First Co HBXX User Manual

HBX / MBX SERIES
FAN COIL UNITS
INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS
**WARNING TO INSTALLER, SERVICE PERSONNEL AND OWNER**
Altering the product or replacing parts with non authorized factory parts voids all warranty or implied warranty and may result in adverse operational performance and/or a possible hazardous safety condition to service personnel and occupants. Company employees and/or contractors are not authorized to waive this warning.
GENERAL
The manufacturer assumes no re­sponsibility for equipment installed in violation of any code requirement.
These instructions give information relative to the installation of these fan coil units only. For other related equipment refer to the proper instruc­tions.
Material in this shipment has been inspected at the factory and released to the transportation agency in good condition. When received, a visual inspection of all cartons should be made immediately. Any evidence of rough handling or apparent damage should be noted on the delivery receipt and the material inspected in the pres­ence of the carriers representative. If damage is found, a claim should be filed against the carrier immediately.
FAN COIL UNIT
The installer must adhere strictly to all local and national code require­ments pertaining to the installation of this equipment. These units are de­signed to be installed in either an upflow or horizontal left or right side down position.
****** WARNING ******
Extreme caution must be
taken that no internal damage
will result if screws or holes are
drilled into the cabinet.
All fan coil units are U.L. Listed for installation with zero inches clear­ance to combustible materials. This includes the fan coil cabinet, dis­charge plenum and connecting ducts.
Sufficient clearance must be provided at the front of the fan coil to allow access to electrical controls and re­moval of the motor/blower assembly for servicing. This clearance distance should be approximately the same as the depth of the fan coil unit.
HORIZONTAL APPLICATION
HBX/MBX fan coil units are factory assembled for horizontal left side down application without any modifi­cation required. To convert to horizon­tal right side down, remove the hori­zontal drain pan and A-coil assembly, flip the horizontal drain pan over to the right side and re-install the horizontal drain pan and A-coil into the cabinet. Secure the forward edge of the hori­zontal drain pan with the leveler angle bracket. The unit should be leveled in such a way that there is slope toward the condensate drain nipple to assure positive drainage.
AIR DISTRIBUTION DUCTS
All duct work must be installed in accordance with National Fire Protec­tion Association Codes 90A and 90B. Ducts should be adequately insulated to prevent condensation during the cooling cycle and to minimize heat loss during the heating cycle. The return air duct must have the same free area as the opening provided on the fan coil unit. If there is no ducted return, applicable installation codes may limit the unit to installation only in a single story residence. In many cases it is acceptable to use ducting of the same size as the fan coil con­nections. However, unique arrange­ments or long duct runs must be
****** WARNING ******
Unit must not be operated during building construction due to excessive airborne dust and debris. The unit must not be operated under any circumstances without an air filter in place.
confirmed by a local professional. The manufacturer will not be responsible for misapplied equipment.
ELECTRICAL
Fan coil units with 10kW or less electric heat are provided with a termi­nal block for connection of 1 electrical service. Units with 15kW and 20kW are provided with dual circuit breakers for the connection of 2 electrical ser­vices and units with 25kW are pro­vided with 3 circuit breakers for the connection of 3 separate electrical services. (Figure 1) All wiring must comply with local and national code requirements. Units are provided with wiring dia­grams and nameplate data to provide information required for necessary field wiring. Knockouts are provided on the cabinet for connection of power supply. These units are provided with a Class 2 transformer for 24-volt control circuits. Should any add-on equip­ment also have a Class 2 transformer furnished, care must be taken to pre­vent interconnecting outputs of the two transformers by using a thermo­stat with isolating contacts.
L247B 9/03
INSTALLATION PRECAUTIONS
Installation of this fan coil should only be performed by a licensed con­tractor to ensure proper installation and the safety of the installer. The following are some precautions to be followed for typical installations.  Always use proper tools and equip­ment.  No wiring or other work should be attempted without first ensuring that the fan coil is completely discon­nected from the power source and locked out. Always verify that a good ground connection exists prior to en­ergizing any power sources.  Always review the nameplate on each unit for proper voltage and con­trol configurations. This information is determined from the components and wiring of the unit and may vary from unit to unit.
****** WARNING ******
Any devices such as fan switches or thermostats that have been furnished by the factory for field installation must be wired in strict accor­dance with the wiring diagram that is supplied with the unit. Failure to do so could result in damage to components and will void all warranties.
 When soldering or brazing to the unit, it is recommended to have a fire extinguisher readily available. When soldering close to metering devices or other components, heat shields or wet rags are required to prevent dam­age.  When the fan coil unit is in operation components are rotating at high speeds.  Units must be installed level to ensure proper drainage and opera­tion.  Check unit prior to operation to ensure that the condensate water will drain toward the drain connection. An overflow drain or an auxiliary drain pan under the fan coil may be required as a back up to a clogged primary drain.  Be sure that the drain pan is free from foreign material prior to start up.  Check filter media installation to ensure that it is installed correctly.
Use the directional arrows or other information on the filter to determine the proper flow direction.  Ensure that the air distribution sys­tem does not exceed the external static rating of the unit.
NOISE
These fan coil units are designed for quiet operation, however, all air condi­tioning equipment will transfer some amount of noise to the conditioned space. This should be taken into consideration when planning the lo­cation of the equipment.
MOUNTING
It is important to ensure that the fan coils are securely mounted and the structure is sufficient to support the weight of the equipment. All anchors for mounting the equipment must be placed and sized to ensure a safe and durable installation.
CAUTION: It is highly recom­mended that an auxilliary drain pan be located beneath the fan coil to prevent damage which may result from an overflow of the condensate pan.
COOLING COIL PIPING
These fan coil units are supplied with a direct expansion refrigerant coil. The suction and liquid refrigerant lines must be sized in accordance with the outdoor unit manufacturers recommendations.
****** WARNING ******
When connecting piping to
fan coil units, do not bend or
reposition the coil header tub-
ing for alignment purposes.
This could cause a tubing frac-
ture resulting in a refrigerant
leak when pressure is applied
to the system.
Condensate drain lines must be installed with adequate slope away from the unit to assure positive drain­age. Since the drain pan is located on the suction side of the blower, a negative pressure exists at the drain pan and a minimum trap of 1-1/2 inches must be provided in the drain line to assure proper drainage.
NOTE: If a Condensate Overflow Shut-off Switch, that is designed to be installed in the drain line, is used in place of a secondary drain line, then the cut-off switch should be located in the primary drain line be­tween the fan coil unit and the P-trap.
OPERATION AND MAINTENANCE
Pre-start Check
 Check that supply voltage matches nameplate data.  Ensure that the unit is properly grounded.  With power off, check blower wheel set screws for tightness and ensure that the blower wheels rotates freely and quietly.
Check that the refrigerant coil con-
nections and piping have been leak checked and insulated as required.
Start-up and Maintenance
Before start-up, all of the compo­nents should be given a thorough check. Optimal operation of this equipment requires cleanliness. Of­ten after installation of this equipment additional construction activities oc­cur. Care must be taken to protect the equipment from debris during these construction phases. All ac­cess panels and filters must be in place before operation of the units.
Fan
The fan should be inspected and cleaned, in conjunction with mainte­nance of the motor and bearings. It is important to keep the wheels clean in order to avoid imbalance and vibra­tion.
****** WARNING ******
Do not touch any rotating component with any object. Damage to the equipment and personal injury can occur.
Motor
Check motor connections to en­sure that they are secure and made in accordance with the wiring diagram.
The blower motor should be cleaned annually.
Filter
The air filter should be cleaned or replaced as often as necessary to prevent restriction of air flow. Always
replace the filter with the same type as originally furnished.
Coil
Any dust or other contaminants which accumulate on the heat trans­fer surfaces interferes with the air flow and impairs heat transfer. The coil must be kept clean by any of the following methods.
Cleaning with low pressure com-
pressed air.
Flushing or rinsing with water (a
detergent is advisable for greasy sur­faces).
Drain Piping
The drain should always be:
Connected or piped to an accept-
able disposal point sloped away from the unit at least 1/8" per foot
Checked before summer operationPeriodically checked during sum-
mer operation
Preventative Maintenance
To achieve maximum performance and service life of each piece of equip­ment a formal schedule of regular maintenance should be established and maintained.
****** WARNING ******
Always wear eye protection.When fan coil is operating,
some components are operating at high speeds. Personal injury can result from touching these items with any object All electrical and service access panels must be returned and secured in their proper place. Clear surrounding area of all tools, equipment and debris. Check the entire unit to ensure it's cleanliness.
24 VOLT
CLASS 2 WIRING
R
G
24V REMOTE
THERMOSTAT
W1
* W2
Y
COOLING CONTROL
OUTDOOR UNIT
W2 SECOND STAGE ELECTRIC HEAT 15KW THRU 25KW
*
***** WARNING ******
The manufacturer does NOT WARRANT equipment sub­jected to abuse. Metal chips, dust, drywall tape, paint over spray, etc. can void warranties and liability for equipment failure, personal injury and property damage.
R
G
W1
W2
C
RED
GREEN
WHITE
WHITE
BROWN
FAN COIL
UNIT
CIRCUIT 1
L1- L2
GND GND
30-60MBX 15 & 20 KW
CIRCUIT 2
L3- L4
FIELD WIRING FACTORY WIRING
Figure 2 Low Voltage Wiring
FIELD WIRING FACTORY WIRING
48-60MBX 25KW
Figure 1 Field Wiring Connections
GND
GND
GND
FIELD WIRING
FACTORY WIRING
CIRCUIT 1
L1- L2
CIRCUIT 2
L3- L4
CIRCUIT 3
L5- L6
Loading...