PLEASE CONTACT US IF YOU ARE MISSING ANY PARTS, HAVE ANY DIFFICULTY IN ASSEMBLY, OR HAVE ANY
QUESTIONS REGARDING THE SAFE OPERATION OF THIS SPREADER. THIS MODEL INCLUDES LIFETIME TECHNICAL
SUPPORT. HOT LINE: 574-848-7491 OR 800-294-0671, EMAIL: TECHSUPPORT@EARTHWAY.COM
HELPFUL HINTS: READ THE DIRECTIONS BEFORE ASSEMBLY
; If your spreader does not spread evenly, be sure the FRONT on the gear box points to the front of the spreader. The
impeller must turn clockwise. Reversing the gearbox will cause the impeller to turn counter clockwise. Clean the impeller
plate after each use. Fertilizer stuck on the impeller blades will cause uneven spreading.
; Your spreader is designed to be pushed at three miles per hour, which is a brisk walking speed. Slower or faster speeds
will change the spread patterns. Wet fertilizer will also change the spread pattern and ow rate. Clean and dry your
spreader thoroughly after each use. Coat all metal surfaces (inside & outside of chassis) with light oil or silicon spray to
help prevent corrosion. Wash between the shut off plate and bottom of the hopper. Do not use powdered materials.
; Gears are permanently lubricated at the factory. Do not open the gearbox or dirt may enter.
R
R
Qty 9
36300
Qty 6
36105
Qty 1
31106
Qty 2
32103
31120
Qty 5
12148
Qty 2
(Qty 4 #36300)
1/4-20 SS Locknut
36214
Qty 4
12152
Qty 2
32100
Qty 2
31100
Qty 4
33117
Qty 1
36210
Qty 2
1. Remove and identify all loose parts from carton.
33109
Qty 1
33108
Qty 1
ROCK SALT and POWDERED
MATERIALS should not be used in this
spreader as it will damage gearbox and can
void warranty.
Use only granular materials.
13
23
12
11
28
26
16
31
24
17
vvvvvvvv
vvvvvvvv
9
25
(Qty 4 #36214)
1/4-20 X 1½”
Phillips Panhead
2. Position hopper on side. Install frame using (4) 1/4-20 x 1-1/2” Pan
Head Phillips bolts and (4) 1/4-20 nylon insert locknuts. First put bolts
through holes in frame then through holes in bottom of hopper. Secure
with locknuts. TIGHTEN THESE LOCKNUTS NOW - DO NOT
TIGHTEN WITH POWER TOOLS.
12-2011 Pt# 52164 PAGE 1
Impeller
EarthWay
EV-N-SPRED
®
Pinion
Shaft
1/8 x 1-1/4”
Cotter Pin (#36105)
Cross Brace
Gearbox Brace
COAST WHEEL
HOLE
DRIVE WHEEL
T
N
O
R
F
HOLE
Gearbox & Axle Assembly
3. Install impeller onto pinion shaft. Insert 1/8”x 1¼” cotter pin
through impeller then through pinion shaft. Use hole closest to the
gear box. Spread cotter pin to prevent from falling out. Next insert
Cross Brace thru the Gearbox Brace as shown above.
Axle Bearing
Notch
Coast wheel side
Flat
Side
1/4-20 x 1-1/2”
Hex Head Bolt
Step 6B
Step 6C
EV-N-SPRED
EarthWay
®
4. Install gear box by inserting the pinion shaft into hole in
center of hoppers bottom. The word “FRONT” on the gearbox
must point to Front of the hopper. Follow label instructions on
hopper.
Drive wheel side
Gearbox & Axle Assembly
Frame brace
Dimples
Cross Brace
Frame
Impeller
1/4-20 x 1-1/2”
Pan Head Bolt
5. Install axle bearings to both lower handles.
NOTE: Notch on bearings and lower
handles. Bearings must go through at side
of lower handle.
NOW GO BACK AND TIGHTEN ALL NUTS AND BOLTS STARTING WITH FIRST STEP.
PAGE 2
1/4-20 x 2-1/4”
Hex Head Bolt
Step 6A
Shut-Off
Lower Handle
1/4-20 Locknut
Pivot Rod
6. A - Install lower handles onto axle to both sides as shown. Insert 2¼” bolt through second
hole in lower handle and through rst hole in frame install locknut. DO NOT TIGHTEN.
B - Now insert 1½” bolt through rst hole in lower handle. Then through frame brace.
NOTE: Dimples on frame brace must be facing toward gear box as shown. Next into threaded
connector in cross brace. DO NOT TIGHTEN.
C - Next insert 1½” bolt through other end of frame brace and through second hole in frame
install locknut.
DO NOT OVER TIGHTEN.
S
L
I
Axle Bushing
D
E
2” Cotter Pin
1” Cotter Pin
Lower
Handle
Frame
Brace
Cross Brace
Gearbox
Axle Assembly
7. Slide axle bushing over axle and into axle bearing to both
sides as shown.
8. Install drive wheel onto the axle and align with the cotter pin hole
nearest to lower handles as shown. Insert 2” cotter pin through wheel
and through axle. Bend with pliers to prevent pin from falling out.
9. Install coast wheel onto the axle fully, then using outside cotter pin
hole, insert 1” cotter pin through axle (not thru the wheel). Bend with
pliers to prevent pin from falling out.
TURN SPREADER UPRIGHT ON TO WHEELS.
Shut-Off
Plate
Pivot Rod
with extra bend
Rotate
Pivot
1/4-20
Locknuts
POSITIONS
LOWER
MIDDLE
UPPER
Handle Shaft
Upper Handles
Handle
Spacer
1/4-20 x 2”
Gauge &
Lever Assembly
Hex Head
Bolt
10. NOTE: BEFORE INSTALLING GAUGE AND UPPER HANDLES TO HANDLE SHAFT,
UPPER HANDLES FEATURE THREE POSITIONS FOR OPERATOR’S COMFORT.
Select one of the three positions for comfortable use. If operator chooses middle or upper
positions, use handle spacer in hole nearest to handle grips as shown to the right.
Insert 2” bolt through upper handle, then through handle spacer
through other upper handle and secure with locknut.
DO NOT TIGHTEN LOCKNUT YET. TIGHTEN THIS NUT LAST.
Now slide the upper handle assembly over the handle shaft (on the end with the bolt holes closer to the end).
Install gauge & lever using (2) 2” bolts. Be sure gauge is on left hand
side. Tighten locknuts to gauge rst.
TIGHTEN ALL HARDWARE NOW.
Pivot
Rod
Angle
11. Insert pivot rod into shut-off plate as shown.
Turn to lock in place.
Attaching
Arm
12. Insert other end of pivot rod into pivot and bracket assembly
as shown. Turn to lock in place.
Insert Pivot Rod
into Shut-Off
and rotate to secure
Long end
PAGE 3
13. Install handle shaft to lower handles and pivot & bracket assembly as shown. Using 1/4 -20 x 2” bolts and
locknuts. TIGHTEN BOLTS AND NUTS NOW.
1/4 - 20 Lock-nut
Pivot Bracket
1/4 - 20 x 2” Bolt
14. Install (1) 1/4-20 Hex
nut (not a locknut) on to
Long End
Holes are farther
from one end
Gauge & Lever
Handle Shaft
30
Control Rod
Tabbed Hole
control rod as shown.
¼-20
Hex Nuts
Control Rod
Pivot
Lever
Tension Nut
Rod
Pivot
Bracket
Control
Rod
15. Install attened end of control rod in to lever on gauge as shown. Turn to lock in place. Next push lever forward to setting “0”. Align
control rod with hole in pivot bracket, pull lever backward to insert control rod through hole in pivot bracket. Now install 1/4-20 Hex nut on
to control rod.
16. Pull lever back to setting “30” as shown. Next push pivot & bracket forward so that the shut off plate in the hopper is in the full open
position. REMEMBER SETTING “30” ON THE FLOW CONTROL LEVER MUST PLACE THE SHUT-OFF PLATE IN THE FULL OPEN POSITION TO BE PROPERLY CALIBRATED. Now tighten the nuts against the pivot bracket to prevent change in calibration.
17. Tension on the ow control lever may be adjusted by tightening or loosening the tension nut as shown.
18. Insert agitator to pinion shaft on inside of hopper.
Note: the position of at side of the agitator. This pin
should be installed as shown.
1/4-20 x 1”
Hex Head Bolt
Stainless
19. Install debris screen into hopper, then insert 1/4-20 x 1”
1/4-20 Lock Nut
Stainless
Stainless Steel Hex Bolt thru the hole in the side wall of the hopper.
Secure with Stainless Steel lock nut - TIGHTEN WITH HAND
PAGE 4
TOOLS ONLY
5-YEAR LIMITED WARRANTY
Earthway Products, Inc. warrants this product free of defects in original workmanship and materials for a period of 5-Years to the end user
with the original purchase receipt. If a manufacturing non-conformance is found, Earthway Products, Inc. at its discretion will repair or
replace the part(s) or product at no charge provided the failure is not the result of incorrect installation, mishandling, misuse, tampering,
or normal wear and tear as determined by Earthway. Earthway at its discretion may require that the part(s) or product be returned along
with the original purchase receipt at owners’ expense for examination and compliance with the terms of this warranty. Do not return any
product without rst receiving authorization from Earthway Products, Inc. To seek remedy under this warranty, contact Earthway Products,
Inc. at 574-848-7491, techsupport@earthway.com or write to Earthway Products, Inc. P.O. Box 547 Bristol, Indiana 46507 and describe
the nature of the manufacturing defect. SPECIFIC LIMITATIONS: This warranty covers only the part(s) or product; any labor charges
associated with repair or replacement of non-conformances are specically excluded. Due to the corrosive nature of most fertilizers and ice
melt products, Earthway Products, Inc. makes no warranty against and specically excludes part(s) or product degradation or failure due to
corrosion or its effects. Clean and dry your spreader thoroughly after each use, as a preventative measure, coat all metal parts (inside and
outside of the steel tubing) with a light oil or silicon spray.
OPERATING INSTRUCTIONS
Before lling hopper, become familiar with the operation of this spreader.
5 Obtain proper setting for material to be used from the enclosed SETTING MATRIX included with this spreader, or from our web site
under the MANUALS SECTION.
5 Move stop bolt on rate gauge assembly to the proper setting.5 While pushing spreader forward, pull control lever back to stop bolt.5 To stop, push lever forward to close ow holes before you stop moving.5 When nished, empty any remaining material from hopper.5 Thoroughly wash spreader and allow to dry before storing. A coating of light oil will help prevent corrosion.5 If you must use Rock Salt, remove agitator when using Rock Salt to prevent damage to the gearbox.
The settings furnished on the Rate Setting Matrix are intended as a guide only. Variations in physical characteristics of
material applied, walking speed, and roughness of ground surface may require slightly different spreader settings. Due to the
above conditions, the manufacturer makes no warranty as to the uniformity of coverage actually obtained from the settings
listed.
SPREAD PATH
FULL Rate (one pass)
HALF Rate (two passes)
HOW TO ORDER SPARE PARTS
All spare parts listed herein may be ordered direct from the manufacturer. Be sure to give the following information when ordering.
; Model Number; Part Number; Part Description
You can contact us by calling (574) 848-7491 or 800-294-0671 to place an order with a credit card.
Questions? Parts@earthway.com
PAGE 5
30
13
Earthway Products, Inc.
1
19
3
13
14
39
40
19
38
19
4
8
6
12
16
17
7
21
7
8
9
77002
OPTIONAL
Heavy-Duty
Rain Cover
2
20
11
60060R
OPTIONAL
Heavy-Duty
Rain Cover
&
Side Deflector Kit
27
15
33
35
60166R
OPTIONAL
3-Side Salt
Deflector Kit
27
15
22
6
20
37
18
23
24
15
25
6
5
28
23
15
25
26
34
P.O. Box 547
Bristol, IN 46507
Phone: 800-294-0671
www.earthway.com
32
29
31
36
h
S
t
e
r
t
a
E
t
i
n
g
s
0
2
0
1
3
0
0
o
c
s
e
L
0
3
a
y
W
Standard Settings (12196) Gauge Overlay and
OPTIONAL Lesco Settings (12195) Gauge Overlay
2170 BroadCast spreader ~ Parts List
KEY # PART #DESCRIPTIONKEY #PART #DESCRIPTION
140003SQUARE SCREEN2136208#6 X 3/8" TYPE 25 PHPS S.S.
260335HOPPER ASSEMBLY2212317SHUT OFF PLATE
333117AGITATOR2325222LOWER HANDLE
412209HOPPER BUSHING2425106FRAME
5362141/4-20 X 1 1/2" PHPMS S.S.2544249FRAME BRACE
6321031/4-20 NYLON I NS LOCKNUT ZINC2624704CROSS BRACE (11.125")
7362101/4-20 X 1" HHMS S.S.273110 61/4-20 X 2 1/4" HHCS ZINC
8311201/4-20 X 2" HHCS ZINC281210 9IMPELLER (9" DIA)
960300PIVOT & BRACKET ASSEMBLY29361051/8" X 1 1/4" COTTER PIN S.S.
10321031/4-20 NYLON INS LOCKNUT ZINC3012274REPLACEMENT GRIP
1144251PIVOT ROD3160334GEAR BOX & AXLE ASSEMBLY
1260298GAUGE & LEVER ASSEMBLY3212148AXLE BEARI NG
136 0175UPPER HANDLE SQUARE W/GRIP3312152AXLE BUSH ING
1412344H A N DLE S PAC E R343 31093/16" X 2" COTTER PIN ZINC