GE Industrial Solutions AMCB4GB, AMCB6GB User Manual

g
p
g
quip
y
Application
These instructions apply to bolt-on circuit breaker kits with catalog numbers AMCB6GB and AMCB4GB.
For use with circuit breaker types SGH, SGL and SGP.
For use with circuit breaker cover kit AFP4SGD.
WARNING: Danger of electrical shock or injury.
OFF
Turn switchboard before workin e Equipment is to be installed and maintained b properly trained and qualified personnel only.
ower ahead of the panelboard or
inside the
ment or removing any component.
DEH40129 Installation Instructions R03
Spectra Series™ Power Panelboards
Bolt-On Circuit Breaker Kits
Figure 1. Parts included in the kits AMCB4GB and AMCB6GB.
In the following instructions numbers in brackets in the text and figures refer to the items in Table 1.
1. Confirm the contents of the kit. These kits are used to install double-branch G-frame Spectra circuit breakers into Spectra APNB bolt-on–style interiors. The vertical space required for each kit is 5.50 inches (4X).
Figure 1 illustrates the parts included in this kit, which are listed in Table 1.
Item Part # Description
1 192A6976P189 Thread-forming screw, #10-32 x 7/16"44 2 252B3575P1 Circuit breaker mounting bracket 2 2 3 208C2291P1 Filler center 2 2 4 252B3613P1 Antiturn clip 2 3 5 252B3618G10 G Frame double strap 2 2 6 252B3618G11 G Frame double strap 1 1 7 75A105503P101 Conical spring washer, 1/4" 44 8 75A105503P105 Conical spring washer, 5/16" 46
9 DEH40129 Installation instructions 1 1 10 N22P23012B6 Hex-head bolt, 5/16-18 x 3/4" 46 11 N245P21B6 Nut, 1/4-20 2 3 12 N37P21969B6 Machine screw, 1/4-20 x 33/4" 44 13 N402P11B6 Flat washer, 1/4" 44 14 N657P21024B6 Carriage bolt, 1/4-20 x 11/2" 23 15 N730BP1308B6 Thread-forming screw, #6 x 1/2" 44
Table 1. Parts list for kits AMCB4GB and AMCB6GB.
Qty. in
AMCB4GB
Qty. in
AMCB6GB.
2. Locate the side of the interior with a 2.75-inch
p
reference distance. The circuit breaker straps are mounted on the side of the panel interior bus at which the distance from the vertical bus face to the inner face of the bus-support rail is 2.75 inches, as indicated in Figure 2.
4. Three-phase installations. Use the following procedure for all three-phase installations (kit AMCB6GB).
4a. Install carriage bolt assemblies. Position the
carriage bolt [14] and antiturn clip [4] assemblies as shown in Figures 5 and 6.
Edge of G
Frame
Edge of G
Frame
Figure 2. Illustration of the 2.75-inch reference distance.
3. Assemble antiturn clips onto carriage bolts. Slide an antiturn clip [4] over the square shank of each carriage bolt [14], as shown in Figure 3. Figure 4 illustrates the installation of a bolt and antiturn clip onto the interior, as called for in the remaining steps.
Figure 3. Assembling an antiturn clip [4] with a carriage bolt [14].
Figure 5. Carriage bolt and antiturn clip installation for three-phase
connections.
Figure 6. Carriage bolt and antiturn clip installation for three-phase
connections, isometric view.
4b. Install straps. Place the G frame straps [5, 6] over
the carriage bolts and antiturn clips, as shown in Figures 7 and 8. Place conical washers [7] on the bolts and secure with nuts [11]. Leave the connections finger tight.
If the group assembly selection is three-phase and the assembly looks like Figure 8, then go to step 6.
Edge of G
Frame
Figure 4. Installing a carriage bolt [14] and antiturn clip [4] into the
interior.
NOTE: For three-phase installations, continue with ste
4. For two-pole installations, proceed
to step 5.
Edge of G
Frame
Figure 7. Installing the straps for three-phase connections.
Figure 8. Installing the straps for three-phase connections, isometric
view.
Loading...