EK-Quantum
Reflection PC-O11D XL D5 PWM D-RGB
DISTRIBUTION PLATE
USER GUIDE
Before you start using this product please follow these basic guidelines:
Please carefully read the manual before beginning with the installation process!
The EK Fittings require only a small amount of force to screw them firmly in place since the liquid seal is ensured by the rubber O-ring gaskets.
The use of corrosion inhibiting coolants is always recommended for any liquid cooling system. EKWB recommends any of the EKCryofuel for worry-free usage.
TABLE OF CONTENT
BOX CONTENTS |
4 |
PREPARING THE 011D XL CHASSIS |
5 |
INSTALLING THE DISTRIBUTION PLATE IN THE 011D XL |
7 |
RECOMMENDED DISTRIBUTION PLATE CONFIGURATIONS |
9 |
CONNECTING THE D-RGB LED STRIP |
11 |
CONNECTING THE PUMP |
11 |
TESTING THE LOOP |
12 |
SUPPORT AND SERVICE |
13 |
SOCIAL MEDIA |
13 |
- 3 -
Front mounting Bracket (1 pc) |
|
M3x6 DIN7380 (2 pcs) |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M3x8 DIN7991 (5 pcs) |
M3 Nut (2 pcs) |
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EK-Quantum Reflection PC-O11D XL |
|
|
D5 PWM D-RGB |
Allen Key 2mm (1 pc) |
EK-Loop Multi Allen Key |
|
||
|
- 4 - |
|