Manual Pull -Down Projection Screen
Elite Manual Series
USER’S GUIDE
Pre-installation
1. Carefully unpack the screen.
2. Always handle the screen in a leveled position on a clean surface.
INSTALLATION
Flush Wall M ounting
1. Measure the distance between the keyholes located on the back of the end cap
2. Mark the location of where the screen is to be installed for the pre-drilled hole.
3. After marking the area and drilling the hole, insert the proper screw into the drilled hole and leave
about 1/8” of an inch from the wall to mount the screen.
4. Mount your screen from the keyhole located on back of screen’s left and right end cap.
060817-DR www.elitescreens.com 1
Note: Chain and U bolt/D ring not included.
Flush Ceilin g Mounting
1. Measure the distance between the top screw holes located on
the top of the end caps.
2. Mark the location of where the screen is to be installed
for the pre-drilled hole.
3. Drill your hole, use a hollow wall anchor if needed
4. Insert the proper screw into the drilled hole and secure the
screen to the ceiling.
Ceiling Suspended Mounting (additional hardw are required)
Optional installatio n using a chain to hang the screen from the ceiling.
1. You can also hang the screen on a ceiling by using a chain and hang it by the two loops (models 71-120)
located on each end of the case or by the end cap’s ears (models 135-170).
SCREEN OPERATION
Note: Always pull the screen down or let it up in a 90-degree vertical angle. Do not allow the screen to touch
the screen case when the screen goes up or comes down to avoid damaging the screen material.
060817-DR www.elitescreens.com 2