Identification:
Y06
Technical Bulletin
Bulletin no:
Date:
Issuer:
Factory:
Subject
FRJ2007-03
21/03/07
C.CHAUSSAT
FRJ AUBUSSON
EMC reinforcement (Electro-Magnetic Conformity).
Model
Problem
Reason
Actions in
factory
Actions in
field
B3000 (all PNCs)
_
_
Addition of a green/yellow wire between speed controler and
motor + addition of a thermoconductive spacer between thermal
overload probe and motor windings.
Application date: Year 2007, Week 10 –
- This modification does not bring any PNC modification.
- This modification has not to be done systematically on the
machines built before this date. (except in case of operation
problems.)
POSTAL ADDRESS TELEPHONE TELEFAX
ELECTROLUX PROF. SAS ZI du mont 23200 AUBUSSON FRANCE +33 555832323 +33 555832340