Dell W-AP124, W-AP125 Owner's Manual

AP-120-MNT-WJ Access Point Enclosure
APenc_011
Top Cover Base
M4x25mm
Torx Screw
T-20 Torx Key
9/16” Rail
Adapter
Clear
Windows
Siemon Connector
Plate
Siemon 45*
Blanking Plates
Keystone
Blanking Plates
Keystone
Connector
Plate
Blank Plate
Parts not to scale
Installation Guide

Introduction

The AP-120-MNT-WJ access point (AP) enclosure allows you to install an AP-121 or AP-125 access point on the wall, directly over an installed junction box. Additionally, this enclosure can be mounted to the ceiling, using ceiling tile rails.
The AP-120-MNT-WJ kit includes the following pieces:
1x Keystone connector plate1x Siemon connector plate1x Blank plate
z Blank fillers for unused connectors
2x Keystone
2x Siemon z 1x M4 x 25mm T-20 Torx screw z 1x T-20 Torx key z 1x white paper label sheet z 2x clear window to cover labels z 9/16" rail adapter

Additional Tools

z A screwdriver that matches the screws in the cover plate over the installed junction box z (Optional) flat-head screwdriver or similar tool to punch out antenna access cutouts
0510583-03 | July 2010 1

Installing the AP Enclosure

NOTE
APenc_002
APenc_003
To install the AP enclosure:
For ceiling mounted APs, skip step 1 and proceed to step 2
1. Attach the base plate as follows: a. Remove the cover plate from an installed junction box (Figure 1). Save the screws.
Figure 1 Removing the installed cover plate
b. Snap the cable connectors out of the removed cover plate and set the cover plate aside. Identify the
Ethernet cable that will be connected to the AP-121 or AP-125. The Ethernet cable must have a male RJ-45 connector.
c. Attach the enclosure base plate to the junction box using the screws from the removed cover plate
(Figure 2).
d. Skip step 2 and proceed to step 3.
Figure 2 Attaching the base plate
2 AP-120-MNT-WJ Access Point Enclosure | Installation Guide
2. To install the AP enclosure on a ceiling rail:
APenc_008
Ceiling tile
Ceiling tile rail
Align tabs
with rail
Installing
9/16” Rail Adapter
Rotate AP
until it clicks
into place
APenc_004
Mounting Posts
Mounting Holes
a. Pull the necessary cables through a prepared hole in the ceiling tile near where the AP will be placed.
The prepared hole must line up with the cable pass-through in the base plate. b. (Optional) if the ceiling rail is 9/16", install the ceiling rail adapter (Figure 3). c. Hold the enclosure base next to the ceiling rail with the ceiling rail at approximately a 30-degree
angle to the ceiling tile rail (Figure 3). d. Rotate the enclosure base clockwise until the device clicks into place on the ceiling rail.
Figure 3 Installing the AP on a ceiling rail
3. Connect the Ethernet cable to Ethernet port 0 on the AP. Hold the unused cables down and to the right of the screw post as you continue with the next step.
4. Attach the AP to the mounted base plate as follows: a. Position the antennas on the AP along the sides of the unit. b. Locate the mounting posts on the base plate and the mounting holes on the AP (Figure 4).
Figure 4 Preparing to attach the AP
AP-120-MNT-WJ Access Point Enclosure | Installation Guide 3
Loading...
+ 5 hidden pages