g
GEH5598 Installation Instructions R02
Spectra Series™ Power Panelboards
Permanent Circuit Markers
WARNING: Danger of electrical shock or injury.
Turn
OFF
switchboard before workin
ment or removing any component.
e
Equipment is to be installed and maintained b
properly trained and qualified personnel only.
These instructions apply to installation of catalog
numbers APN49 (for numbers 1–49) and APN99 (for
numbers 1–99). Table 1 lists the contents of the marker
kits. Table 2 lists the marker strips used for various interior
heights.
Cat. No. Description Qty.
252B1679P1 Marker strip (5X), 10 circuits 2
252B1679P2 Marker strip (10X), 20 circuits 2
252B1679P3 Marker strip (13X), 26 circuits 2
N605P13005B Thread-forming screw, #6-32 x 5/16 24
264V287P1–49
264V287P1–99
Table 1. Contents of the permanent circuit marker kits.
Table 2. Marker strips to use for various interior heights.
Permanent marker tabs (in APN49)
Permanent marker tabs (in APN99
Interior Height,
X = 1
ower ahead of the panelboard or
inside the
3
/8"
13 252B1679P3
18
23
28
33
38
43
48
53
Marker Strips,
Two Each
252B1679P1
252B1679P3
252B1679P2
252B1679P3
252B1679P1
252B1679P2
252B1679P3
252B1679P2
252B1679P3
252B1679P1
252B1679P2
252B1679P3
252B1679P2
252B1679P3
252B1679P1
252B1679P2
252B1679P3
252B1679P2
252B1679P3
49
99
Drill the Mounting Holes
WARNING: Eye protection is required for this operation.
Use a marker as a template. Place the strip at the
dimension shown in Figure 1 (from the outside edge of
the side trim) and directly opposite the mounted devices.
Drill a 0.120-inch diameter hole (#31 drill) at each end of
the marker. Some markers will have more than two holes,
depending on their lengths.
Install the Marker Strips
Insert a marker into the retainer strips mounting holes
next to the circuit to be identified. Form the marker legs
over to secure the marker in the mounting strip hole.
When all the required circuit markers are attached, install
the retainer strip to the front shield with the #6-32 panhead thread-forming screws provided, as shown in Figure
2.
Figure 1. Drilling the mounting holes.
Figure 2. Installing the marker strips.
These instructions do not cover all details or variations in equipment nor do they provide for every possible
contin
information be desired or should
purposes, the matter should be referred to the GE Company.
ency that may be met in connection with installation, operation, or maintenance. Should further
articular problems arise that are not covered sufficiently for the purchaser’s
GE Industrial Systems
General Electric Company
41 Woodford Ave., Plainville, CT 06062
GEH5598 R02 0501 © 2001 General Electric Company