Slope Front
Ice Storage Bins
Order parts online (US only)
www.follettice.com
Installation and Parts Manual
Following installation, please forward this manual
to the appropriate operations person.
Follett Corporation
801 Church Lane • Easton, PA 18040, USA
Toll free (877) 612-5086 • +1 (610) 252-7301
www.follettice.com
Follett Europe Polska
Mokry Dwór 26C • 83-021 Wislina, Poland
+48 (58) 785-6140 • Fax +48 (58) 785-6159
www.folletteurope.com
205448R04
Welcome to Follett
Follett ® ice storage bins enjoy a well-deserved reputation for excellent performance, long-term reliability and
outstanding after-the-sale support. To ensure that this slope front bin delivers the same degree of service, we ask
that you take a moment to review this manual before beginning the installation of the bin. Should you have any
questions or require technical help at any point, please call our technical service group, +1 (877) 612-5086 (US
and Canada only) or +1 (610) 252-7301 (Worldwide) or +48 (58) 785-6140 (Europe and Middle East only).
Before you begin
After uncrating and removing all packing material, inspect the equipment for concealed shipping damage. If
damage is found, notify the shipper immediately and contact Follett Corporation so that we can help in the ling of
a claim, if necessary.
Important cautions
Avoid excessive tightening force when connecting to the bin drain tting.
Do not apply excessive heat if any sweating of ttings is necessary. Heat conduction through metal may
melt threads in plastic drain tting.
2