PLEASE CONTACT US: IF YOU ARE MISSING ANY PARTS, HAVE ANY DIFFICULTY IN ASSEMBLY, OR HAVE ANY
QUESTIONS REGARDING THE SAFE OPERATION OF THIS SPREADER. THIS MODEL INCLUDES LIFETIME
TECHNICAL SUPPORT. SUPPORT HOT LINE: 574-848-7491 or 800-294-0671, email: techsupport@earthway.com
HELPFUL HINTS: READ THE DIRECTIONS BEFORE ASSEMBLY
; If your spreader does not spread evenly, be sure the FRONT on the gear box points to the front of the spreader. The
impeller must turn clockwise. Reversing the gearbox will cause the impeller to turn counter clockwise. Clean the impeller
after each use as some fertilizer may become stuck on the impeller blades and will cause uneven spreading.
; Your spreader is designed to be pushed at three miles per hour, which is a brisk walking speed. Slower or faster speeds
will change the spread patterns. Wet fertilizer will also change the spread pattern and ow rate. Clean and dry your
spreader thoroughly after each use, wash between the shut-off plate and bottom of the hopper regularly. To prevent
rust, coat all metal parts (inside and out) including the chassis tubes with a light oil or corrosion preventative spray. Wash
between the shut off plate and bottom of the hopper and allow to dry before next use..
; Gears are permanently lubricated at the factory. Do not open the gearbox or dirt may enter.; If you use Rock Salt remove the agitator to prevent damage to the gearbox and remove salt from the hopper daily. Rock
Salt will reconstitute back into a solid block if left in the hopper overnight and will damage your gearbox if pushed with the
block in place.
IF YOUR SPREADER COMES SEMI ASSEMBLED, SKIP TO STEP #7
Upper Handle
WARNING
wax, or other lubricant.
Handle
Impeller
Pivot
Rod
Shaft
Frame
Brace
Gauge & Lever
Pivot
Cross
Brace
Lower
Handles
Control
Rod
Do not use air tools to assemble. To prevent
seizing, spray all nuts & bolts with oil, grease,
Gauge Overlay is snapped
over the metal gauge. Replace
the stop bolt assembly to se-
cure overlay on the gauge.
Frame
Foot
Gearbox
Axle
1. Remove and identify all of the loose parts from carton.
(Qty 4 #36300)
1/4-20 SS Locknut
(Qty 4 #36214)
1/4-20 X 1½”
Phillips Panhead
2. Position hopper on side. Install frame using (4) 1/4-20 x 1 ½” Pan Head Phillips machine
screws and (4) 1/4-20 nylon insert locknuts. First put bolts through holes in frame then through
holes in bottom of hopper. Secure with locknuts. TIGHTEN THESE LOCKNUTS NOW.
MADE IN THE USA
ROCK SALT AND POWDERED MATERIALS SHOULD
NOT BE USED IN THIS SPREADER AS IT WILL DAMAGE
GEARBOX AND CAN VOID WARRANTY.
USE ONLY GRANULAR MATERIALS.
Qty 1
C24HD
Only
36104
Qty 1
For
36305
36210
Qty 2
Qty 2
36214
Qty 4
36200
Qty 4
33117
Qty 1
36300
Qty 17
36209
Qty 4
36205
Qty 3
36404
Qty 18
36207
Qty 2
36105
Qty 1
36103
8-2014 Pt# 52142 PAGE 1
GEARBOX ASSEMBLY
EarthWay
EV-N-SPRED
®
Impeller
Pinion
Shaft
1/8 x 1-1/4”
Cotter Pin (#36105)
Cross Brace
Gearbox Brace
T
N
O
R
F
3. Install impeller onto pinion shaft. Insert 1/8” x 1¼” cotter pin
through impeller then through pinion shaft. Use hole nearest
gear box. Spread cotter pin to prevent from falling out. Next,
install the Cross Brace through the Gearbox Brace Support as
shown above.
4. Install Gearbox by inserting the pinion shaft into hole
in center of hoppers bottom. The word “FRONT” on the
gearbox must point to FRONT of the hopper.
5. Install the Lower Handles: insert 2¼” bolt with cupped
washer (C24HD) through second hole (approximately
in the middle of the Lower Handle) in lower handle and
through rst hole in frame and secure with locknut.
A. Now insert 1½” bolt through rst hole in lower handle,
then through frame brace, and nally into the threaded
connector in the Cross Brace. [NOTE: Numbers on frame
braces must be facing toward gearbox as shown.]
Install the Foot into the Frame and align the bolt holes in
the Foot and the Frame (a Phillips screwdriver or large
nail is helpful to align the parts)
B. Next insert 1½” bolt through other end of frame brace
and through second hole in frame through the foot and
install cupped washer (C24HD) and locknut.
6. Install the axle through the lower handle and then the gearbox and nally, through the other lower handle.
Now install the drive wheel to axle using pin hole nearest to lower handles as shown. Insert 2” cotter pin through wheel and
through axle. Bend with pliers to prevent pin from falling out.
NEXT Install coast wheel to axle, and then using outside pin hole on the axle (as shown on the left), insert 1” cotter pin through
axle [NOTE: The cotter pin does not go through the wheel]. Bend with pliers to prevent pin from falling out.
TURN SPREADER UPRIGHT ON TO WHEELS
7. NOTE: BEFORE INSTALLING THE GAUGE &
LEVER ASSEMBLY AND UPPER HANDLE TO THE
HANDLE SHAFT, SELECT THE BEST POSITION
FOR THE OPERATOR’S COMFORT. You can select
lower or upper positions for best t to the operator’s
height. Insert 2 ¾” bolt through the Gauge, then upper
handle and nally through handle shaft. See example
to the right.
DO NOT TIGHTEN LOCKNUT YET.
8. Insert pivot rod into shut off plate as shown below.
[TIP: Insert rod end from the top, then push down &
turn to lock in place.]
9. Insert other end of pivot rod into pivot and bracket
assembly as shown. [TIP: Insert rod end from the side
that has the angle attached to the bracket, then turn
to lock in place as shown at the right and above. The
correct positioning of the Pivot Bracket has the Angle
and Attaching Arm facing away from the gearbox.]
2 Position Handle
Lower Position
Upper Position
¼-20
Lock Nut
and
(Cupped Washer
for C24HD)
¼-20 x 2¾”
Hex Head Bolt
¼-20 x 2¼”
Hex Head Bolt
and (Cupped Washer
for C24HD)
Angle
Attaching
Arm
Insert Pivot Rod
into Shut-Off
and rotate to secure
nOticecuppedwAsherlOcAtiOns
fOr c24hd Assembly
PAGE 3
10. Install handle shaft to lower handles and pivot & bracket assembly as shown. Using (4)
1 ¾” bolts with cupped washers (C24HD) and (4) locknuts (2) cupped washers (C24HD).
[TIP: Attach right side rst with cupped washers on both nuts and bolts, then attach left (Pivot
Bracket) side with washers only on the bolt side]
TIGHTEN BOLTS AND NUTS NOW.
11. Install attened end of control rod in to lever on gauge
into Control Rod Tabbed hole as shown. Turn to lock in
place.
NEXT: Install (1) 1/4-20 Hex Nut [not a locknut] on to
Control Rod and thread halfway as shown below.
¼-20 X 1¾”
Hex Head Bolt
¼-20
Lock Nut
and (Cupped Washer
for C24HD)
and (Cupped Washer
for C24HD)
Setting #30
0
3
5
1
0
1
5
Gauge & Lever
0
3
5
1
0
1
5
Control Rod
Tabbed Hole
nOticecuppedwAsherlOcAtiOns
fOr c24hd Assembly
Insert Control Rod
into
Pivot Bracket
CALIBRATION POINT
Attach ¼-20 REGULAR
(NOT LOCKNUTS) Hex Nuts
at these points.
Notice the position
of the double bend point.
12. Next push lever forward to setting “0”. Align control rod with hole
in pivot bracket, pull lever backward to insert control rod through
hole in pivot bracket. [TIP: If the lever does not move easily, loosen slightly to make this step easier] Now install 1/4-20 regular nut on to
Control rod.
13. Pull lever back to setting “30” as shown. Next push pivot &
bracket forward so that the shut off plate in the hopper is in the full
open position. [NOTE: THE SETTING OF “30” ON THE GAUGE &
LEVER ASSEMBLY MUST OPEN THE SHUT-OFF COMPLETELY
FOR PROPER CALIBRATION.] Now tighten the nuts against the
pivot bracket to prevent change in calibration. Test by opening
and closing the Gauge & Lever a few times to ensure an accurate
calibration.
Lever Tensioning Nut
DO NOT TIGHTEN NUTS YET.
Control Rod
1/4-20 x 1”
Hex Head Bolt
Stainless
1/4-20 Lock Nut
Stainless
15. Install the two 1/4-20 x 1” Stainless Steel bolts into holes located
on each side of the hopper and secure with 1/4-20 lock-nut. Next slide
Debris Screen under the two bolts inside the hopper.
PAGE 4
14. Tension on the ow control lever may be adjusted by tightening
or loosening the tension nut as shown above.
16. Insert Agitator to pinion shaft on inside of hopper.
NOTE: Position of at side of agitator. This pin should
be installed as shown above.
17. For normal operation both doors should be fully opened. To reduce ow to the left side, partially or completely close the
S
p
r
e
a
d
P
a
t
t
e
r
n
door over the rear (LARGE) hole. To reduce ow to the right side, partially or completely close the door over the front (SMALL)
hole. Close both doors for a narrow center spread pattern.
WARNING: If the optional side deector is being used in the down position, the plate over the rear (LARGE) hole MUST BE
CLOSED or an over application of material will occur.
SPREAD PATH
FULL Rate (one pass)
HALF Rate (two passes)
Each adjustable port
has 8 positions
Both ports open
Both ports closed
One port closed
The settings furnished on the Setting Matrix are intended as a guide only. Variations in physical characteristics of material
applied, walking speed, and roughness of ground surface may require slightly different spreader settings. Due to these
conditions, Earthway Products, Inc. makes no warranty as to the uniformity of coverage actually obtained from the settings listed.
5-YEAR LIMITED WARRANTY
Earthway Products, Inc. warrants this product free of defects in original workmanship and materials for a period of 5-Years
to the end user with the original purchase receipt. If a manufacturing non-conformance is found, Earthway Products, Inc.
at its discretion will repair or replace the part(s) or product at no charge provided the failure is not the result of incorrect
installation, mishandling, misuse, tampering, or normal wear and tear as determined by Earthway. Earthway at its discretion
may require that the part(s) or product be returned along with the original purchase receipt at owners’ expense for examination
and compliance with the terms of this warranty. Do not return any product without rst receiving authorization from Earthway
Products, Inc. To seek remedy under this warranty, contact Earthway Products, Inc. at 574-848-7491, techsupport@earthway.
com or write to Earthway Products, Inc. P.O. Box 547 Bristol, Indiana 46507 and describe the nature of the manufacturing
defect. SPECIFIC LIMITATIONS: This warranty covers only the part(s) or product; any labor charges associated with repair
or replacement of non-conformances are specically excluded. Due to the corrosive nature of most fertilizers and ice melt
products, Earthway Products, Inc. makes no warranty against and specically excludes part(s) or product degradation or failure
due to corrosion or its effects. Clean and dry your spreader thoroughly after each use, as a preventative measure, coat all
metal parts with a light oil or silicon spray.
OPERATING INSTRUCTIONS
Before lling hopper, become familiar with the operation of this spreader.
5 Obtain proper setting for material to be used from the enclosed SETTING MATRIX included with this spreader, or from our
web site under the MANUALS SECTION.
5 Move stop bolt on rate gauge assembly to the proper setting.5 While pushing spreader forward, pull control lever back to stop bolt.5 To stop, push lever forward to close ow holes before you stop moving.5 When nished, empty any remaining material from hopper.5 Thoroughly wash spreader and allow to dry before storing. Apply coating of light oil to help prevent corrosion.5 If you use Rock Salt, remove agitator when using Rock Salt to prevent damage to the gearbox.
Earthway Products, Inc.
1009 Maple Street, PO Box 547
Bristol, IN 46507
For Your Records
Date Purchased
Place of Purchase
HOW TO ORDER SPARE PARTS
All spare parts listed may be ordered direct from
EarthWay Products, Inc.
Be sure to give the following information when ordering.
Model Number
Part Number
Part Description
Call (574) 848-7491, 800-294-0671, or email: parts@earthway.
11362001/4-20 X 1 1/2" HHCS S.S.3136208#6 X 3/8" TYPE 25 PHPS S.S.
1242237FRAME BRACE3211927SHUTOFF SUPPORT- LARGE
1324704CROSS BRACE (11.125")3311926SHUTOFF SUPPORT- SMALL
142 4111FRAME STAINLESS STEEL3431138#8 X 3/8" PMT #8 HD COARSE BLACK
1425108FRAME PAINTED35364041/4 CUPPED WASHER S.S.
1512109IMPELLER (9" DIA)36362091/4-20 X 1 3/4" HHCS S.S.
16361051/8" X 1 1/4" COTTER PIN S.S.3760027WING NUT ASSEMBLY BLACK
1760333NEW FLOATING GEAR BOX38371001/4-20 X 1" CARRIAGE BOLT ZINC
1812352BEARING (COMMERCIAL) EACH3912147SPACER
19361033/16 X 2" COTTER PIN S.S.4024500AXLE, COINED
201911713" DIA PNEUMATIC TIRE DRIVE 4125723FRAME FOOT PAINTED
21361043/16 X 1" COTTER PIN S.S.4125723-SSFRAME FOOT STAINLESS STEEL
22362051/4-20 X 2 1/4" HHCS S.S.
0
Using the EV-N-SPRED®
S
p
r
e
a
d
P
a
t
t
e
r
n
Adjustable Throwing Ports
with 8 repeatable settings
to balance the left or right
spread pattern to
the center.
Dual Port PRO Adjustable
Shut-Off System
The EV-N-SPRED® Dual Port PRO Adjustable Shut-Off System is
included on all professional models and allows the operator
to balance the spread pattern evenly across the full 180o
spread width, regardless of the weight or size of granular
material. By closing either the right and or left side
throwing ports you can balance the spread pattern to
exacting precision without compromising spread width
or application rate.
Each EV-N-SPRED
Shut-Off System drop hole has a corresponding 1/3rd
coverage area on the spread width of the spreader leaving a
feathered-edge for overlapping the spread path. The illustration to
the right shows each port and the corresponding 1/3rd coverage
area of the spread path. These ports can be adjusted to effectively
balance the spread pattern, giving equal amounts of material
across the full 180o spread pattern.
EV-N-SPRED®Dual Port PRO System Setup
Test all material prior to beginning your spreading job. You will need
a 50’ measuring tape, a small scale to weigh the material, bucket or
container to hold the material for re-weighing, chalk or a line marking
device, and (7) low baking tins. Using the EarthWay® Bag Calibrator
#77016 can greatly reduce the time needed for
determining the Setting Rates on any material but
is not mandatory to establish a setting rate.
1. Evaluate the material being spread by comparing
it to the following standard as a reference.
Large/Heavy is the size of a BB (⅛ in / 3mm), spread width is 20 - 30 feet (7.6 -
9.1 meters
Dual Port PRO Adjustable
®
FINE
MEDIUMLARGE
Gauge & Lever
15
Medium/Mixed (½ the size of a BB), spread width is 16 - 20 feet (4.8 - 7.6 meters)
Small/Fine (the size of sand), spread width is 12 - 16 feet (3.7 - 4.8 meters)
2. Add a small amount of the material into the spreader, enough to cover
the bottom (2-3 in / 5 - 7 cm) and begin to test for spread width.
Set the stop on the gauge to #15 and push the spreader several feet /
meters at normal walking speed on a at hard surface (where the material
will be visible), and OPEN the lever to the STOP while continuing to
walk for 3-4 paces, and CLOSE the shut-off and STOP (don’t move the
spreader from that position). Measure the spread width and evaluate
the spread pattern for even distribution on either side of the spread width
center line. TIP: Typical spread width references are listed above. The
spread width that you measure is used to calculate the actual Setting
Rate for the material.
SPREAD WIDTH
P
d
a
e
r
p
S
a
t
t
e
r
n
ADJUSTING THE EV-N-SPRED® DUAL PORT SHUT-OFF SYSTEM
1. Next, using the (7) low baking tins position, them in a straight line on
2-foot centers across the spread width as shown at the right.
Adjust the left or right variable throwing ports to EVEN THE SPREAD
pattern. TIP: For large/heavy materials, close the LEFT SIDE (LINES)
port slightly before you start your EV-N-SPRED® test. For small/light
materials, open the LEFT SIDE (LINES) port fully and close the RIGHT SIDE (DOTS) port slightly before you start your EV-N-SPRED® test.
With BOTH ports closed, the spread is only from the center port, and
will give you a 3-4ft spread width in the center of the spreader - great for medians.
Begin pushing the spreader several feet before the line of tins and at
normal walking speed. Walk along the Center Line, and OPEN the
Lever to the STOP 3-4 paces before the line of tins and continue walking
past the tins 1 or 2 paces and CLOSE the Lever and STOP.
Visually evaluate the material in the baking tins to determine if your
spread pattern is balanced - having the same amount of material in each baking tin.
Empty each tin back into the spreader, adjust the ports and RETEST
until you are satised that the coverage is balanced.
S
p
2’2’2’2’2’2’
P
d
a
e
r
a
t
t
e
r
n
ESTABLISH THE SETTING RATE
2. Remove the material from the hopper, and mark the distance that you
need to travel with the spreader to attain the designated coverage area
- i.e. 1,000 square feet using the spread width you determined earlier.
Above is a chart to help determine the distance needed for 1,000 square
foot calculation.
Mark the START and END POINTS on the surface required for the test.
Weigh a small amount (10-20lbs/4-9kg) of the material, and add that into
to the spreader. Using the Setting Matrix included with the spreader,
estimate a setting rate based on material manufacturers recommendations
and adjust the STOP on the Gauge to that position.
Now to test, start walking 1-2 paces before the START LINE and OPEN
the Lever to the stop and then CLOSE when you cross the END POINT LINE.
Pour the remaining material from the spreader and weigh to calculate the
amount applied over the area. Adjust the Setting Rate to a higher number
if you need to increase the application rate, or to a lower number if you
applied too much in the test.
You may need to repeat this process to acquire the exact rate.
The EV-N-SPRED® Dual Port PRO Adjustable Shut-Off System ensures
that EarthWay® Professional spreaders evenly spread all types of fertilizers, seed, ice melt, or other granular
products, and is only available from EarthWay®.
Pt. #53192
30
0
3
5
1
0
1
5
Insert Control Rod
into the Pivot Bracket
Attach 1/4-20 Regular
Hex Nuts at these points.
Notice the position
of the double bend point.
It must be at this location
Fig 1
Fig 2
Calibration Techniques
EV-N-SPRED®
Shut-Off
Fully Open
Screw
Tighten
Drop holes shown fully open.
Cable Type Adjustment
are registered trademarks of Earthway Products, Inc. Use of trademarks are prohibited
®
slide outer cable in/out for calibration
Loosen/tighten screw on cable clamp then
, and SPRAY-PRO
®
Slide Outer
to Calibrate
Control Wire
, FLEX-SELECT
®
EV-N-SPRED
®
unless approved by Ear thway Products, Inc. 1009 Maple Street Bristol, Indiana 46507
Broadcast Setting Matrix
1. Open the shut-off so that the drop holes are completely open as illustrated to the right.
2. Review the Control Lever position - if it is set so that the forward edge is at #30, you are calibrated. If not,
How to ensure your spreader is properly calibrated
Make sure the drop holes in the bottom of the hopper are fully open when the Rate Control handle is on #30. If not, please
adjust control cable or control rod to allow for a full open hopper position at #30.
Rod Type Adjustment
you need to adjust the control rod at the pivot bracket shown in Fig 1.
A. If your shut-off is not able to open fully as in step #1. Loosen the top nut a few turns, then loosen the lower nut
so that it allows you to push the shut-off open fully. Next tighten each nut so that they contact the pivot bracket
without moving it, and then carefully tighten each nut fully so they do not loosen during use. Recheck adjustment
Chart 3 to determine the Spread Width between Spread Paths
CHART 1
LBS/1,000 SQ FT
5,000 10,000 15,000
5 LBS.1.00.50.3
10 LBS.2.01.00.7
B
15 LBS.3.01.51.0
A
18 LBS.3.61.81.2
G
20 LBS.4.02.01.3
25 LBS.5.02.51.7
W
WIDTH
SPREAD
CLOSE
CONTROL
OPEN
CONTROL
OPENCLOSE
Step 1: Use Chart 1 to estimate the number of LBS/1,000 square feet of coverage
ESTABLISHING A SETTING RATE
Step 2: Find the closest LBS/1,000 square feet in Chart 2 that you estimated using
Step 3: Determine the Spread Width by evaluating the particle or seed size in
The settings furnished on the Rate Setting Matrix are intended as a guide only. Variations in physical characteristics of material applied, walking speed, and roughness
of ground surface may require slightly different spreader settings. Due to the above conditions, EPI makes no warranty as to the uniformity of coverage actually
obtained from the settings listed.
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.