© 2009 Edge Lighting. All Rights Reserved.
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613
www.edgelighting.com
info@edgelighting.com
MS-SL-_
904-MS-SL-02
Installation Instructions for
Monorail Sloped Ceiling Standoffs
IMPORTANT INFORMATION
- This product is ETL listed for indoor dry locations.
- The product is intended to be used with Edge Lighting
Monorail systems only.
- Use Monorail standoffs where the Monorail sections join
together and approximately every 3 feet max throughout
the Monorail run.
SAVE THESE INSTRUCTIONS!
Install the Standoff Hardware
A
2
CEILING
3
1: Hold the Monorail section against the ceiling or use a plumb
bob to mark the sloped standoff locations onto the ceiling
(this may require more than one person).
2: Tap the anchors onto the marked locations up to the
threaded portion with a hammer.
3: Screw the threaded portion of the anchors in with a Phillips
screwdriver.
ANCHOR
4: Mount the integrated washer-nipple to the anchor with the
#8 screw provided.
5: Tighten the threaded post completely onto the integrated
washer-nipple.
Sloped Standoff Connector
Installation for Monorail Power Feed
Canopies
C
1.5MM ALLEN
WRENCH
1
M3 SET SCREW
THREADED
POST
SLOPED STANDOFF
CONNECTOR
B
4
1: Push the sloped standoff connector completely into the
threaded post and tighten the M3 set screw with the 1.5mm
Allen wrench.
ANCHOR
#8 SCREW
INTEGRATED
WASHER-NIPPLE
5
THREADED POST
1
Sloped Standoff Connector Surface TransformerInstallation for
D
THREADED
POST
JOINING ROD
1
1.5MM ALLEN
WRENCH
M3 SET SCREW
1: See the chart below to determine the joining rod size.
2: Push the joining rod completely into the threaded post and
tighten the M3 set screw with the 1.5mm Allen wrench.
Transformer Type
150 Watt
300 Watt
600 Watt
Model Number
MT-150- 3"
MT-300- 3.4"
MT-600- 3.7"
Joining Rod Size
E
M3 SET SCREW
1.5MM ALLEN
WRENCH
3: Push the joining post half way onto the other end of the
joining rod and tighten the M3 set with the 1.5mm set
screw.
F
JOINING POST
M3 SET SCREW
1.5MM ALLEN
WRENCH
4
SLOPED STANDOFF
CONNECTOR
4: Push the sloped standoff connector completely into the
joining post and tighten the M3 set screw with the 1.5mm
Allen wrench.
Install the Monorail to Rigid Standoff
G
SLOPED CONNECTOR
3
JOINING POST
4
THREADED POST
1: Tighten the rigid standoff completely onto the sloped
connector threaded post.
STANDOFF
2