Doremi DCP-2000 User Manual

DCP-2000 Packaging Instruction
CAUTION:
Please save the packaging materials. RMA must be returned in original packaging
When shipping a DCP-2000 with a silver front panel, HDD must be stored in their
proper packaging, outside of the DCP-2000 chassis, to avoid damage during shipment.
Improper packaging for return of product could result in loss of warranty
Apply the procedure below in order to properly package a DCP-2000 for any transport or shipment:
CAUTION: Some steps only apply to DCP-2000 fitted with a silver front panel (P/N: OEM-
DOR-316) and other steps only apply to chassis with a black front panel (P/N: OEM-DOR-315). Such specific steps are mentioned in the procedure below.
(a) Black Front Panel (b) Silver Front Panel
Figure 1: DCP-2000 – (a) Black Front Panel, (b) Silver Front Panel
Select SHUT DOWN from the LOGOUT menu: "Menu->Logout...-
>Shutdown".
2. Unplug all cables and remove the DCP-2000 from its rack – if any.
3. For chassis with a silver front panel ONLY (P/N: OEM-DOR-316):
Remove each HDD by pressing on the blue button located on its front side in
order to release the grey handle and by opening the handle all the way until it clicks, as presented below:
D2K.DP.000468.DRM Page 1 Version 1.1
Doremi Cinema LLC
Grey handle opened all the way
Figure 2: DCP-2000 HDD Cage – HDDs Removal
Then pull the drive out of the HDD cage and close the grey handle - by pushing it toward the HDD - until it clicks.
Grey handle closed
Figure 3: HDD Removed from the DCP-2000 – Grey Handle Locked
Make sure to close the DCP-2000 HDD front panel door.
Put the three drives into the HDD dedicated box and cover them with a piece of
foam before closing this individual box as illustrated below:
Piece of foam
above the
HDDs
HDDs
(a) (b)
Figure 4: HDD Dedicated Box – (a) HDDs, (b) Foam Covering HDDs
D2K.DP.000468.DRM Page 2 Version 1.1
Doremi Cinema LLC
Loading...
+ 2 hidden pages