GEH5582 Installation Instructions R02
g
Spectra Series™ Fusible Switch Units
200 Ampere Expansion Kit (J and T Fuses)
WARNING: Danger of electrical shock or injury.
Turn
Installing the Expansion Kit
1. Remove the switch. Loosen the rail latch screws and
remove the s wi tch b y pu ll in g u p on the la tc h han dle s
while pulling the device from the equipment, as
shown in Figure 1.
2. Prepare the enclosure. Remove and discard the
blank cover and the bottom insulator from the
bottom of the device, as shown in Figure 2.
3. Install the straps. Install the connecting straps with
the #10-32 x
3. Tighten the screws to 27–32 in-lb.
OFF power ahead of the panelboard or
switchboard before working inside the
equipment or removing any component
not remove circuit protective devices or any
other component until the power is turned
OFF.
1
/2" screws provided, as shown in Figure
. Do
Bottom
Insulator
Blank
Cover
Figure 2. Removing the blank cover and bottom insulator.
Rail Latch
Screw
Figure 1. Removing the switch from the equipment.
Latch
Handle
Strap
#10-32
Screw
Figure 3. Installing the connecting straps.
4. Install the kit. Remove and save the hex nuts from
the studs and the red arc cover on the expansion
switch, as shown in Figure 4. Install the expansion
plate into the enclosure, positionin g the switch base
over the connecting straps. Install #10-32 screws with
washers into the connecting straps inside the switch
base. Tighten the screws to 27–32 in-lb.
Replace the hex nuts back onto the plate stu ds and
tighten to 27–32 in-lb. Replace the red arc cover, as
shown in Figure 5, and tighten the screws to 12–15
in-lb.
5. Install the load base. Install the load base into the
enclosure, as shown in Figure 6. The position
depends on the fuse type, as illustrated in Figure 5
and listed in Table 1. Tighten the mounting screws
to 40–50 in-lb. For a type J fuse, install a fuse barrier,
as shown in Figure 7, and tighten the mounting
screws to 27–32 in-lb.
Position Fuse Type
1 T Fuse 240 V
2
J Fuse 600 V
T Fuse 600 V
Table 1. Position for the load base in the enclosure.
#10-32
Screw with
Washer
Figure 4. Installing the expansion plate into the enclosure.
Hex
Nuts
Red Arc
Cover
Load
Base
Figure 6. Installing the load base.
Arc
Cover
Figure 5. Replacing the arc cover.
Position 1
Position 2
Fuse
Figure 7. Installing the fuse barrier for type J fuses.