• Proper installation is the responsibility
of the installer. Product failure due to improper
installation is not covered under the warranty. See
Owner’s Manual for warranty information.
• Use this appliance only for its intended purpose.
•
Check with local utilities for electrical codes that
apply in your area. Local codes vary. Installation
electrical connections and grounding must
comply with applicable codes. In the absence
of local codes, the drawer should be installed
in accordance with National Electrical Code ANSI/
NFPA 70-1990 or latest edition.
WARNING
This appliance must be properly grounded.
See “Grounding the Appliance.”
For Monogram local service in your area,
1.800.444.1845.
For Monogram Service in Canada,
call 1.800.561.3344.
For Monogram Parts and Accessories,
call 1.800.626.2002.
If you received a damaged warming drawer,
you should contact your de a l e r.
WARNING
An anti-tip brace must be installed to prevent
the drawer from tipping forward when opened
and loaded. Failure to do so could result in
personal injury.
2
Page 3
CONTENTS
Design Information
Design Information
Models Available ......................................................................3
This kit provides for the installation of a custom
front panel on 27” and 30” models.
NOTE: The original drawer front will be removed
and discarded when this kit is used. The tubular
handle can be reinstalled onto the custom panel
with longer screws (not provided). Or, the original
handle can be replaced with a custom handle of
your choice. (Handle is not supplied.) Choose a
custom handle to match or complement cabinetry
hardware.
ZXD30P:
This kit provides for the installation of a stainless
steel professional style door with handle for 30”
models.
NOTE: The ZXD30P professional drawer panel with
handle is a one-piece assembly that replaces the
original drawer front and tubular handle. The original
tubular handle (or a custom handle) cannot be
installed onto this professional drawer panel.This
ZXD30P accessory is designed to fit 30” warming
drawers manufactured after February 2006.
3
Page 4
Design Information
PRODUCT DIMENSIONS AND CLEARANCES
A
Drawer
Open
1”
A B C
ZTD910 22” 26” 30”
ZTD910 w/ZXD30P 23-1/4” 27-1/2” 30”
ZKD910 22”26” 26-3/4”
23-1/4”
B
Including
Handle
Dimensions
ADVANCE PLANNING
• The drawer may be installed below a countertop, a
cooktop, a single or double oven and side by side using 2
drawers.
• The warming drawer can be installed below approved
cooktops. Allow 2” min. clearance from bottom of cooktop
burner box to top of warming drawer cutout. See page 8.
• The warming drawer can be installed below approved
ovens. Allow a 2” min. clearance between cutouts.
Additional clearances may be required. See page 7.
9”
C
10-1/2”
• Electrical power cord is located on the right side of the
warming oven. Locate the outlet within reach of the 56”
long power cord in an adjacent cabinet, within 42” of the
right side or 16” from the left side of the cutout. A recessed
receptacle can be installed on the right side of the cutout,
7” max. from the rear of cabinet.
4
Page 5
Design Information
GROUNDING THE APPLIANCE
Please read carefully.
FOR PERSONAL SAFETY, THIS APPLIANCE MUST BE PROPERLY
GROUNDED.
Do not use an extension cord or adapter plug with this
appliance. Follow National electrical codes or prevailing
local codes and ordinances.
This warming drawer must be supplied with 120V, 60Hz,
and connected to an individual, properly grounded branch
circuit, and protected by a 15 or 20 amp circuit breaker or
time delay fuse.
Please read carefully.
The power cord of this appliance is equipped with a 3-prong
(grounding) plug that mates with a standard 3-prong
grounding wall receptacle to minimize the possibility
of electric shock. The customer should have the wall
Rating Plate
• A properly grounded 3-prong receptacle should be located
within reach of the drawers’ 56” long power cord.
• Locate the receptacle in an adjacent cabinet.
– within 42” of the right side or,
– within 16” of the left side or,
– A recessed receptacle may be located on the right side
of the cutout, 7” from the back of the cabinet. In this
location, the excess power cord should be coiled and
taped to the right side of the unit.
• When two warming drawers are installed side to side, they
can operate from the same receptacle.
receptacle and circuit checked by a qualified electrician to
make sure the receptacle is properly grounded and has the
correct polarity.
• Where a standard 2-prong wall receptacle is encountered,
it is the personal responsibility and obligation of the
customer to have it replaced with a properly grounded
3-prong wall receptacle.
Do not, under any circumstances, cut or remove the third
(ground) prong from the power cord.
DO NOT USE AN EXTENSION CORD WITH THIS APPLIANCE.
Recessed
Receptacle
7” Max. From
Rear on Right
Side
Drill 1-1/2” Hole
For Power Cord
For Left or Right
Side Outlet
Location
5
Page 6
Installation Preparation
TOOLS REQUIRED
Hand Saw
Drill and
1/16” Bit
Phillips Screwdriver
Safety Glasses
Measuring Tape
Level
MATERIALS REQUIRED (provided)
4 Wood Screws
MATERIALS REQUIRED (not provided)
2x2 or 2x4
Wood Block
for Anti-Tip
Security
Adhesive or other hardware for installing
runners or shelf to support warmer drawer
Runners must be level, rigidly mounted and capable
of supporting 150 pounds.
2x2 or 2x4
Lumber for
Runners
REMOVE PACKAGING
• Place carton on a flat surface.
• Open one end of the carton and lift off the top
piece.
• Lift the warmer up and out of the carton.
• Place the drawer on top of the shipping carton to
protect the drawer front and the finished flooring.
• Remove all packing materials and tape.
• Locate package containing 4 wood screws and set
aside.
Parts provided:
• 4 Wood Screws.
6
Page 7
INSTALLATION OPTIONS
Installation Preparation
Installation Below
a Single Oven
23-1/2”
Min. Inside
2x2 or 2x4 Anti-Tip
Block Against Rear
Oven
Cutout
9”
9-1/4”
A
1” Min. Above Toekick or Adjust
to Oven Installation Height
NOTE: Additional clearance between cutouts may
be required. Check to be sure that oven supports
above the Warming Drawer location does not obstruct
the required interior 23-1/2” depth and 9-1/4” height.
Wall, 9” From Floor
to Bottom of Block
2” Min.
Allow 5/8”
Overlap on
All Sides
23-1/4”
10-1/2”
B
Dimensions
A B
ZTD910 28-1/2” 30”
ZKD910 25-1/2” 26-3/4”
1” Min. Above Toekick
9”
9-1/4”
Installation Below
a Double Oven
23-1/2”
Min. Inside
2x2 or 2x4 Anti-Tip
Block Against Rear
Wall, 9” From Floor
to Bottom of Block
Oven
Cutout
A
NOTE: Additional clearance between cutouts may
be required. Check to be sure that oven supports
above the Warming Drawer location does not obstruct
the required interior 23-1/2” depth and 9-1/4” height.
Allow 5/8”
Overlap on
All Sides
2” Min.
23-1/4”
B
10-1/2”
When installed under a wall oven:
Warming drawers are approved for installation below only
The rough opening for the drawer must be:
– Depth: 23-1/2” min. from inside back to front of cabinet
certain specified wall oven models. See the label attached to
the top of the warming drawer for approved models.
– Width: 25-1/2” for 27” wide models, 28-1/2” for 30” wide
• When installed, the front face of the drawer will be nearly
flush with adjacent cabinetry doors.
• Drawer overlaps will conceal cut edges on all sides of the
– Height: 9-1/4”.
– Allow 2” min. between oven and drawer cutouts for
opening.
NOTE: If you are installing in frameless cabinets, it may
be necessary to install 1/2” wide cleats to accept drawer
mounting screws. See drawer for mounting screw locations.
7
frame.
models.
clearance of overlaps.
Page 8
Installation Preparation
INSTALLATION BELOW A COUNTERTOP
Electrical Outlet
Flush With Side of
Electrical
Outlet 16”
Max. From
Left Side
Install 2x4 or 2x2 Anti-Tip Block
Against Rear Cabinet Wall 9”
From Floor to Bottom of Block
9”
Cabinet 7” Max.
7”
Electrical Outlet 42”
Max. From Right Side
Install a Solid Barrier
Below a Cooktop
See Note
A
25”
1” Min.*
9-1/4”
1-1/2” Cabinet Top
36”
Countertop
Height
Solid Barrier
1/4”
Air
23-1/2” Min.
• When installed, the front face of the drawer will be
nearly flush with adjacent cabinetry doors.
• Drawer overlaps will conceal cut edges on all sides of
the opening.
The rough opening for the drawer must be:
– Depth: 23-1/2” min. from inside back to front of cabinet
frame.
– Width: 25-1/2” for 27” wide models,
28-1/2” for 30” wide models.
– Height: 9-1/4”.
• 5” min. above floor or 1” above toekick. 23-1/4”
from floor to bottom of cutout is recommended for under
countertop installation.
Installation below a cooktop:
Gap
Install a Solid Barrier
and a 1/4” Air Gap
Above Warming Drawer
*NOTE: When installing the warming drawer below a cooktop, a solid barrier
must be installed at least 1” from the lowest point of the bottom of cooktop
burner box to the top of cutout. Use any solid material such as 1/4” thick
plywood. Allow at least 1/4” air gap between the barrier and the top of the
warming drawer. See label on top of the warming drawer for approved
cooktop models.
Installation below a cabinet drawer:
The warming drawer may be installed beneath a cabinet
drawer. In this installation, a solid barrier should be installed
above the warming drawer to block access. Use any solid
material such as 1/4” thick plywood. Allow at least 1/4”
air gap between the barrier and the top of the warming
drawer. Observe the 5” min. above the floor or 1” above the
toekick minimum installation height.
NOTE: If you are installing in frameless cabinets, it may
be necessary to install 1/2” wide cleats to accept drawer
mounting screws. See drawer to find exact locations of
mounting screws.
Side to Side Installation:
Install two warming drawers in separate cutouts.
Allow 2” min. between cutouts.
Warming drawers are approved for installation below only
certain specified cooktop models. See the label attached
to the top of the warming drawer for approved models. A
solid barrier and air gap between cooktop and warming
drawer is required. See Note above.
Dimensions
A
ZTD910 28-1/2”
ZKD910 25-1/2”
2”
Min.
Side to Side Installation
8
Page 9
PROVIDE CABINET SUPPORT
Installation
2”x4” or
Equivalent Runners
23-1/2”
22”
27”
IMPORTANT: When installed below a single or double oven, check to be sure
that any oven supports above the cutout do not obstruct the 23-1/2” required
depth of the warming drawer cutout.
• A 2” min. clearance between oven and warming drawer
cutouts are required. Additional clearance may be
required if 2 x 4 blocks are used to support runners or
solid floor of the oven above.
• The warmer drawer may be supported by either a solid
bottom, 2 x 4 or 2 x 2 runners.
2”x4” or
Equivalent Runners
23-1/2”
25”
30”
• The support must be level and rigidly mounted, flush with
the bottom edge of the cutout.
– There is no way to level the drawer once it has been
installed. Be sure supports are level.
• The entire weight of the drawer is supported by the
runners or solid floor and must be capable of supporting
150 lbs.
STEP 1
INSTALL ANTI-TIP BRACKETS
WARNING
ANTI-TIP PRECAUTIONS
An anti-tip brace must be installed to prevent the
drawer from tipping forward when opened and
loaded. Failure to do so could result in personal
injury.
STEP 2
• Slide the left corner of the drawer into the opening.
• Push the power cord into the hole leading to the outlet
location. Thread the cord through as the drawer is being
pushed back into the opening. Check to be sure the
power cord does not get trapped under the drawer.
– If the outlet is installed inside the opening, plug the cord
into the outlet. In this location, the excess power cord
length should be coiled and taped to the right side of
the unit.
• Push the drawer back until the front flange is flush to the
cabinet front.
INSTALL WARMING DRAWER
Install 2x4 or 2x2
Anti-Tip Block
Against Rear
Cabinet Wall 9”
9”
2x4 or 2x2
Runners or Solid
Bottom
• Open the drawer fully.
• Drill pilot holes through the holes in the overlapping
frame, one on each corner.
• Drive the wood screws provided into each corner.
From Floor to
Bottom of Block
9
Page 10
Installation
A
Instructions
WARMING DRAWER CUSTOM
PANEL ACCESSORY KIT
ZXD27B AND ZXD30B
For installation of 27” and 30” wide warming
drawer custom panel and custom handle.
BEFORE YOU BEGIN
Read these instructions completely and carefully.
• IMPORTANT– Save these instructions for
local inspector’s use. Observe all governing codes and
ordinances.
• Note to Installer – Be sure to leave these instructions
with the Consumer.
• Note to Consumer – Keep these instructions with your
Owner’s Manual for future reference.
TOOLS AND MATERIALS REQUIRED
• Phillips screwdriver
• Drill and appropriate bits
(Brad point recommended for drilling through wood
panels)
• Custom panel
• Custom handle (optional)
• Adhesive recommended for metal to wood
• Adhesive recommended for plastic to wood
STEP 1
PREPARE DRAWER
FOR PANEL INSTALLATION
• Open the drawer fully.
• Turn the warming drawer off.
STEP 2
REMOVE ORIGINAL
DRAWER FRONT
• Remove the two screws on each side and the one
screw at the bottom of the drawer edge.
• Remove the two screws on the inside of the drawer at
the top. Retain all screws.
– Support the drawer front as you remove screws to
prevent the possibility of falling.
PARTS SUPPLIED
• Lamp Jewel
• Metal mounting panel
This kit contains a mounting panel to support a trimless
custom drawer front up to 3/4” thick. The tubular handle
can be reinstalled onto the custom panel with longer
screws (not provided). Or, the original handle can be
replaced with a custom handle of your choice. (Handle
is not supplied.) Choose a custom handle to match or
complement cabinetry hardware.
IMPORTANT: The warming drawer should be installed
according to the installation instructions packed with the
product. The original drawer front will be removed and
replaced with a custom panel.
• Cut edges of the drawer panel will be seen and must
be finished for best appearance.
• The custom drawer front panel, both raised and flat
design, should be constructed in the same manner as
typical cabinet doors.
• Order the custom drawer panel from the cabinet
manufacturer. Be sure to provide the exact dimensions
so that the panel is constructed accurately.
• Order the optional custom handle to complement or
match surrounding cabinetry handles.
STEP 3
• The custom panel must be sized to fit the dimensions
shown for your model.
• Drill a 5/16” diameter hole through the appearance
side of the panel. This hole will allow the indicator “ON”
light to be visible through the custom panel. The cut
edges will be covered by the overlap of the lamp jewel.
– A Brad point drill bit is recommended.
10-1/2"
PREPARE CUSTOM PANEL
Drill 5/16" Dia.
Through Custom
Panel For Lamp Jewel
A = 26-3/4” for 27” Wide Models
A = 30” for 30” Wide Models
1-3/4"
1-13/16"
10
Page 11
Installation
STEP 4
SECURE CUSTOM PANEL
TO METAL MOUNTING PANEL
• Lay the custom panel, appearance side down, on a
clean surface.
• Place the flat side of the metal panel onto the back
side of the custom panel, with the mounting flanges
facing up.
• Align the lamp hole in the panel with the mounting
panel.
• Check top, bottom and side overlap dimensions from
the metal panel to wood panel edge as shown.
1/4"
Align Holes
Back side of Appearance Panel with Support Panel
STEP 5
FOR PANELS LESS
Top
Handle
Attachment Holes
Bottom
3/16"
1/4"
7/32"
THAN 3/4” THICK
• Separate the custom panel and metal panel.
• Apply a few horizontal beads of adhesive to the metal
panel. Avoid adhesive within 1” of lamp hole area and
outer edges.
STEP 6
Turn the assembly appearance side up.
• Use plastic to wood adhesive to secure the lamp jewel
to the front of the wood panel. On the side with the
bulge, (see illustration) apply a small bead of adhesive
around the outside edge. Place the jewel into the
drilled hole.
This Side
Against
Wood
STEP 7
INSTALL LAMP JEWEL
Appearance
Side
REINSTALL ORIGINAL
Insert
Jewel
HANDLE OR OPTIONAL
CUSTOM HANDLE
A custom handle (not supplied) may be installed.
• Drill pilot holes through the front of the custom panel
and through the metal panel to match the chosen
handle.
NOTE: The handle screws should be installed through
the metal panel, the custom panel and into the custom
or original handle.
STEP 5A
FOR 3/4” (OR GREATER)
THICK PANELS
3/4” thick panels may be secured to the metal panel
with screws.
• Use the metal panel as a template. Position the metal
panel over the back side of the custom panel and drill
pilot holes. Drill pilot holes sized to match screws being
used (screws not provided).
CAUTION:Select screw length carefully to
avoid penetration of the finished side.
STEP 8
INSTALL ASSEMBLED PANEL
TO THE DRAWER
• Install the custom panel assembly to the exposed
drawer front using the original 7 screws.
Custom Handle
or Original Handle
11
Page 12
Installation
PROFESSIONAL STYLE PANEL
ACCESSORY KIT
Instructions
BEFORE YOU BEGIN
Read these instructions completely and carefully.
• IMPORTANT– Save these instructions for
local inspector’s use. Observe all governing codes
and ordinances.
• Note to Installer – Be sure to leave these
instructions with the Consumer.
• Note to Consumer – Keep these instructions for
future reference.
TOOL AND MATERIALS REQUIRED
• Phillips screwdriver
PARTS SUPPLIED
ZXD30P
STEP 2
REMOVE ORIGINAL
DRAWER FRONT
• Remove the three screws from the bottom of the
drawer edge.
• Remove the four screws on the inside of the
drawer at the top. Retain all screws.
– Support the drawer front as you remove screws
to prevent the front panel from falling
.
Stainless Steel Professional Style Drawer
Accessory
This kit contains a stainless steel professional style
panel with a handle and a lamp jewel imbedded in
the bottom right side. Install the warming drawer
according to the installation instructions packed
with the product.
NOTE: The ZXD30P professional drawer panel with
handle is a one-piece assembly that replaces the
original drawer front and tubular handle. The original
tubular handle (or a custom handle) cannot be
installed onto this professional drawer panel. This
ZXD30P accessory is designed to fit 30” warming
drawers manufactured after February 2006.
STEP 1
PREPARE DRAWER FOR
PANEL INSTALLATION
IMPORTANT: The drawer must be installed into the
cabinet before opening the drawer.
• Open the drawer approximately halfway.
• Turn the warming drawer to “OFF.”
STEP 3
• Open the carton and remove the panel.
Remove all protective covering on both sides.
CAUTION:
away from babies and small children. Plastic could
pose a choking or suffocation hazard.
STEP 4
• Install the panel assembly to the exposed drawer
front using the original 7 screws.
REMO VE THE PACKAGING
Keep all plastic material
INSTALL PANEL ONTO DRAWER
12
Page 13
Notes
13
Page 14
Notes
14
Page 15
Notes
15
Page 16
31-10700-3
01-14 GE
Printed in the United States
NOTE: While performing installations described in this book,
safety glasses or goggles should be worn.
For Monogram® local service in your area,
call 1.800.444.1845.
NOTE: Product improvement is a continuing endeavor
at General Electric. Therefore, materials, appearance
and specifications are subject to change without notice.
GE Appliances & Lighting
General Electric Company
Appliance Park
Louisville, KY 40225
GEAppliances.com
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.