GE Industrial Solutions Spectra Series Power Panelboards APF Surface Front Trim User Manual

g
p
g
quip
y
GEH5587 Installation Instructions R03
Spectra Series™ Power Panelboards
Surface Front Trim, Type APF
Installation
WARNING: Danger of electrical shock or injury.
OFF
Turn switchboard before workin e
ment or removing any component. Equipment is to be installed and maintained b properly trained and qualified personnel only.
1. All type APP filler plates, the main lug cover (if
applicable), and C/B covers (if applicable) should be in place, and all wiring should be complete before starting the trim assembly. For ease of assembly, ADS Fusible Switch device side fillers should be installed after the front trim is in place.
2. Fasten the end trims (with turned edges toward the
interior) to the box with the screws provided, as shown in Figure 1. Do not tighten the screws. The end trim with the cutout should be installed on the load end of the box.
ower ahead of the panelboard or
inside the
End Trim
4. Slide a side trim over the turned edge of the box. The
tabs extending from the ends of the side trim slide under the end trims. Rest the side trim on the bottom end trim to help align the mounting holes. The ends of any installed filler plates and, in some cases, flanges on devices, should fit into the channel (if applicable) on the inner edge of the side trim. See Figure 2.
Side Trim
Type APP Filler
Plate
Figure 1. Installation of the end trims. (Top feed is shown.)
3. Make sure that all positions on the interior between
the end trims are occupied with a device or an appropriate type APP filler plate, as shown in Figure 1.
Label
Filler Plate
End Trim
Screw Side Trim
to End Trim
Figure 2. Installation of the side trims.
5. Insert screws into the top and bottom end trim holes,
then into the side trim holes. Do not tighten the screws.
6. Secure the opposite side trim in the same manner as
steps 4 and 5.
7. Any open spaces between the installed devices and the
side trims should be covered with the filler plate supplied with the device or with an appropriate type APF filler plate.
To install the APF filler plate, insert the flat end into the channel on the inner edge of the side trim. Secure the opposite end to the flange on the device with the screws supplied and tighten to 25–30 in.-lb. There should be no unoccupied spaces when installation is complete, as shown in Figure 3.
8. Adjust the trims for proper fit, then tighten all screws
to 25–30 in-lb.
9. Apply the GE Logo to the panel front end trim. For
g
g
p
OEM and Distributor Stock Panels apply the
RATINGS SEE
label to the panel front end trim.
Type APF
Filler Plate
Figure 3. Installation of Type APF filler plate.
FOR
These instructions do not cover all details or variations in equipment nor do they provide for every possible contin information be desired or should purposes, the matter should be referred to the GE Company.
ency that may be met in connection with installation, operation, or maintenance. Should further
articular problems arise that are not covered sufficiently for the purchaser’s
GE Industrial Systems
General Electric Company 41 Woodford Ave., Plainville, CT 06062
GEH5587 R03 0401 © 2001 General Electric Company
Loading...