DCS ADN120X48 Installation Manual

DCS BY FISHER & PAYKEL ACCESS DOORS ADN
MODEL: ADN1-20x30
MODEL: ADN1-20x24 SIDE VIEW
MODEL: ADN1-20x36
35-15/16”
MODEL: ADN1-20x48
47-15/16”
1-1/4”
4-1/4”
2”
21-7/8”
21-7/8”
5/16”
15/16”
2-1/8”
Anchor hole
(Ø 1/4”)
Ve
INSTALLATION INSTRUCTIONS
ACCESS DOOR SPECIFICATIONS:
CUTOUT SPECIFICATION - PROUD INSTALLATION
ACCESS DOOR
MODELS
ADN1-20x48 46" 20”
ADN1-20x36 34" 20”
ADN1-20x30 28" 20”
ADN1-20x24 22" 20”
90º
Vent*
A
B
Vent*
nt*
NOTE: The cutout of each corner should be 90° angle in order for the access doors to t properly. * Island installation to use minimum of 3 vents providing 10 sq. in. per vent (typical).
A
(-0”, +1/8”)B(-0”, +1/8”)
INSTALLATION INSTRUCTIONS
1. Slide frame into opening (see cutout dimensions in chart above).
2. Check for proper alignment.
3. Using the four slotted holes in the frame as a guide, pre drill four pilot holes on the left & right sides of your island. Secure the unit using screws and anchors suited for the type of cabinet material.
4. Install the access door and check for proper alignment of doors and frame.
CUTOUT SPECIFICATION - FLUSH INSTALLATION
Ve
nt*
90º
Vent*
ACCESS DOOR
MODELS
ADN1-20x48 48 3/16" 22 1/16”
ADN1-20x36 36 3/16” 22 1/16”
A
B
Vent*
ADN1-20x30 30 3/16” 22 1/16”
ADN1-20x24 24 3/16” 22 1/16”
A
(-0”, +1/8”)B(-0”, +1/8”)
NOTE: The cutout of each corner should be 90° angle in order for the access doors to t properly. * Island installation to use minimum of 3 vents providing 10 sq. in. per vent (typical).
Minimum 3/16” (4 mm) cutout clearance around front frame
2” (51 mm)
D
A frame should be constructed 2” (51 mm) setback from the front face of the product to both push the product up against and conceal the cutout clearance around the front frame.
The frame should locate the access door assembly in the center of the cutout, and be fastened to the enclosure such that the unit is reliably secured in place.
Important!
Do not seal the product in with silicone caulk or similiar. Doing so will result in the product being difficult to remove for servicing.
FRONT
SIDE
INSTALLATION INSTRUCTIONS
1. Slide frame into opening (see cutout dimensions in chart above).
2. Check for proper alignment.
3. Using the four slotted holes in the frame as a guide, pre drill four pilot holes on the left & right sides of your island. Secure the unit using screws and anchors suited for the type of cabinet material.
4. Install the access door and check for proper alignment of doors and frame.
CARE & MAINTENANCE
All parts of the Professional Access Doors can be cleaned with hot soapy water, rinsed, dried and bued to a shine with a soft, heavy cloth. Always try this rst, as it is the mildest cleaning procedure. Always rub in the direction of the grain. Use only clean sponges, soft cloths, paper towels, plastic non-metal soap pads for cleaning or scouring as recommended in this section. Use only soap pads with soap still in them. An empty pad can scratch.
After cleaning, use a stainless steel polish, such as Stainless Steel Magic® applied to the door and handle surfaces. To touch up noticeable scratches in the stainless steel, sand very lightly with wet 100 grit emery paper in the direction of the grain.
NOTE: Stainless steel tends to corrode in the presence of chlorides and suldes, especially in coastal
areas. To ensure corrosion prevention, wash all stainless steel surfaces every 3-4 weeks with fresh water and stainless cleaner.
Loading...
+ 2 hidden pages