GE Industrial Solutions TNK100 User Manual

DEH44149 Installation Instructions
g
Neutral mounting kit
Catalog number – TNK100
Introduction
This bulletin provides instructions for installing Neutral lug kit – TNK100 on all GE Double throw safety switch rated 100A & below
WARNING: Hazard of electrical shock or burn. Turn off power before working inside this equipment.
Description
This neutral kit consists of the following parts on a plastic base:
1. One (1) Neutral assembly
2. Two (2) 8-32 X 3/8” mounting screws
3. One (1) Poly propylene insulators
4. One (1) Bond strap
5. One (1) 10-32 X 1/4” Slotted screw
Mounting Instruction
1. Tighten mounting screws in to mounting hole in the enclosure ensuring item 3 (insulator) beneath neutral asm. Ref. Fig 1
2. Remove item A neutral screw qty 1 & retain it. Ref. Fig 2
3. Insert item 4 (Bond strap) in neutral assembly as shown in Fig 2 & install it using item 5 screw.
4. Reinstall item A neutral screw on other end removed in step 2.
Wire range: 12 – 1/0 CU/AL
These instructions do not purport to cover all details or variations in equipment nor to provide for every possible contingency to be met in connection with installation operation or maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s purposes, the matter should be referred to the GE Company.
g
Fig 1
Fig 2
General Electric Company 41 Woodford Ave., Plainville, CT. 06062 DEH44149 R01 08/07 © 2007 General Electric
Visit us on the web at www.GEindustrial.com
GE Consumer & Industrial
Loading...