GE Industrial Solutions Spectra Series Power Panelboards Permanent Circuit Markers User Manual

g
p
g
quip
y
GEH5598 Installation Instructions R02
Spectra Series™ Power Panelboards
Permanent Circuit Markers
WARNING: Danger of electrical shock or injury. Turn
OFF
switchboard before workin
ment or removing any component.
e Equipment is to be installed and maintained b properly trained and qualified personnel only.
These instructions apply to installation of catalog numbers APN49 (for numbers 1–49) and APN99 (for numbers 1–99). Table 1 lists the contents of the marker kits. Table 2 lists the marker strips used for various interior heights.
Cat. No. Description Qty.
252B1679P1 Marker strip (5X), 10 circuits 2 252B1679P2 Marker strip (10X), 20 circuits 2 252B1679P3 Marker strip (13X), 26 circuits 2
N605P13005B Thread-forming screw, #6-32 x 5/16 24
264V287P1–49 264V287P1–99
Table 1. Contents of the permanent circuit marker kits.
Table 2. Marker strips to use for various interior heights.
Permanent marker tabs (in APN49) Permanent marker tabs (in APN99
Interior Height,
X = 1
ower ahead of the panelboard or
inside the
3
/8"
13 252B1679P3
18
23
28
33
38
43
48
53
Marker Strips,
Two Each
252B1679P1 252B1679P3
252B1679P2 252B1679P3
252B1679P1 252B1679P2 252B1679P3
252B1679P2 252B1679P3
252B1679P1 252B1679P2 252B1679P3
252B1679P2 252B1679P3
252B1679P1 252B1679P2 252B1679P3
252B1679P2 252B1679P3
49 99
Drill the Mounting Holes
WARNING: Eye protection is required for this operation.
Use a marker as a template. Place the strip at the dimension shown in Figure 1 (from the outside edge of the side trim) and directly opposite the mounted devices. Drill a 0.120-inch diameter hole (#31 drill) at each end of the marker. Some markers will have more than two holes, depending on their lengths.
Install the Marker Strips
Insert a marker into the retainer strips mounting holes next to the circuit to be identified. Form the marker legs over to secure the marker in the mounting strip hole. When all the required circuit markers are attached, install the retainer strip to the front shield with the #6-32 pan­head thread-forming screws provided, as shown in Figure
2.
Figure 1. Drilling the mounting holes.
Figure 2. Installing the marker strips.
g
g
p
These instructions do not cover all details or variations in equipment nor do they provide for every possible contin information be desired or should purposes, the matter should be referred to the GE Company.
ency that may be met in connection with installation, operation, or maintenance. Should further
articular problems arise that are not covered sufficiently for the purchaser’s
GE Industrial Systems
General Electric Company 41 Woodford Ave., Plainville, CT 06062
GEH5598 R02 0501 © 2001 General Electric Company
Loading...