template,
that
the boiler
GRAVITY
in
end approximarely
oli any surplus
chamber
slotted hex.
template,
the
fire
or
tiled
ga's
fire rear
width
iull
required, to ensure that
correct
boi.ler,
the
in
diagram 5
and
to
rear and
for fire
When
at the
boiler
the in
base
final
as necessary.
the brackets each
to
secure
No. l2
suf f
icient tolerance in adjustment prior to
HOT
WATER
the Ilue socket,
the chimney
level,'make
Jronr
removed.
as shown in
support plate is
face oi
surrounC.
boiler
support
Iront or
is
boiler
take the metal
the base ro
wood
Re-check
has
panel
of
the boiler
position.
use
the level
to aJign
combusiion
across
opening.
purposes
levelling boiler
adjusted, lock
provided.
rear
Iull
central in
position,
in
screws
as
described
not become
gooi
liner.
cover
head
the
This
the
width
the
rhe
and
from
PUTvIPED
2.ll.l2 rhe Ilue socket, secure with
2.12 VATER Fil
'
required All
installed IT 15 SER\I'CE COMBUSTION CHAMBER FLUE THE
is
lJ is
SERVICING IMPOSSIBLE. No pipework
draught diverter, rhe BSP of the system, water leakage. All opening should merhod
2.13 PUMPED
VATER
It
is
diagram 7 is
being must
as
the may be fitred on opposite sides ro but including
2.14
PUMPED HEATING AND
Where boiler,
litted on the
is made all connections diagram opposite side same relative thermostat
2.1'
CIRCULATING
The Jlow Jrom the boiler.
HEATING AND HOT
Fit
the lower
cement.
Jire
CONNECTIONs
phial pocket
positions.
u'ater pipes
(see
EXTREMELY
PIPES
COLLECTOR,
REMOYAL
ptug
in rhe
is to
important that
prepared.
be
iitted into the same side
heating
always in
the
single
the thermos'ta!
(5ee
7.
phial pocket.
pump
should
5ee diagram
to the
diagram
CRO55
OF THESE COYERS
should
boiler
then
be protected.
wrap with
HEATINC
adopted
The
flow connect.ion.
ihe
thermostat
and return is
tlow
same diagram
are made as illustrated
The connections
that shown,
to
PUMP
preferably be
WATEB
Diagram
end of the Ilue
with
setscrews
|
/zin
and
7). IMPORTANT
THE FRONT
A5
obscure the
phial pocket, or the
body,
Iill
pipes
PVC tape.
WITH CRAVITY
the scheme
when
therrnostat
sarne re.lative
phial
phial
side as
7).
positions,
B'5.P.
7.
boiler
FRONT COVER THIS
and
can
WOULD MAKE
botrom of
Flush
venl.
within
lt
the
A su-iiable
illustraied
the connections
HOT
the flow
phial
of the
connections
The
that shorvn,
pocket.
WATER
taken
pocket
is important
be
may
but
always
including
fitted
7
liner inro
and seal
in
PIut
be
no\\'
THAT NO
OF THE
AND
FOR
.the l/2"
whole
the Check Jor
iireplace
HOT
in
are
pocket
borler
positions,
the
Irom
be
must
connection
that
on
Jirted
in the
the
rhe
in
in
Page 8
2 INSTALLATION
?
zoo
*
]
180
E
r60
I
tr
140
E
o
)
100
u
A80
tn U
_
r60
l,40 =20
400
WATER FLOW
600 800 1 000 1 200
BOILER FIXING
(litres/h)
r-
I
BOILER
ONLY ON
2.16
2.17
--ll<-3
Check
broken.
CONTROLS
that the
mm
BOI LE R PI LOT IGNITION ELECTRO D
Ilue
seal has not been
E
Diagram
8
l liil
Z\\il \NZl
ii
support previously electrode
(5ee
bracket
Diagram
with
removed.
position
8).
BOILER
FIFE ON
AND
I
I
I
i I
I
I'
I I I, I
I
i
I
I
I
Diagram
the two hex. hd. screws
Check the boiler ig,nition
relative io
the
pilot
o
9
burner
Remove wasfrers
cover
boiler body and
2.17.1 Remove from its screws holding the strap bracket. burner studs hex.
valve
boiler
the support damage
that
the
the
securing the
and extension
packing
the
to
Place the
support tray
in the boiler
provided.
nuts
assembly and place
base,
location
tray.
the the burner bars assembly
two slotted hex.
the
entering the
hole at the
pilot
combustion
remove the
electrical
to
piece
controls and burner
and unscrew
burner
base.
Take
burner
the
supply
control box
electrical
assembly
Secure
Take
burner
rear
care not
or electrode. Ensure
are
horizontal
electrical control box
hd. screws
chamber lront
assembly
cover
assembly.
the two hex. hd.
controt box and on to
the burner
position
in
assembly
pipe
securing
th€
with
stub end
of tl-€
to
disturb
then secure
ano
to th€
support
two
the M6
gas
and
in the
into
burner
or
I
2.17.2 and connected to packed
Assemble th€
position shown
union nut. The care
pipe this
2.17.3 and extension assembly, ensuring seal between the cover with previously
2.17.4 'OFF'position
gas
gas service
The
within
loose
being taken
does
not
may
cause
Re-fit the
the two
Ensure tf€t the
soundness.
M6 hex. hd.
removed.
pipe
run
the union
the Iire assembly carton. to the
cock
diagram
in
service can
to
impose
mis-alitnment in
combustion
(5ee
ensure
strain
and the boiler
gas
service tap
diagram
now be
can
gas valve in
l2 and tighten
now be
that the service
upon the
chamber
screws
9)
which
cock
connected,
union as
build-up.
the
front
an airtight
washers
and
is in
and check
made
is
the the
cover
base,
the
!or
Page 9
INSTALLATION
-
ELECTRICAL
3
CABLE CLAMP
looking directly
View
into
up {rqn urderneath
the
control
box
CONTBOL
BOX
COVER
KNOB
3.I ELECTRICAL Route
external
NOTE: fire opening. i.e. rhe a
cable coming opening, run the cable hot
surfaces
the
combustion
6). rrsins the three
v,'
vJrIlo
at the A the bottom
(see
3.1.1 by
).1.2 Remove the two
shakeproof control
3.1.3 through the iower Slacken o{f the screws clamp, and connect terminals
ll.
ciamP.
positions marked
cable
opening should
diagram 6).
Remove
pulling
Bring the
Tighten the screws holding
VIRINC
wiring
The mains
supply from within
right-hand side
box and remove
pass
IJ
lrom
by leading
chamber
entering from the
boiler
the
from its spindle
washers
mains
th€ mains
the three wires
in
the
the
to
cable
concealed
the left-hand
cahlc clinq srrnnlicrl
pass via
Pozidriv
securing the
cable into the control
grommet
terminal
conlrol box.
must
not cross
wiring
the
safely away it across the
extension
'A'.
righr-hand
the
oJ the
thermostat
(See
pan
the cover.
in its rear
holding
cable through the
strip. See
is required,
opening, for
fire
side of the
(see
cut-out at
extension
control knob
diagram l0).
M. screws and
cover to
mains
tfre
to
the
the
mains
appropriate
from
front of
diagram
to Iix
side
piece
surface.
cable
clamp
diagram
cable
the
the
of
the
the
box
Diagram
it
10
Page 10
3 INSTALLATION
-
ELECTRICAL
TRANSFORMER
GAS VALVE
3.
l.q
Complete leading all diagram ll control box boiler
thermostat
Reconnect
the
and
3.1.5 pocket. the
The
verlically
horizontally
NOTE: When
the capillary as shown
provided.
gas valve
Fit
the
Ensure
pocket
capillary should
down
lelt-hand side,
the
cables
and
the ignition
boiler
and retairred
along
remainder
in
schemes
cover
and
conrrol knob
leads
thermostat
that it
the
the base
the
thermosrat
in
side of rhe
through
I
screws,
lead to the
is
with
be
unir,
roure
diagram
LU
z o
THERMOSTAT
of
the grommets,
6,
to
then push
on to
to
the
6,as
phial
into
inserted
the
boiler
phial
and 12,
fix
using
positioned
wirinp,
the replace rhe
ils soindle.
piezo
unit
val.re.
phial
the
lully
into
provided.
pass
to
and then
is
fitred on
secure
the
clip
sei
the
the
RANG
O
z
3
E.
0V 50Hz MAI
E
LU
)
J
G__$_
)
STUD
EARTH
ING
z
TO GAS
(IF
APPLICABLE)
FIRE
Diagram
11
3.3 PRELIMINARY
At
this be and resistance British
stage
carried
Cas
out i.e.
Multimeter
ELECTRIC
preliminary
earth
to
earth
Instruction
5YsTEM
system
conrinui
as
described
CHECKS
checxs
ty,
Book_
nrust
polarity
in
the
10
Page 11
.
I
--l
CONTROL
SCHEMES
:
o
Gravity position Remove
GLOW.WORM PROGRAMMER PLATE TERMINALS
z
3
>t 1t
?40V
Domestic pumped, Remove
GLOW.WORM PROGRAMMER PLATE
hot
programmer).
red link between
MASTERMINO
MOUNTING
J
z
OOUBLE FROST STAT
(rF
50Hz MAINS
hot water
using
red .link between
MASTERMTNO
MOUNTING
TERMINALS
J
z
>i
wa1er,
POLE
FrTrE0)
a
pumped
PUMP
FOOM STAT
and
Drayton
PUMP
central heating
SL
central
5L
PL.
and
GLOW.WORM CONTROL TERMINAL
heating, both
Ilow-share
pL.
and
GLOW,WORM
CONTROT
TERMINAL
BOX
STRIP
Scheme
valve.
BOX
STRIP
IS
CHASS
EARTH
(ten
Wiring Sundial NOTE The installation of accordance Remove red
GLOW.WORM
PROGRAMMER PLATE
240V 50Hr
1
Wiring
Duof low proSrammer.
Remove cenlre.
MOUNITRC
diagram f or litting the Honeywell
Plan
Y.
MASTERMINO
MOUNTING
TERMINALS
908
161 oR L64rA CYL STAT
MAINS
diagram
system,
link A
GLOW.WOAM
MASIIR MIXD
PR06A^q Mt i
P!^ii
tIFMt\A!S
piping
with
link between 5L
Remove
and B
arranSement
controls should be
the
Honeywell
the
instructions.
and PL.
HONEYWETL GLOW.WORM
V/t073A MlO. CONTROL 8OX POSN VALVE TERMINAL STRIP
u
!Y
I;5; s
(,g@oO
Jor fitting
using the
red
from RJ
the Satchwell
sixteen position
between
link
2802 wiring
and
Scheme
SL and
nJ
28C2
wrFr^6 rusi
the
in
4tAt
C[\ir5
O
2a0v 50Hz
MAINS
DRAYTON
TA/M4
F
HAR
LOW-
S
VALVE
ACTUATOR
lndependent cental heating, motorised valves Remove
GLOW.WORM MASTERMINO PROGRAI,4MER PLATE TEBMINALS
240V
MAINS
E
ANO
red link beiween
MOUNTING
50H:
control
.
(sixteen
YL
STAT
of domestic
both pumped,
position
5L
and PL.
GLOW.WORM
PUMP
CONTROL TERMINAL
o
Scheme
hot water
using
programmer).
BOX
STRIP
\-j
TO
GAS FIRE
(IF
APPLICABLE)
and
two
8Gi91,i:H,.3i"',;.!F;;1ti-;;
SoxIaFvrRAt
SrBrP
I'r''! L !
3
lndependent
central heatint,
return moiorised valves
program
Remove
GLOW.WORM PROGRAMMER PLATE
TERMINALS
control
mer)
red
link between 5L
MASi!RMINO
MOUNTING
ii:1
2.51
sA
siAr
_CYL
'!'
!
!'
.,o.frllo
of domestic hot
pumped,
both
Own6ot
CLOtiOn_
",*
using two
(sixteen
PL.
and
GLOW.WOFM coNTROL TERMINAL
lo
cas APP!rC^81[)
Irt
Scheme
water
spring
oosition
8OX
STRIP
;-
CHASSIS EARTH
trAt
4
and
Scheme
5
tt
Scheme 6
Page 12
COMMISSIONING
-
BOILEN
EOILER
A.
B. C. D. E. F. Phial pocker.
G. Permanent H-
J. Electrode.
K. L. M. N.
P.
Q, Servrce S. U. V. Fire W. Boiler
UNIT
Gas
conrrol
Prezo Thermostat Gas valve. Electrical
Burner.
Thermocouple Governorad1ustment. Pilot governo.
Front chamber Flue
Pressure Capillary
unit
knob.
unit.
control
conlrol
pilor.
cover-combustion
collec(or-
gas
tap test nipple clrp
lss31'a.
flue
moulh.
knob.
box
union.
adlustment.
tront.
ta'at
4.I
4.1.1 Tuln on"
q.1.2
8auge. boiler. 'C'
vatve and button burner.
one can
4.1.3- gas l6). untit.
obtained.
INITIAL
BOILER
CAUTION: ;"_rl'i*_ :-rt
ne
plpes
.l burner
and appliance air.
It
as
Set
is,
the
.normally.
described
boiler
12.
all
from
operate out the diagram
th.e
posirion
Remove
(5ee
diagram'12),'u;l-;;;
Switch
Ensure
is
in
the
control
hold
in.
'B',
Hold
minute.
then
be
Adjust
the-.pilot
valve
Af ter
a. pitot
LIGHTING
The
following
bI
a. guallf,ied'
and
fittings
to
some.
will
contain
therefore,
pipes
before
-
in
controls
the
controls
gas
serv.ice
(See
d.iagram
the
gas.
pressure
on
the
that
press
tfr
.Dorter
boiler
the
position.
tb
and
'oFF,
knob
a
sinple.rq:rk
The
released.
lJame
adiustment
;emovinq
ftame
iengtn
AND
ADJUSTMENT
procedure
g",,".ui."
to
1ne
extent
"n
neces;art;;.g"
purging
Cp
with
to
tap-
gas
the
!as
upp.".[-bie.amount
-iJp"i'iunc"
tn!
should
part
3jl
,.ut"uant
,OFF,
the
to"ihe-,,;Boiler
9).
test
r"j,"'ii.
"'
elecrrical
b;li;;-1il;;;srat
S.i
the
g"u,
piloi
release
,ilrld
gas
as
ili'-uoirer
po.liln,
the piezo
igni,"t
valve
uuiu"
necessary
screw,M,(see
tire
cou".,'"t?n
-)i_i
of
should
control ptpe
be
j.
-;",;i;"
nipple
jo*",
,tl.
knob
controt
diatram
tf
OF
and
to
the
of
the
air
can
carrjed
Irlcnrir.
;i
on.ly
screw's'
be
engjneer.
position.
pressure
,o
,n"
knob
gas
depress
unit
pito,
in
{or
knob
at
the
screw,
inl
is
4.1.4
The
to Turn is
stable control ensure heating. control
should shouid
setting 'L'
to
4.1.5
Turn Remove pressure
4.1.5
Turn al.low temperarure.
leaks, drain flushing. examination
rhermocouple
(J/g
lJmm
anticlockwise
and
knob
that
Then
knob
light
be
well
has
been
the
correct
the
the
pressure
test
nipple
the
boiler
systern
turn
boiler
whilst
still,,hot
Re-fitr
for
in
to
to
set, turn
'A'
to
all
other
lurn
'C'
to
smoothly
deiined
adjusred
tas
boiler
screw.
thermostat
to
reach
Examine
thermosrar
and
Jeaks.
should
IlZ
in)
be
by
increase.
the
,ON,
the
controls
the
'Max'.
the
and
rhe
when
at
the gou"rnor
pressure,
rhermosrar
gauge
and
maximum
rhe whole
ro
to
give
vent.
Diagram
enveloped.l
piiot
rhe
u;nJn'rhe
boiler
boiler
por'ition
are
thermosrar
The
primary
the
page
sie
to
replace
,MAX,
to
sysie;-
ioFii
final
Give
gas
operatinp
ana elfective
12
0mrn
ilame.
pilot
valve
and
set
for
burner
cones
pressure
r.r"*
2. ,OFF,.
the
gas
and
i;;
then
linal
lz
Page 13
INSTALLATION
_
FIRE
4
c
4.2
INSTALLATION
4,2.1
Remove by opening the Jour carton Ilaps outward and turning the complete unit and correct leaving the lire unit standing packing.
orward in the centre until
f wires forward at th€ top radiant
'
the the
4,2,2
it of f the
removed from
panel casing securing rhe
q.2.3
slightly l3irm' li{ting verticaliy
4.2.4 securing plate the
tt.2.5
and exchanger and rear panel the the rear panel
way. The carton can then
are
packing
gas
fire unit
assembly on
Remove
assembly by
bottom
Pull
the
and
(lZiil,
Unscrew the Jour Pozidriv
to
the sides of the rear
protection
Remove
f.it on to the
louvre brackets
-
FIRE
gas
the
Remove
clear
the gas
spirdle. The casing
reflector strip,
the
th€ two louvres
fire unit f rom its
dressguard
the
ol
the reflector
and
piece
and the radiants. LiIt
from
its back on the
the
bottom
raise
easing
irrclined
plate.
(see
its base
{ire
control knob
fire heat
unscrewing the
screws,
of the casing
rhe
the bott"om
to
clear
upper
sides
in
the slotted
diagram
upward.
positioned
(see
casing
the
assembly by engaging
carton up
be in its
by
the side
and
Remove the
packing
tloor.
can now
exchanger and
spindle.
casing panel
from
of the
l4).
rwo lower
iust
diagram
approximately
'f
orward ani
pan
head
and remove
the
locations. in
packing
the
litted ofl
base
easing
by
protection
fire heat
it
,location
pulling
and lay
pulling
be
rear
below
l3).
forwarcj
screws
packing
shown in diagram supply hand s.ide nut.
4.2.7 supply
.
4.2.E Re-fit the th€ sides of the rear PoziCriv
pipe
to
of
the Iire
Check that all the
pipe
are secure and
upper casing
pan
head
14. Connect
the union
by
joints
screws
PLI
CASING
NTH
POZIORIV
S€CURING SCAiW
Diagram 13
gas
means oI the
g,as
protection pla'.e to
panel,
previously
the gas fire
at the lefl
cock
on the tight.
using
removeC.
gas fire
the lour
tubing
4.2.6
Lower the fire hear
panel
assembly extension forward the bottom locate in irrcline backward fire llue spigot Secure the fire support lg. slotted hex head large dia.
piece,
slightly, ensuring
the
fire heat
plain washers
on
to the
tilting the
of rhe heat
ho.les
in the
to make
and
exchanger assembly
channel
with
dogpoint
exchanger
combustion top ol the
that the
exchanger
extension piece,
a seal berween
the boijer
the
two
screws
provided
N G
SECURI
and rear
chamber
assembly
dowels on
assembly
flue
mouth.
to the
N,l6
x 20mm
and
positions
!n
and
ihe
lr16
LOUVF
rgP v2
llo
I
I
I
I
:
i
E
TUEING
NUT
13
VIEW FROM
REAR
OF
FIR€
Diagram
14
Page 14
5 COMMISSIONING
_
FIRE
BUBNER END SHIELD
SILE
EURN ER
NC E R
BURNER
sEcuRrNG
scREw
,*",
D
Lg{__FLAT
oN
Roo
| \l lrlu,r.o,- -
''3.i{
I }. liili,,
N Ig-4'LY
L
(g
\
BURNER
SECURING
SCREW
--q^> vl I
'{1
U
I
ENO OF
EURNER
lNJEcroRS
(.
II TFSTPOINT
--1Jr..
\
FLAME REVERSAL
lfr*NNEc'NGRoD
IGNTTONLEAD
END}
PIEZO UNIT
\ Y/',
rrRE
PRESSURE
''icnEw
IBLACK
BAFFLE
INITIAL
,.I t.l.l
Set
5.1,?
Fit the
the
connecting rod. turned should txe gas
(5ec
t3p, tauge.
and fire that .rll
Turn
the boiler
boiler
tl're the
fire cl,lcks,ise tl'rc f ront
5.1.3
The
f ire
f.:ils to pres(:nt
'
t'clr.rire
NOTE.:
!ire prevrre
r:ircqk<'d
5c
5.
l.';
Trrc
.ttrrr.;f.j
r
itlt
:r
rrr,inr:
i ,i{..1r,.r.,:.rl:.
I
C():r
"'ir
'!'Jrr'
1.
l.t
po';ition, i'('
l.'ii!,)')ia,t
LTCHTINC
all conrrols
gas
fire
oif. The
be
iacing the
fiie
test
diagram
Tunt
the gas
position,
on"
other
corrtrol knob of
fire burner
in
;t,.rrg:rg.
orr
i)rir::irr./
1,,.
21:1,ts.
cleu:;
tlrc
'-\
I
:
I
!'le !:oilcr
rc'nir.''-i
controls
therrnost3t
burner.
r:ntil
the
{ire.
the
ligh r it mav
tlrc
r.re
pre-:et.rt
is
onlv.
'iqnes )i1
Srrrrre;-. c()rrtrol
c!iglrtly
:{t:C
b.
thc
5a.rr:\'..,
AND
TESTINC
ro the
point
shorrld
Bas
CAPlllCOti.N
'OFF,
control
'OFF'
front
l r),
Ligtrs,1r"
"HlCH"
in) tc 2'+;nrn
ta
Press'rrc
knob
Ensure
on the of
the iire. Remove
screw from
and fit
service
t'ter:nost.1t
tap to
(5ee
diagram
are
to'\l,qX,to
Iire by
und
turning fully
(5ee
fi:.e piping rvhich
pass'LO\1,'
marking
diagrarn
now.
be
tire
on the
Turn
k:rob
q.'ruAe
FIRE
OF
position.
te:-nporarily ro
gas
the
ccn:rol
the
Ras
p-r"srur"
rhe
,'Boiler
rhe
9)
set
!re'
due r.i
240/6
f.lctory
pas
off
fuily
ensuring
hearing.
icr
re-lighr
oushing in
is facing
lf,).
eJiBht. lt the
air being
lhe and car:
f ire
(lin)
in
(i)c
Jire
clrrck$.ise
rernove
and
tc
the
trn(l
replacc
fire is
knob
fire
anti-
rn3,y
gis
bur:rer
heighr
by
'CFf ,
5,1.6 Fit
upwards backwards and lowering on !o
'.2 CASINC FITTING
Lower rhe exchanger
slightly, so that the dowels in
the the brackets
panel. conneclinB casrnt rop.
5.2.1
Secure
screws,
rnf lprtar <rrin
5.2.) Fit
,.3
NORMAL BOILER LICHTING
It
is assumed that
cornmissicning
accordance
Turn
5.3.1 point
,.J.2
See that heating, proSratnmer,
(rom
Turrr
5.33 position
gas
tlre
sides of the casing locate
tlre fire
on
outside the unir.
tlre unit.
(See
fire raciants
into the heat
fire casing
Bas
asse:'nbly, rilting
rhe sides of
on
Ensure that
rod passes
the
casing
positioned
(Soe
e\,
rr,
with
rhe
The
thermostat
diagram l2).
r{i:or:'r li}
\/g!
control
have been completed
the described
gas and electricity
all other controls
clock,
if firted,
just
knob'C'
Diagram
by
offering
exchanger,
rhe gas
through
with
knob
the
assembly and initial
roorn
rvill
belore
the
support
on to
the bottom
the brackets on
rhe
in
the
control
rhe hole in
the t\\,o Pozidrjv
below the bottom
to the rod.
PROCEDURE
procedure.
at
are sel for
thermostat
be situated
to the
15
the top
pushing
strip.
the hear
forward
holes in
rear
lire
tap the
in
the supply
and
a\\'ay
'OFF'
Page 15
INDICATOR
MARK
COMMISSIONING
_
FIRE
5
O
ALL FOUR RAOIANTS
5.3.4
Turn
'PILOT'
5.3.5 hold
5.3.6 the pushed rhe a ilame should
5.3.7 Ii pi.lot not wait
5.3.8 slable, and the'ON'posirion. maximum.
the
is opposite
Push
in
there.
it
Press
pilot
in lor approx.
fire casing above
circular
iorce knob'A'
three
r\lake
sure rhat the
boiler
knob'A'as
and re.lease
burner
viewing
fails to
minutes,
then turn
The main
gas
the
is lit,
be visible.
.li6ht
then repeat
5et
control knob'A'until
red arrow.
{ar
ignition
and.keep
20
secs.
the gas
aperture
or ro
from
the'OFF' position,
burner
gas
control knob
the boi.ler
b':rner will
will
as ir
button
Look
control valve
where
remain alight,
from
pilor
is
thermostar
lighr
IGNITION
go,
and
'8,
until
'A'
knob
underneath
J.3.4
alight and
for
pilot
the
'A'
at once.
do
to ro
POINT
CENTRE
TWO
RADIANTS
ONLY
Diagram
16
a
5.4
NORMAL The
down
anticlockwise. between'H'and'L'on indicator mark,
To knob
indicared
light.
to the
lighting To
been
'L'position.
be
alight.
5.'
TO Turn
depressing reach
FIRE LICHTINC
fire
spark ignirion
the gas
lighr the
fully anriclockwise
by
If rhe fire
'OFF'
sequence.
adjust
TURN
rhe heat
lit,
turn the
(See
OFF
the gas
slighting
"oFFr'.
tap
contro.l
lgnition
(5ee
diagram
push
fire,
rhe mark.
fails
position
Jrom
control
The
centre
diagram
tap
to
PROCEDURE
is
actuated
knob
then
occurs
the knob
l5).
in and
to the,H'posi!ion
All four radianrs will
ro
light, turn
and
repeat the
the
knob
two
radiants
l5).
knob
pass
by pushing
and
rotating
as
passes
turn
the
the knob
lire after
clockwise
only
Iully
'L'
clockwise,
posirion
the bar
control
to
it
the
as
above
it has
the
will
to
t3
Page 16
6
CONTROL
6.
CONTROL
the initial lighting and
After been procedures operation of
6.I OPERATION OF
6.1.1 With thermostat knob
-
6.1.2
Result - the main
6.2
OPERATION OF With
control knob'A' one have will Iailure device has re-set
It appliance Users' Lighting
carried out, the
main burner
the
Turn
the main
minute
closed.
irrdicate
knob
should not be possible
CHECK.OUT
CHECK-OUT
may be used
the
the
thermostat knob
the
its
'A'
without
adjustments have
following controls. THERMOSTAT
main
to the'OFF'position, Result
should shut ofJ,
burner
FLAME
burner
to the'OFF'
flame
(A
click from
operation).
closed,
back to pilot position.
following the
lnstructions
to ensure the
burner
alight, rurn
to the
should
FAILURE DEYICE
alight,
lailure device
the control valve
Alter
will
it
to re-light the
detailed earlier.
check-out
correct
original
re-light.
oosition. AIter
sequence of rhe
setting.
turn the
the fJame
possible
be
should
the
gas
to
PLINTH
6.5 Engage
FITTINC
the upper return Ilanges in the channels in the casing plinth
backwards as Jar as it
ln the event of an electrical
installation checks must continuity, described
lnstruction
6.7
INSTRUCT OPERATION
tT 15 INSTALLER THE
CONTROL SCHEME INSTALLED. TO
THE USER AND UNDERSTANDS USER'S
CONTROLS.
ADVISE THE
15
NOTICED AT FIRST FIRINC
the appliance,
of
be polarity in
carried
and resistance
the British Gas
Book.
USER
IN THE CORRECT
OF THE APPLIANCE.
MOST IMPORTANT
SHOULD
HAND
DESCRIBE TO
'NOTEs
THE
ENsURE
HOW TO
USER THAT
NEWNESS. LEAVE THIS BOOK UsER, OR
AT
THE
METER.
oI the
base and slide the
will go.
fault alter
preliminary
out,
i.e. earth,
to earth as
Multimeter
THAT THE
THE USER
WHICH
HAS
FOR U5ERS'
THAT
OPERATE
ANY
SMELL
I5 DUE
\I'ITH
plinth
system
BEEN
HE
THE
V'HICH
TO
THE
o
6.3
TO EXTINGUISH The burner may
established in any
6.3.1
By turning gas position. both
'C'
r{c-eneroi<p tha
leavin6 cont
Follow light
6,3.2
By turning 'pilot'
only. Thermostat the running, Re-light
'ON' required
63.)
By position. leaving controlling, and
Re-light required
This
main
should be
the
ro l.ling.
the User's
when
position.
'OFF'
but
by turning gas
position,
temperature.
turning
This
the electric
by
temperature.
THE
oI the
control knob
results
pilot
and
turned
gas
electric
THREE
position,
not
turning
Lighting
MINUTES
the gas
This
knob,C'ihould
controlling, pilot
re-set
rhe
rhermostat
shuts off
pilot
the
tfrermostat
BOILER
be
in complete
burners.
to
control
clock running,
control knob,A'to
shuts
as above;
control knob
thermostat
clock running,
BURNER
extinguished
following
the
cff the main
the main burner.
burner
w,ays:
,A'
to shut-down
Thermostat
'OFF'
eleciric operator
Instrucrions have
elapsed.
be
electric
burner
knob'C,
'C'
knob
alight.
knob,C'to
and re-
'OFF'
the
oosition to
Iurned to
',\'
to
but
to re-
burner
alighr. to the to the
but
of
knob
not
the
clock
'OFF'
only,
not
rhe
6.3.4 cuts out burner, light
Re-set
6.4 Having
re-light
devices
the fire
By
switching
leaving
by
electric
SETTING
completed
the boiler
to maintain
burner
oII the
all electrical switching
OF FIRE
pilot
the
on
clock to
the
burner
the
is checked
electricity
controls rhe elecrriciiy
correct
boiler
boiler
for
burner
time.
control
and
set
burner
ignirion.
and
alight. Re-
supply. This
main
the
supply.
check-out,
the
control
whilst
on
i6
Page 17
MAINTENANCE
_
SEBVIC]NG
7
T.
SERVICINC Servicing in
gualified
appropriate
tas
commencing
g,eneral
by a qualilied
a
must be
service en6ineer, and
service, ISOLATE ELECTRICITY SUPPLIES AFTER SERVICINC.
ALWAYS TEST
SOUN DNESS. All components are replaced
.that
7.1
described
GAS
CONTROL
for dismantling,
VALVE
The servicing of this undertaken respect
by
an
wirh
the equipment.
engineer
union'K'should be
beyond
turn continuity.
Iinger tight
Do not tighten
ma;'result.
7.2
BOILER FLUEVAYS
Regular cleaning ol the boiler necessary Jor ellicient cleaning should take
the end
at
follo*,ing
directions
ol
the
ensure correct servicing
7.2.1 the knob
Ensure
the gas
'OFF'
position,
by pulling
fire
vertically
it Unscrew,lhe tu,o lower positioned
(see casing foru,ard slightly, and
approximately l3mm lorward and
just
diagram
below
l3).
lirting
rhe bortom
(tlzin),
spindle.
carried out by
electrician. Before
THE
CAs
TO THE APPLIANCE.
FOR CAs
in reverse
control
conversant
should only
order
in
Thermocouple
rightened
to
give
only
good
{urther
flue
operation.
place
annually, prelerably
heating
season. The
quarter
a
elecrrical
or damage
passages
Thorough
should be followed
procedure.
casing
knob
is
turned ro
the
ofl the
spindle.
securing screws,
control
then remove
rellector
Pull the
bottom
of the
raise the
to
rhe
clear
vertically
easing
where
AND
to
be
every
ro
control
srrip,
casing
botlom
the
the
care not
to damage
Disconnect the electrical
a
valve the spark
7,2,8
Disconnect the
unscrew
disconnect the
and
Senerator.
the two the burner supply control valve
box
support
burner assembly
and by lilting slightly the damage the
7,2.9
securing the rear assembly oI and
Seal,
7.2.10 the Ilueway
oi the control
top
pilot
Unscrew the two
the
Jront
half and remove the complele
support
Iire
collector front.
ilue
Lif t our the Ilueway
passages
seal
to the
connections lo the
spark
union at lhe service tap and
M5
pipe
head
hex.
securing strap
bracket,
from the boiler
withdrawinB
and
box. Take care not to
burner or spark elecrrode,
brass
M6
hall ol
the
channel, Iire llue
Do not
baille
top
from
a suitable stiff brush. A sheet
the
is
in
collecting
7.?.lI correctly Iitted, the
top rear of must
boiler
'*'hen
pushed
be
combustion
the dust.
refitting
the
chamber
the baIIle ensure
'Top'
word
boiler
wateru'ay'.
down into the lluervays.
boiler body.
ignition
screws
lead at
holding
to the
Remove the
forward
head
hex,
Ilue
screws
collecror
darnage rhe
and clean
bolionr, usinB
to
paper place<.1
of
will
help
that it
musl be
ar the
The
tas
tas
base over
to
Cucr
our
in
baille
(See
is
diagram 5).
.NOTE
ensure that and rerained phial pocket
When
it is
wirh
is fitted the boiler secure sho*n in
diagram 12.
re-fitting
the thermostat
inserted fully into irs
the fix
the
provided, li
the
on
left-hand
capillary in rhe clr';
phial
pcc^e:
tn';
sice ci
:s
7.2.2
Remove
the
plinth
forwards.
7.2.3
Turn the gas position Pozidriv
ilnnpr cecins nrolo.ti^^
-ir''
the
7.2,4 slotted diagram
7.2.5 supply
(5ee pan
rear panel
Remove the
locations in the
l4).
Unscreu, the tubing
pipe
service
diagram 9).
head screws
and remove
two
and disconnect pipe service tap. Remove screws and to the The top of rhe
w35hs15
fire support
lire forward slighrly at the duct, and lifted vertically dowel
location at
assembly.
7.2.6 clip on This phial boiler.
7.2.7 washers combustion body
Release
Remove
the
the {ire
th€rmostat
supporr
is only necessary
{itted
is
Remove
into
the
the
two M6 hex
securing
chamber extension
and
remove the
by
withdrawing
'Q'
tap
Rernove
securing the
+^
^lara
protection plare.
the
louvres
side
rear
nut securing the
the two
securing
channel
assembly
slotted hex. head
the fire
(See
can
top to
clear
to
disengage the
rhe base
capillary
(See
plate,
when
the
rhe lelt-hand
phial
from
its
hd.
the
screws
lront
to
cover
assembly, taking
the
'OFF'
to
lhe lour
inclined
+x6
SidgS Of
lrom
panel,
gas iire
from
assembly
diagram
now
be tilted
the
oI
the fire
Irom its
diagram l2).
thermostat
side
of
pocket.
and
cover and
boiler
the
it
the
(See
gas
lq).
flue
the
lvl5
tl
Page 18
SECURING
SCREWS
NITING
PIEZO
WASHER
Holes when
INJECTORS
LOCKNUT-
PLATE
UNIT
of
rear
at
re-assembling
\*d
\E
FIBRE WASHER
TEST
PRESSURE
PRESSURE POTNT
TEST
SCREW-tQy'
CONCENTRIC
plug
- ^.3
TAP
PLUG
REAR
,
BODY
Diagram
17
o
CLAMPING
TH
ERMOCOU
ELECTRO
PILOT
UNION
D
SHIELD
PLE
E
PILOT
BRACKFT
BURNER
INJ
ECTO R
LI NT
AR R
ESTER
i\
PILOT
\
BRACKET
SCREWS
@
18
Diagram
19
Page 19
7.3
BOILER
BURNER
MAINTENANCE
-
SERVICING 7
With
the removed as under clean all accumulated lint and dust
the burner,
controls. Use a vacuum
brushing the dust burner
Remove assembly
clamping plate, see
'
lint
Thoroughly clean
the sliding on clamping
7.q FIRE BIJRNER Clean
fire
around the Iire chassis.
7.'
DUPLEX
7.5.1 Remove rod to the gas tap, flat
7.5.2 unit.
7.5.3 the two
plate spring and
lop.
the
by
arrester
jector.
in
plate
all
burner
GAS
ar
the
Disconnect the
With
the tap
screws
and liit
b,urner
boiler
pilot
burner,
etc. into
.lint
unscrewing
to the
accumulated
using a
the splir pin
top of
washer,
arrester lrom the burner
diagram l9
lorward
the
Replace
burner and
and
screw.
vacuurn
TAP
the rod,
ignitiorr
the
in
and
washers
off
the niting plate.
see
and
t'Boiler
the retainin6
lint
the
lint
securing
rroting the
'OFF'
diagrarn
gas valve
FIueways,
from
lint arrester
cJeaner th€ holes
and sliding
lrom
arrester
cieaner.
the
and
,lint arrester
secure
and
dusr
rhe
posirir.rn
lead
ar rhe
position,
securing the
Ren,ove
17,
assembly
above,
around
and
to avoid
on the
screw and
the
burner.
around
by
with
the
lri:'r'n
nlso
corrnecting
the
clea;r
oI tir:
piezo
removc
niting
the
7.5.4
Rerrrove the
7.r,5
To
holes in
7,.5.6
spindle in the'OFF'posirion
plate washers. the slots
7,5.7
the pin rod is kttot-.r.
re-asserrrble,
ReIit
and secure with
ReIit
two holes in
making
facir't lelr,
plug,
plug
rhe
tlre sprir'lg
Ensure
in the
the
ic rhe
that the
plug,
connecring
sure !l-'at
rhe top
Refit the
and
clean insert
ar'd
rhe plug
rear
$.asfrer,
the
spindle
rod t!-rrough
panel.
tfrc Ilat
lighrly
ol tl-,e fire.
replace the
two screws
on the
casing and
re-greasc.
*ith
wi
:rnd
engages
the rear
Fir
the
connec ring
the
rli thc.
niting
and
with
oI
split
control
19
Page 20
8
MAINTENANCE
_
REPLACEMENT
OF PARTS
8
REPLACEMENT Before removing or
that the appliance is
sure electricity
at service
ofl
t.I
GAs
With
Maintenance
in
gas
the after disconnecting electrode and
.
electrode to
When spark is 3.5mm
8.2
FIRE BURNER
First remove the plinth described Flueways, fire electrode pan remove the securing the control
tap
tas
position
the Loosen the gas the left remove.
!h" Supporting
pan
head screws, at the side of the removinB the two note that shield
the
on these removed heads. rest
burner
the tak.in6 care not
Refit ensuring through panel. the llat The two pin
should be
indicating
Ensure gas
tap
t.3
FIRE INJECTORS
Vith
described
gas
the thread care should be
injectors
tight
tas
t.4
DUPLEX
supply and
tap
FIRE IGNTTION
gas
the
replacing,
gap
head
lower
on
parts
on
in
that
the
sealing
Iire
ignition
fire
removing
the
between
4mm.
to
in Maintenance
Disconnect
(See
screw
silencer. Remove
spindle and
of the
side,
hand
lJnscrew
injector
the burner,
these
the lelt
(see
right,
are fitted
and immediately
Allow the gas
the
electrical
by
moving
reverse
that th€
rear
the Re-fit the
on the
l-roles in
in
that the
the tubing
burner
and
fire
the
injectors
tap.
compound
are tightened
(See
seal.
TAP
CAs
OF
PARTS
replacing
tfre
(See
diagrarn 9).
ELECTRODE
casing removed
Instrrrctions
electrode
the
the
burner,
fire
the
electrode
electrode
and outer
Instrtrctions
the
diagram
securing
knob
connecting
*irhdraw
flat at
lire.
supply
(See
diagram
the l9mm
boss
unscrew
one at each
fire heat
screws
screws
and a
to
damage
of the
connecting
the
line
tap is
are secured.
burner
When
taken
diagram
also secure Ilame reversal
diagram
in
the same
tap control to
the Ieit
order
connectint
two
pin
split
tap
front
in
nut is
removed
can
replacing
rnust
to ensure
sulliciently
any parts, make
isolated
gas
supply
7.2 Boiler lead
screw
ignition
the top
pipe
on the
securing
and pipe
the spark
to that
rod is
spindle lor
to rear
l5).
as described
can be
at
securing the
(see
diagram l5).
ensure
tip and burner
l5).
the
lead
Unscrew the
the silencer
the
the
rod, noting of the rod.
tubing
14)
A/F
end
exchanger,
lr). under
making
re-tightened
be
but do
lccknut
th€
two
of
the
Ensure
positions
the screw
assembly
box,
and remove
and
rod
holes
in the
lacing lefr.
of tl-re fire,
'OFF,
as previously
removed
the
injectors
not
be
to
the
from
is turned
Flueways,
removed
lire
the
that the
tip
casing as
7.2 Boiler at
the
and
pin
split
rod to the
nut
on
not
from
tap.
tap
Pozidriv
burner
the
Vhen
burner,
an eno
balfle
tlrat
as
to
forward,
electrode,
described
is fitted
top
sure thar
the split
position,
when
Jrom
bur
used,
that the provide
when the li re.
t.' GAs
Fint
rMaintenance
Fluewayst'. in the
Disconnect the pi.lot supply
out connection. Disconnect thermocouole union
'K'.
gas at service tap right hand can now be removed service replacement valve. Remove the nipple in a simi.lar \9hen re-made
rKris
beyond
p,urge
to and accordance
(5ee
E.6 THERMOCOUPLE
First exchan6er assembly and front
.
Maintenance Remove
(see thermocouple
buckle pilot val ve.
lJnscrew to enable
ljnscrew valve, Replace thermocouple turn
E.7
BOILER BURNER
First exchanger Iront Maintenance
Remove
bracket
inlet
burner
a
a
connection replacement, threads.
CARE MUST AND REPLACINC
two holes in
the
pin
split
VALVE
remove
Disconnect the electrical
valve.
elbow from the original
re-assembling
not tightened more than
finger tight.
re-.lighting
section
remove
diagram
clip securing
tube
and remove the thermocouple
beyond finger tight.
remove the
to the
will
are
the
Instructionst
Make
'OFF'
lJnscrew
tQ',
side of
tap and union elbow littings
position tight,
tas
the systern
with
4.1).
the
cover assembly as
Instructions 7.2 Boiler Flueways.
the
screw
19
the
to
and
disconnect
the
two
pilot
rhe
the thermocouple union
taking care not
union'K'more
assembly and
cover assembly as
lnstructions 7.2 Boiler
the
two screws securing the pilot
and unscrew the
burner, see
then be free.
from
rJsinB
BE
the
in Iine
8as
sure the
position
and
the
on the
ensure that
and that
of
should be carried out in
the initial lighting
plinth,
securing the
and the clip
pilot
pilot
plinth,
the old
a
TAKEN WHEN
BURNER.
Bas
front
f ire
under
gas
(See
pipe
and
disconnect the union
union elbow at the
the
valve. The valve
6,as
and
replaced.
replacement
thermocouple union
lt will be
air aiter this
casing, fire heat
combustion
burner.
the thermocouple
pilor
bracker
assembly
casing,
combustion
un.ion
diagrarn I 9.
Transler
little sealant on the
spindle ior
tap
rear
to
as described in
service tap
union
wiring
valve
all
one
found
described
tube
securing screws
to 'K'
than one
describec in
nut
burner
of the
t'Boiler
7.2
diagram 9).
and
ease
to
the
Re-lit
pressure
quarter
pilot
securing
Remove
at the
be on
complete.ly.
to rithten
Flueways.
at
REMOVINC
the
lo rhe
test
and re-fit
valve.
joints
are
turn
necessary
operation,
procedure
chamber
shielC,
the
the
the
to
tas
Jirted).
the gas
c'ar?er
{ire
heat
chamber
the gas
The
the
union
to the
is
t
in
To remove but
unscrew
supply
Bas
control
:T,
assembly.
tn.
tas
the
the
tube.
tap
gas
tap
tubing
Remove
Vhen
is in
proceed
nut
and
the
relacing
'OFF'
the
as
in 8.2 above
ease
out the
tap and
tas
make sure
position,
i.e.
20
Page 21
I
I
->i|<-- tl
3
mm
BOI LER PILOT
ITION
IGN ELECTRODE
Diagranr
BOILER ELECTRODE
First exchanger assembly and Iront
Mainter,ance Instructions
\l'ith
removed, remove
shield,
union at the
Pozidr
bracket to
from
pilor
taB conneclion
fitrinc rhe
lower
shown
t.9 BOILER
First
exchanger assenrbly and
front cover assenrbly
,\4aintenance
Remove
and
electroc{e- remave rhe clin <eerrrino thF
thermocouple to
the
the
bracket and the
pilot
base oJ the
one
immediately above the
When
stud
in diagram 8.
remove
cover
boiler burner
the
diagram 19. Unscrew
see
Taptite
iv
the
stud securirrg
the
bracket. Pull
plecirodr,. .aattr- rl.'o ^r
!.vv!vv!t
and
stud
diaeram 8.
in
PILOT
remove
lr,struclions 7.2
pilot
the
pilot
bracket
thermocouple.
slud securing the
burner.
on
and ensure thar the
pilot
the union and the
re-lirting,
plinrh,
the
assembly
the screw secur
valve,
Bas
screws
burner
rhe ignition
on the elertrode.
ensure
BURNER
the plinth,
shield, gas
screws as
pilot
the
I.Jnscrew
5crew and
Disconnect
burner
secure
casing, fire
combustion
as described in
7.2
Boiler
gas
and
remove
securing rhe
unscrew
and
the elecrroCe
that
the spark gap is
casing, fire hear
cornbus!ion
as
v;rlve
burner
tl're hex.
electrode
nut securing the
pilot
the
by
using two
other
union nut
electrode
spark gap
Flueways.
control
ing rhe
the
the hex.
lead from rhe
described in
Boiler Flue'rays.
in
and
to rhe
tube at the
on the hexagon
and
by
MAINTENANCE
heat
chamber
assernbly
pilor
pilor
rube
lhe two
pilot
nut
ro
the
When
re-
the
chamber
pilot
union
8.E Boiler wirhdrarr,
frorr,
nut
pilor
spanners,
thread.
the lower
is
as shown
I
as
-
REPLACEMENT
the
Slide
Unscrew the sealing compound
8.II ELECTRICAL CONTROL Remove the
exchanger and rear
Maintenance
in thermoslat control and disconnect piezo
unit. Remove screws cover to the contro.l cover. Disconnect terminal securing the mains cable clip mains cable lhermostat supp6rt necessary into rhe left-hand
phial
the secured to a bracket screws and
control in see relevant
'l NOTE:
ensure and retained phial pocket the boiler, shown
E.I2 BOILER PIEZO
Renrove exchanger
Flueways. Rerr,ove and Electrjcal Conrrol Box, above. can then be removed as necessary.
8.I3 FIRE PIEZO Remove
reverse
the
nst
lat i
al
in
in Nlaintenance lnstructions,
control box
the reverse order.
Ilaintenance and remove assembly Insrructions :
7.5.3. 7
7.5.5,
arrester lorward from
lint
injector and replace
on the
plinth,
and shakeproof
strip,
to be
capillary
plate,
when
from its
hex.
box
may then
on'. urhen
that
it is inserted
with
is
secure
diagram
plinth,
the
and rear
plinth
the
Instructions, 7.2 :
the
as
Reolace
.5.6 ano 7.5,7.
casing
panel
Instructions.
knob Iorwards
the spark
the
box body and remove the
all external leads
slackening oli
withdrawn. Release the
{rom its clip
(see
diagram
thermostat
the
side
pocket. The control
nuts.
order.
wiring diagrams
re-fitting
the Iix
fitted
the capillary
12.
UNIT
casing
panel
the boiler thermostat
cover
UNI'|/NITING
and
piezo
described in
Duplex Cas
in reverse order
threads.
assembly
two washers securing
of
with
Remove these
be
For
the thermoslat
on the left-hand
assembly
as
ca.sing
unit and
PARTS
OF
burner.
the
a
using
BOX
and the Iire
as described
Pull
ofl
its
ignition
the
withdrawn.
details
lully inro
Tap 7 .5,1,
lead at the
Pozidriv pan head
rhe screw
to enable
on the fire
l2). This is only
phial
is firted
boiler.
two
provided.
and the lire
7.2 :
described
The
PLATE
as described
Boiler
as describeC
Rerr,ove
Pozidriv
Nl,
and the
Replace
oI the
its
in the
describeci
as
in E. I
piezc
Replace
ASSEMBLY
Flue'r'a)'s niting \laintenance
7 .5.? and
9l
litrle
heat
the
spindle
the
at the
the
box is
wiring
uncjer
phial, pocket If the
oi
side clip as
heai
Boiler
knc:
unil
in
in
pla:e
in
i
t.IO
BOILER INJECTOR
First exchanger assembly front cover assenrbly l\'laintenance
Remove assembly
remove
removing
the
lnstrrrctions
the
lint arrester
by
unscre*,ing
the
clamping
plinth,
and
casing, fire
combustion
as
7.2 Boiler
the retain.ing plate,
chamber
described in
Flueways.
from
the burner
screw and
see diagram 19.
heat
ZI
Page 22
FAULT
9
FINDING
_
BOILER
FAULT
9
PILOT
9.2 Cause
9.2.1
9.2.2 Gas (Check
pressing igniter). (a)
. lunctional
not Ilow (b)
pressing (c)
9.2.) No spark.
9.2.4 Electrode to
PILOT
9.3
CONTROL
FINDINC
WILL NOT
Air in
gas lirre
supply
by applying
On undoing the
freelY.
On undoing, tubing
control
9.2.2
As
pilot head.
WILL
CHART
LIGHT
to
control and
(b)
not correctly
KNOB
restricted:
Pilot
match
tubing nut
pressing
knob, gas does not llow lreely.
gas does
but
NOT STAY ALICHT
I5 RELEASED.
pilot
to
at
knob,
nut
at
flow freely.
positioned
insread
pilot
mulri-
gas does
burner
in re.lation
WHEN
of
and
Remedy
out air.
Purge
Rectily
Ensure
Change
Recriiy blockage
Pull
lead close If
unit. Re-position electrode
blockage
pilot throttle is fully
blocked
ignition
no spark, change
pilor
!n
off electrode.
lead
burner, and
to
in multi-Iunction
tube.
pilot
ignition lead
as shown
open.
injector
operate
in
pilot head.
or
Hold
piezo unit.
and/or
diagram
conlrol.
of
end
piezo
t.
o
Cause
9.3. I Pilot flame
a
F J
)
tJJ (a
J
J
)
oz5
LU 1I
I
F
F
not
impinging
1J
on
thermocouple.
Remedy Check
pilot
injector
or
pilot
gas
adjustment.
E (-)
z
lu
o15
rl
o 2
CLOSED C IRCUIT
DIAGNOSIS
4
6 8
TH ERMOCOUPLE
GRAPH FOR
10 12
VOLTAGE
14
(M
THERMOCOUPLE
22
.18
16
I
LLIVOLTS)
CIRCUIT
20
zz
Diagram
20
Page 23
9,).2
range a the i
nt err
To
test the thermocouple,
-
0
of
thermocouple
B.C.C.
uo
ter.
30
mV
interrupter
(Minitest
is required,
a merer with
test unit
6)
Multimeter and
togerher
similar
with
to
a
Re{er to
20) when
FAULT FINDING
Thermocouple diagnosis graph using this
chart.
_
BOILER
9
(diagram
Disconnect appliance connections are clean unit. Fit appliance
Hold down control thermocouple
thermocouile into
knob
atlain
to
voltage
g
rea ler
than
15mV
Note the voltage. the VERTICAL point
TH
clRCt.tn
SAT
open circurl reading.
Referring
where
to
axis.
these
the Diagnosis
arrd the closed
two
ERMOCOUP!E
ts
ISFACTORY
lhermocouple from the
and in
oood condition.
the test
niultrfunctional control
orr
operating temperature.
measure
values
then
Graph. circuir
intersecr
area
the
mark
volracie
on lhe
ol
graph is
I nlerSecl
multifunctional
Fit
tesl meter
meter
inlerruoler.
lgnrte
Measure
control. Check that
inlerrupler inlo the magnet
pilot
burner
OPEN CIRCUIT
the
Faulty thermocouple. Replace.
CLOSED CIRCUIT
the open circuit voltage on
on lhe
HORIZONTAL
oiaoh
the
the
Faulty R
eplace.
allow
and
voltage
volrage.
Nore rhis
axis. Nore
thermocouple
all
the
magnet
Faulty
in multi-
unit
iona
f u ncr control.
z.t
I
Replace.
Page 24
9.4 ELECTRICAL diagram
IMPORTANT:
9.5 system
lr4ultimeter
when
checks
FAULT FINDING.
using this
as contained in lhe
instructions
The
charl
preliminary
book
Refer to
(diagram
are the lirst
2l).
electrical
British Cas
wiring
checks procedure. Iinding and the and
to
task
re-making
checks'A'
'D'
Resistance to
be
carried
On
which has required
out during
complerion
of electrical
Earth
continuily,'C'
Earth
a fault-finding
the service
of
connections
must be
breaking
the
Polarity
rePeated.
faull-
then
START
lsolate all
HERE
power
wires and
supply
connections.
and/or cylinder
Turn lhe
voltage
ls
ON
voltage
power
lhe
across
between 1 6V and
*
25V
Turn
off
voltage
thermostat
boiler
across
(5)
to
lhe conlrol box.
Check
thermostats)
supply
(5)
to the control box. (6)
and
lsolate power lead
from
onneclors
the multifunctional control. Attach
on the end of the twin oranoe
supply
Faulty solenoid functional power
supply
and aoain measure
(6)
and
in
Remove
Check that
fuses
any,
if
are calling
in
wiring diagram.
the
supply lo the
to lhe control
in multi-
control.
wiring
replace
and
diagram.
lsolate
the control
for
Turn
control
box.
all
secondary
heat.
ON the boiler
box
Detach
box.
voltmeler
lead.
Measure In
wrrrng
Faulty
boiler lhermostat.
lsolate
power
reprace.
cover and
conttols
physically check
(e
thermostat
the twin orange
Switch ON
across
voltage
lhe
the
between
oragram.
supply
and
g
room
and measure
voltage
ls
between
and
ls
(4)
voltage
(3)
between 25V
40v
and
*
25V 35V
ls
voltage
Have mains
{or
UK48
for
UB58
-+<
BOILER OPERATING
electrical
supply
Gas Gas
engineer
to
the boiler.
valve valve
TRANSFORMER
ELECTRICAL SYSTEM
SATISFACTOR
and
put
check
ILY
right
Measure
wirinq
Faulty
transformer.
replace.
and
voltage
diaqram,
between
lsolate
power
(1)
(2)
and
voltage
ls
between
6V
21
264V
supply
in
and
THERMOSTAT
24
MULTIFUNCTIONAL
CONTROL
Diagram
21
Page 25
FAULT FINDING
_
FIRE
9
Spark
across
ignition
START HERE
Turn on appliance
observe
gap,
Ensure specified lap to energise
Disconnecr ignirion from conneclor
burner and
appliance
off
No
spark
across
gap
No
spark
across
gap
electrode, place
tap and
spark
gap
is within
tolerance. Turn
within
operate
tap; turn
igniter
lead
4
mm of
piezo
Fire
will not
Check
burner, correct tunctioning of all setting electrode and are satisfactory. Check that
burner
Correct
light
gas
that
using a match, ensuring
pressure
any
is available at
positions.
piezo
fault found.
Remove piezo
unit, screwdriver between appliance chassis earth piezo
unit,
gap
4 mm and
spade
Operate
burner
Check
conneclions
unit
is
as specif
ignition lead from
place
and
leaving
between blade
connector.
igniter.
in
that
ied.
No
spark
across
gap
and
Sp ark
acrpss
gap
Replace and reassemble ignition
Spa
across.
rgnrt
Ensure soecified tap to energise
Spark
across
ignition
faulty electrode
syst€m
rk
g
ap,
ron
gap
is
lolerance. Turn
gap,
No
across
within
igniter
Spark,
ignition
spark
gap
no
Renew ignition reassemble system
Spark
across
ignition
Change
reassemble
and
syste
Spark
across
ignition
Check several
that
satisf aclory
ignition
gap,
piezo
m
gap,
ignition is
END
lead
S
ig nition
unit
ignition
times
and
pa rk,
no
25
Page 26
lORE%
/
4,4
A
tl
J
€-
11
IJ
/
24
LJ
l/
il
ilil
"wq
\\tl
V
w. T,
-13
I
ri\
\ li )
\g)
rT
)q<
14
t
A^\
\:rr
23
\/f"
II
ffi'"-19
g,@
/
10
\,
gL_16
21
m23
Page 27
REPLACEMENT
PARTS 1O
Item
No.
I 2 3
al
4A 5 6 7 E
l0
.tl
IZ
l) l.+ t5 l5 t7 l8
tv
2T 22
It 2tt
G.C.
t52
152 l9l 392 3E3 3E7
38E
39t 1E4 398
384
351 l9l
152
152
?q?
| ?5
397
?q?
382 390
?gn
No.
405 442
t)t
767
540 696
062
(2
673
349
669
661
tt>
2t6
443
7t3 945 947
563 388 929 9E3
Part
<
Description
Dressguard Radiant Electrical
ll2
l12 in. BSP Gas Piezo Pilot Injector-boiler Injector-fire Lint Sight glass Control Clip-control Control Clip-controt Electrode-fire, lgnition
Electrode
Ignition Piezo
Piezo Thermostat Thermocouple, Clip - Thermocouple
control box
BSP
in.
tap-fire
unit
burner
arrester,
knob knob
lead - lire
-
lead unit unit
Midgitrol gas Midgitrol gas
Pjezo
c/w
fire, Concentric
straight adaptor, Maclaren
c/w
Furigas
Bray
Cat.
Furigas
-
boiler
knob,
Lewis spring
-
fire
knob,
KC
Buccleuch BEDl63lll
boiler,
-
boiler
-
boi.ler, Kigass
-
boiler, Vernitron Variant 66108
-
boiler,
Maclaren 2500M-24
valve, Maclaren UK valve, Maclaren UB ,8RAB 29
unit, Concentric
JC/SA/I260
0l J.01r.000
28
No.
b1E.014.000
thermostat
1l4l0l4ElBD35
Kigass
Ranco
E5645
D5037
C26
200
LSl402l17
-
PO5ql
4tRBB
JC/
A/638
(for
item 5 only)
26T0166 TL0l6
0,
Glow-worm
Part No-
K6223 K6936 FF
l2l0
K90t,9 I . ,
srrrnolAlt€rnallves
K734q
KEO59
K83r6
K9207
K6q63
0
K92l
K5226
r r ztt+
Kq l58
K69tr6
K EJ4E
4l
5062 ww4609 K9205
\YWlr604
K6J87l ..
g
7J^
K 65
l rer
nai r
ves
FF2t29
KtrE60 K
3580
l1 replacement parts local
supplier. appliance preferably
the
on of the boiler
data
Iire
control bo;:.
Please
"Glow-worm
serial
numbers which
badges
back panet
are required,
quote
the
Capricorn
positioned
in
and on
apply
name
240
can
the
the
side of the
your
to
of
16,,
be Jound
L.H.
lower
the
and
27
Page 28
Because of our improvement, details those in this
booklet.
constant
may
var
en6eavour
y
slightly
Ior
!rom
Tl
Glow-worm Ltd
A
member
Nottingham
Telephone
Service
Engineer
the Tl Group
of
Road, Belper, Derby DE5
Belper 4141 Telex
Enquiries
only
37586
Belper 6516
1JT
Loading...