R
Fresh Indoor Air Quality
INSTALLER: PLEASE FILL OUT AND MAIL WARRANTY CARD AFTER INSTALLATION
IS COMPLETE. LEAVE INSTALLATION INSTRUCTIONS WITH HOME OWNER.
PRECAUTION: The installer should be an experienced service technician. Disconnect electrical power before
beginning installation. Do not install where temperatures fall below 32 degrees F or where plenum temperatures
exceed 150 degrees F. For maximum evaporative capacity, install this humidifier on the warm air supply plenum.
ADDITIONAL MATERIALS THAT MAY BE NECESSARY:
1. 1/4" diameter plastic supply tubing or 1/4" copper supply tubing for hot water applications
2. current sensing relay (G.F. Model #GA50 suggested)
3. junction box, 115 V. grounding outlet, cover and wire
4. 1/2” I.D. drain hose
5. #8 self piercing sheet metal screws
SURFACE OF THE WARM AIR PLENUM
1000 SERIES
FLOW THROUGH
POWER HUMIDIFIER
FOR INSTALLATION ON A VERTICAL
OF ANY FORCED AIR FURNACE
1
12-1/8”
14-1/8”
Select location on vertical surface of warm air plenum of a forced air
handling system for mounting humidifier that allows for service and
maintenance. Do not install humidifier where the blanked off ends of a
cooling coil will restrict air flow to the humidifier.
12-1/8” tall by 14-1/8” wide as shown.
2
1
2
Open cover and remove evaporator pad assembly. Humidifier chassis is
self retaining, slide top side in first then slide chassis down. Level chassis
and install eight screws.
Cut out a square section
4
Connect 1/4" water supply tube to inlet of solenoid.Connect drain hose
to 1/2" spout on humidifier cabinet using hose clamp if necessary. Run
1/2" hose to suitable drain such as floor drain, sewer or laundry sink. Be
sure hose has continuous slope and is not kinked at any point.
GCV3412 CODE VALVE INSTALLATION INSTRUCTIONS
Copper Pipe
1. Turn off water supply.
2. Clean pipe, fittings and valve with sandpaper or wire brush.
3. Apply a thin layer of flux to all surfaces to be soldered.
4. Assemble valve to pipe and/or fittings.
5. Cooling the valve by wrapping a wetted rag around the valve is
optional.
6. Heat the joints with a torch. Apply solder to each joint. Continue to
apply heat sufficient to keep solder liquid.
7. After solder has filled entire joint area, remove heat and allow joint
to cool. Do not move or disturb.
8. Slide compression nut over 1/4” copper tube followed by
compression sleeve.
9. Insert tube into valve fully and tighten nut.
10. Turn on water supply and check for leaks.
COPPER
3
Mount the self tapping saddle valve on either a cold or a hot water pipe.
A side or top mount is best to avoid clogging from pipe sediment.
Connect 1/4” O.D. tubing to the saddle valve. Copper tubing requires a
brass compression nut and brass sleeve. Plastic tubing requires a brass
insert inside the tubing in addition to a plastic ferrule and brass nut.
NOTE: D O N OT USE P LASTI C T UBING ON HOT WATER OR IN
CON TAC T WIT H ANY H OT PL ENU M SUR FAC E OR DU CT.
INSTALLATION OF THIS SADDLE VALVE MUST MEET OR EXCEED
LOCAL CODES AND ORDINANCES.
FORM NO. 1000-16 (FILE 15066) REV. D
TUBING
PLASTIC
TUBING
*CODE VALVE IS INCLUDED WITH AUTOMATIC MODELS ONLY
3/4” TEE
1/2” TEE
5
GFX3 ELECTRONIC HUMIDISTAT
AC N
AC L
SNSR
HUM
OUTDOOR TEMP. SENSOR
(NOT USED IN MANUAL MODE)
HUMIDIFIER CONTROL LEADS
(YELLOW WIRES)
24V OUTPUT FROM HUMIDIFIER (RED WIRES) OR
727-58 24 V. TRANSFORMER WITH CONSTANT POWER
OR 24 VAC POWER SUPPLY WITH CONSTANT POWER
MHX3 MANUAL HUMIDISTAT
115v.
60CY.
SNSR
HUM
AC N
AC L
6A
6C
ACC
EAC
(HOT)
C
NO
115v.
60CY.
12500 AIR
PRESSURE
SWITCH
L1
(HOT)
L2
ON-OFF
SWITCH
C
HUMIDIFIER
120v. OUTLET
ON-OFF
SWITCH
HUMIDIFIER CONTROL LEADS
(YELLOW WIRES)
HUMIDIFIER
120v. OUTLET
HUMIDISTAT POWER LEADS
(RED WIRES 24 VAC)
GRD
GRD
6
INSTRUCTIONS FOR WIRING HUMIDIFIER
NOTE: ALL WIRING SHOU LD COM PLY WITH LOCAL ELECTRICA L
CODES.
6A WITH FURNACE CIRCUIT BOARD
Use with mechanical humidistat only. On furnaces with output terminals
ACC, or EAC check output voltage to determine that terminals are 115V.
Connect on-off switch in series with the hot wire. Install humidistat and
connect to yellow wires on humidifier.
SNSR
HUM
AC N
AC L
115v.
60CY.
6B
6D
7
ON-OFF
L1
(HOT)
C
HUMIDIFIER CONTROL LEADS
(YELLOW WIRES)
115v.
60CY.
SWITCH
FURNACE
CONTROL BOARD
HUM
24V.
C
60CY.
HUMIDISTAT POWER LEADS
(RED WIRES 24 VAC)
L1
(HOT)
L2
7
FIELD SUPPLIED
RELAY 24V COIL, N.O.
GA50 CURRENT
SENSING RELAY
ON-OFF
SWITCH
HUMIDIFIER
120v. OUTLET
HUMIDISTAT
COMMON LEAD
GRD
YELLOW WIRES
FROM HUMIDIFIER
C
HI
LO
HUMIDIFIER
120v. OUTLET
GRD
MULTI
SPEED
BLOWER
MOTOR
6B WITH CONSTANT POWER TO HUMIDIFIER
Use with mechanical humidistat only. Mount a junction box and 115v.
grounded outlet. Connect the on-off switch in series with the hot or black
wire. Install a field supplied 24 volt relay and attach to HUM and C on the
furnace control board. Install humidistat and connect one side to one
yellow wire on humidifier. Connect the other side of the humidistat to one
end of switch side of the relay. Connect the other switch side of the the
relay to the remaining yellow wire on humidifier. Red humidifier leads
are not used for this wiring method. Do not touch red wires together.
Damage to the humidifier will result.
6C WITH ELECTRONIC HUMIDISTAT - PRESSURE SENSING
On furnaces with a two speed blower, the humidifier and a Model 12500
Air Pressure Switch may be wired from a continuous 115 volt power
source. Install the on/off switch in series with hot or black wire and Air
Pressure Switch in series with the humidistat circuit. The Air Pressure
Switch will detect furnace operation and supply power to the humidifier
accordingly.
6D WITH ELECTRONIC HUMIDISTAT - CURRENT SENSING
On furnaces with a two speed blower, the humidifier may be wired from a
continuous 115 volt power source. Install the on/off switch in series with
the hot or black wire. Install the GA50 Current Sensing Relay in series
with the humidistat circuit. The Current Sensing Relay will detect furnace
operation and supply power to the humidifier accordingly.
Replace evaporator pad assembly and humidifier cover. Insert low voltage
six connector wiring harness from cover into chassis solenoid harness.
8
Turn on water supply and plug in power cord to check operation of
humidifier. Set humidistat to a demand setting. With the furnace off, the
solenoid valve should be closed and the humidifier fan not running. Start
the furnace, the solenoid valve should open and the humidifier fan run
when the blower or burner circuit is energized. Check flow of water
through distributor trough and evaporator pad. The standard GA4231
yellow orifice will supply approximately 3.5 GPH of water at a line water
pressure of 60 psi. For low water pressures (20-40 psi) a larger orifice
GA4299 is available to provide the same flow. Leave humidistat set at the
recommended setting.