1
3
DonJoy® X-Act ROM™ Lite
APPLICATION INSTRUCTIONS
Initial Preparation |
2 Position Brace |
|
|
|
|
|
|
|
|
|
a. Position under the leg. |
|
|
|
|
|
|
b. Shorter upright is applied to the thigh |
|
|
|
|
|
|
|
|
a. Pull out of the bag |
c. Roll out the brace |
|
|
|||
b. Open straps |
|
|
|
|
|
|
Align first upright |
4 |
|
Foam liners |
|||
|
|
|
|
|
|
|
a.Centered midline to the leg and midline to the patella
5 Position additional upright
a.Begin with upper calf liner
b.Wrap additional liners snuggly around the leg
6 Strapping
a. Position and press into place |
a. Pull all slack out of straps |
b. Be sure hinges are at equal height |
b. Loop through the D-rings and fasten the |
|
2 straps closest to the knee |
|
i. The upper calf being first |
|
c. Secure additional straps |