3. Drill one 9/64” hole at each of these locations for sheet metal screws.
4. Cut opening for the unit.
5. Install unit into air duct using the four sheet metal screws provided.
1. Cut out shaded area of template (#1) or for high heat installations, cut on the dotted line. (#2)
2. Place template on the return path of the HVAC system and trace the hole pattern for the unit and mark centers for mounting sc
TOP
INSTALLATION
#1
(Opening size is 6.75” x 2.5”)
Cut out on dashed line.
(Pa ge In ser t)
G
GUV
ENERAL
TEMPLATE
2018
A
IR
E
rews.
TROUBLESHOOTIN
G
• Under normal operation the LED should light when the unit has been supplied power.
If the LED does
1. Check
to be
sure
2. Be sure lamp
light:
not
there is power to the unit.
connector
is fastened
securely
.
3. If the LED still does not light, replace lamp.
4. If still
ARRANT
W
not operating,
Y
replace ballast.
The manufacturer warrants the GUV-161 air purification unit against defects in
materials and workmanship for a period of four (4) years from the date of installation.
Lamps carry a warranty for the useful life of the lamp, two (2) years .
This warranty does not cover broken lamps due to shipping, installation or handling.
This warranty gives you specific legal rights and you may also have other rights which
vary from state to state.
Air
18”
” Germicidal UV-C Lam
16
p
flow
2.75”
Titanium
Photocatalytic
Reflector
Box size is
8.25 high x
4.25 wide.
©
2005 For service please call 248-476-5100
GUV2018
Re
turn
Air Duct
Furnace