DEH44149 Installation Instructions
g
Neutral mounting kit
Catalog number – TNK100
Introduction
This bulletin provides instructions for
installing Neutral lug kit – TNK100 on all
GE Double throw safety switch rated
100A & below
WARNING: Hazard of electrical shock or
burn. Turn off power before working
inside this equipment.
Description
This neutral kit consists of the following
parts on a plastic base:
1. One (1) Neutral assembly
2. Two (2) 8-32 X 3/8” mounting screws
3. One (1) Poly propylene insulators
4. One (1) Bond strap
5. One (1) 10-32 X 1/4” Slotted screw
Mounting Instruction
1. Tighten mounting screws in to
mounting hole in the enclosure ensuring
item 3 (insulator) beneath neutral asm.
Ref. Fig 1
2. Remove item A neutral screw qty 1 &
retain it. Ref. Fig 2
3. Insert item 4 (Bond strap) in neutral
assembly as shown in Fig 2 & install it
using item 5 screw.
4. Reinstall item A neutral screw on other
end removed in step 2.
Wire range: 12 – 1/0 CU/AL
These instructions do not purport to cover all details or variations in equipment nor to provide
for every possible contingency to be met in connection with installation operation or
maintenance. Should further information be desired or should particular problems arise which
are not covered sufficiently for the purchaser’s purposes, the matter should be referred to the GE
Company.
g
Fig 1
Fig 2
General Electric Company
41 Woodford Ave., Plainville, CT. 06062
DEH44149 R01 08/07 © 2007 General Electric
Visit us on the web at www.GEindustrial.com
1
GE Consumer & Industrial